Loading...
2010, 03-02 Permit App 10000556 MH4„•0* Valley t CITY OF SPOKANE VALLEY Community Development Department Permit Center 11703 East Sprague Avenue, Suite B-3 Spokane Valley, WA 99206 Tel: (509) 688-0036 Fax: (509) 688-0037 oermitcenterOspokanevallev. orq (Staff Use Only) PERMIT NUMBER: `4J O S > PERMIT FEE: RECEIVED \ CSV PERMIT CENTER R022010 Project 4-- MANUFACTURED HOME PERMIT APPLATIO 0 OTHER SITE ADDRESS: I +7 9 j,j 1^ ASSESSORS PARCEL NO.: i LEGAL DESCRIPTION: BUILDING OWNER NAME: NAME: 06-4 , f ,4 '- ` `•ca ADDRESS: / r.2.3 / �j exw c,ees CITY + e (/ ft //`e. STATE: .iJ Q - el, Seca CONTACT NAME: ,� PHONE: -��ra�� ' (/02�$� FAX: CONTRACTOR NAME: -6 • 2L MAILING ADDRESS: C: , (cl i 0\ al 1 t J kJ A v 1 eA - Crry: (C• Li, pia"]_ PHONE: .. 466469,i c t� zIP: 9w037 CELL: CELL: � tO '5- zie:-7 x / . L . --y STATE: to 4 ZIP: 95 1 FAX: 62)5 416 Si 0 2 7 CELL: 419 i t Lj CONTRACTOR LICENSE No.: De „Its, 1 CGe1 13,K EXPIRES: !/ f f / CITY BUSINESS LICENSE NO.: DESCRIBE THE SCOPE Of WORK IN DETAIL AND INDICATE USE: Fog Foe) 71 ,ra s F', T- :SA i N 1 u J rr1 A ,v rz if" MANUFACTURED HOME WIDTH: i' MANUFACTURED HOME LENGTH: 5a2 YEAR OF MANUFACTURED HOME: 14 if t.4� PIT SET: CC®TYl' icctalcn. MANUFACTURER: V fk--NR.L E PREVIOUS ADDRESS: PROPOSED USE: DISCLAIMER The permitted verifl c, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership cf this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to he submitted and subsequently approved before this application can be processed. Signature Date: Method of payment: 0 Cash Bankcard #: Authori_ed Signature: Ci Check eck 0 Visa (*Mastercard NO EXP: � - l A - VIN#: This document originally contained confidential credit card Information which was redacted pursuant to RCW 19.255.010 and the original document destroyed pursuant to 505 DAN G52014-030. Project Number: 10000556 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: Date: 3/3/2010 Page 1 of 2 Permit Use: 2010 MARLETTE 30 X 52 Contact: GILICA, VICTOR F & PATRICIA A Address: 1823 S VERACREST C - S - Z: VERADALE, WA 99037 Setbacks: Front Left: Right: Rear: Phone: (509) 000-0000 Group Name: Site Information: Project Name: Plat Key: CONV Name: CONVERTED CNTY DATA District: East Parcel Number. 55074.0516 Block: SiteAddress: 17915 E INDIANA AVE Location:: CSV Lot: Owner: Name: GLLICA, VICTOR F & PATRICIA A Address: 1823 S VERACREST VERADALE, WA 99037 Zoning: R-3 SF Res District Water District: 134 CONSOLIDATED ID #19 Hold: ❑ Area: 14,000 Sq Ft Width: 100 Depth: 150 Right Of Way (ft): 0 Nbr of Bldgs: 1 Nbr of Dwellings: 1 Review Information: Review Landuse/Zoning/HE Conditions Released By: Sewer Review Permits: Originally Released: 3/2/2010 By: tschmidt Released By: Contractor: OWNER Item Description SETTING PERMIT Manufactured Home Firm: OWNER Phone: Units Unit Desc 2 # SECTIONS (000) 000-0000 Fee Amount $100.00 Permit Total Fees: $100.00 Operator: JD Printed By: JD Print Date: 3/3/2010 Project Number: 10000556 Inv: 1 Date: 3/3/2010 Page 2 of 2 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Notes: _ _ : Payment Summary: -- Permit Type Manufactured Home Fee Amount Invoice Amount $100.00 $100.00 Amount Paid Amount Owing $0.00 $100.00 $100.00 $100.00 $0.00 $100.00 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or Local laws or ordinances. Signature: Operator: JD Printed By: JD Print Date: 3/3/2010 Spokane jUalley For City Use Only PLUS Project Number Project Address 11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 • permitcenter@spokanevalley.org As part of our on -going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. > Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. > Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE -APPLICANT PINK - BUILDING FILE REV 9/07 Y L--- X Gvlew:TOP WCS:TOP Cplane:TOP 28 Ge C:IMCAMX2-MR21MCX1HALF ACRE3.MCX Mon Jan 11 06:03:46 2010 W � Uj U N WF_ ev � ,o cc Lu a �� V* P ANNING DEPT. APPROVED F— 19 3 ATE: / 20.8326 Inch McCullough Home Center inc 2300 w Broadway Moses Lake, Wa 98837 509-765-1888 fax 509`765-1889 wide 28 home utility locations " pull measure nents from upper left corner from end from side 1, water ' , power 3, drain 4, gas drain from round to be min of 8' from droof home > < $4" >< 76 > <5Q > ti V A 0 v w model* length* width* all centers must be filled with approved fill to top of concrete slab to be 6" thick min, steel size and placement according to local code slab should be B" longer than print length of home this drawing is an example drawn by McCullough Home Center inc,and may not meet local code in your area, please check your local code for specific requirements in your local area. "note, we do all tie down installation at time of set up" E0/E0 30tid 610 3WOH HSf1011f100W 688tS9L60S S0:Et 0t0Z/SZ/Z0