Loading...
2013, 07-23 Permit SW-13001285 SewerSPOKANE COUNTY UTILITIES PERMIT Application Number: SW-13001285 Permit Issued Date: 07/23/2013 Expiration Date: 07/23/2014 Project Description: SEWER CONNECTION Primary Contact: ROGERS, STACEY B & LISA M Phone: 509-891-5687 Applicant: ROGERS, STACEY B & LISA M Address: 17602 E INDIANA AVE GREENACRES, WA 99016 Phone: 509-891-5687 Email: SITE INFORMATION: Site Address: 17602 E INDIANA AVE Owner: ROGERS, STACEY B & LISA M Parcel Number: 55073.1138 Address: 17602 E INDIANA AVE GREENACRES, WA 99016 Phone: 509-891-5687 Assessor's Description: GREENACRES IRR DIST A TR A OF SP 93-904 Email: AUDITOR'S #4004754 BK 13 PG 12-13 BNG A PTN OF BLK 27 Inspection Area: : (509)-477-3675 Water District: Consolidated Irrigation Fire District: Spokane Valley Fire District #19 Zoning: Land Area: 31536 Square Feet CONTRACTOR INFORMATION: OWNER, Exp. 12/31/2015 OWNER NOT KNOWN AT TIME OF ENTRY UNKNOWN, UK 00000 DETAILS: Class SEWER FEE DETAIL: Processing - Utilities Utilities Permit Type SEWER CONNECTION Total Fee: $26.32 $125.00 $151.32 Quantity Unit Charge Value 1 $125.00 $125.00 $125.00 CONDITIONS: Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. Inside Public Transit Benefit Area CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30-MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. ___________________________________________________ Date Printed: 07/23/2013 09:16:53 Project Coordinator: Julie Shatto SPOKANE COUNTY UTILITIES PERMIT Application Number: SW-13001285 Permit Issued Date: 07/23/2013 Expiration Date: 07/23/2014 INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 07/23/2013 09:16:53 Project Coordinator: Julie Shatto