2013, 10-25 Permit SW-13001881 SewerSPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW-13001881
Permit Issued Date: 10/25/2013
Expiration Date: 10/25/2014
Project Description:
Project Name:
Primary Contact:
Phone:
SEWER CONNECTION
S GREENACRES
JEWELL EXCAVATING & CONST INC
509-927-9600
Applicant: JEWELL EXCAVATING & CONST INC
Address:
Phone:
Email:
PO BOX 280
GREENACRES, WA 99016
509-927-9600
SITE INFORMATION:
Site Address:
Parcel Number:
16804 E INDIANA AVE
45124.0145
Assessor's Description: PLAT "A" GREENACRES IRRIGATION DISTRICT
PTN TR 31 DAF; BEG AT NE COR TR 31, TH W
ALG N LN 125FT TO TRUE POB, TH CONT W ALG
N LN 260FT, TH S PARA WITH E LN TR 31 500FT,
TH N18DEG 10MIN 32SDS W 73.66
Inspection Area: : (509)-477-3675
Zoning:
Owner:
Address:
Phone:
Email:
Water District: Consolidated Irrigation
District #19
DEWITT, WALTER & MARIANNE
16804 E INDIANA AVE
SPOKANE VALLEY, WA 99016
Fire District: Spokane Valley Fire
Land Area: 4.82 Acre(s)
CONTRACTOR INFORMATION:
JEWELEC033JG, Exp. 04/07/2014
JEWELL EXCAVATING & CONST INC
PO BOX 280 GREENACRES, WA 99016
509-927-9600
DETAILS:
Class
SEWER
FEE DETAIL:
Processing - Utilities
Utilities Permit
Type
SEWER CONNECTION
Total Fee:
$26.32
$125.00
$151.32
Quantity Unit Charge Value
1 $125.00 $125.00
$125.00
CONDITIONS:
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
Inside Public Transit Benefit Area
CALL 1-800-424-5555 BEFORE YOU DIG —AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES
DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT
ALLOWS FOR A 30-MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES.
Date Printed: 10/25/2013 09:11:53 Project Coordinator: Kathy Cummings
SPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW-13001881 Permit Issued Date: 10/25/2013
Expiration Date: 10/25/2014
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 10/25/2013 09:11:53 Project Coordinator: Kathy Cummings