Loading...
HomeMy WebLinkAbout2013, 08-09 Permit SW-13001395 SewerSPOKANE COUNTY UTILITIES PERMIT Application Number: SW-13001395 Permit Issued Date: 08/09/2013 Expiration Date: 08/09/2014 Project Description: Project Name: Primary Contact: Phone: SEWER CONNECTION SOUTH GREENACRES NORM'S EXCAVATING INC 509-928-0580 Applicant: NORM'S EXCAVATING INC Address: Phone: Email: PO BOX 30873 SPOKANE, WA 99223 509-928-0580 SITE INFORMATION: Site Address: Parcel Number: 16908 E INDIANA AVE 45124.0125 Assessor's Description: GREENACRES IRR DIST PLAT A N1/2 OF BLK 30 EXC E436' ALSO EXC PTN DAF: BEG AT SE COR OF N1/2 OF BLK 30 TH N 14.65FT TH N89'18'16"W 194.01 TO W LN OF N1/2 OF BLK 30 TH S00°00'37E 16.78FT TO SLY L Inspection Area: : (509)-477-3675 Zoning: Owner: Address: Phone: Email: Water District: Consolidated Irrigation District #19 LOWEREE, ROBERT 16908 E INDIANA AVE GREENACRES, WA 99016-8546 Fire District: Spokane Valley Fire Land Area: 58950 Square Feet CONTRACTOR INFORMATION: NORMSEI972BM, Exp. 02/06/2015 NORM'S EXCAVATING INC PO BOX 30873 SPOKANE, WA 99223 509-928-0580 DETAILS: Class SEWER Type Quantity Unit Charge Value FEE DETAIL: Processing - Utilities Utilities Permit SEWER CONNECTION Total Fee: $26.32 $125.00 $151.32 1 $125.00 $125.00 $125.00 CONDITIONS: Inside Public Transit Benefit Area Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30-MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. Date Printed: 08/09/2013 10:50:28 Project Coordinator: Kathy Cummings SPOKANE COUNTY UTILITIES PERMIT Application Number: SW-13001395 Permit Issued Date: 08/09/2013 Expiration Date: 08/09/2014 INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 08/09/2013 10:50:28 Project Coordinator: Kathy Cummings