2010, 03-05 Permit App 10000572 GarageProject Number: 10000572 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Approach
Date: 3/5/2010 Page 2 of 2
Contractor: MEIDLING CONCRETE Firm: MEIDLING CONCRETE
Address: PO BOX 15198
SPOKANE WA 99215
Item Description
APPROACH-CONST IN ROW
Phone: (509) 924-7180
Units Unit Desc Fee Amount
1 NUMBER OF $52.00
Permit Total Fees: $52.00
Building Permit
Contractor: DENNIS CLARKE Firm: DENNIS CLARKE CONSTRUCTIO
Address: 1919 E MIDWAY RD
COLBERT, WA 99005
Phone: (509) 466-4621
This Application: Total Project:
Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation
GAR MASON U-1 VB 1,296 $28,512.00 1,296 $28,512.00
Item Description
RESIDENTIAL PERMIT FEE
ACCESSORY PLANS REVIEW
WSBCC SURCHARGE
Totals: 1,296 $28,512.00 1,296 $28,512.00
Units Unit Desc
1 SELECT
1 SELECT
1 SELECT
Fee Amount
$431.65
$107.91
$4.50
Permit Total Fees: $544.06
Notes: .. .w
Saw cutting of existing curb is not allowed within the City's jurisdiction. Driveway is to be inspected by
the City's ROW Inspector prior to concrete placement.
The driveway shall be hardpaved from the right-of-way up to the garage and must be a minimum of 17'
wide in order to satisfy the requirements for two off-street parking spaces.
Dennis Clarke, the contractor, was informed of this requirement by telephone on 3/4/10.
Payment Summary:
Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing
Approach $52.00 $52.00 $0.00 $52.00
Building Permit $544.06 $544.06 $107.91 $436.15
$596.06 $596.06 $107.91 $488.15
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: JD Printed By: jmm
Print Date: 3/5/2010
Project Number: 10000572 Inv: I
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 3/5/2010 Page 1 of 2
Project Information:
Permit Use: 24 X 54 GARAGE Contact: GILICA, VICTOR F & PATRICIA A
Address: 1823 S VERACREST
C - S - Z: VERADALE, WA 99037
Setbacks: Front Left: Right: Rear: Phone: (509) 000-0000
Group Name:
Project Name:
Site Information:
Plat Key: CONV Name: CONVERTED CNTY DATA District: East
Parcel Number: 55074.0516
Block: Lot:
SiteAddress: 17915 E INDIANA AVE Owner: Name: GILICA, VICTOR F & PATRICIA A
Address: 1823 S VERACREST
Location:: CSV VERADALE, WA 99037
Zoning: R-3 SF Res District
Water District: 134 CONSOLIDATED ID #19 Hold: ❑
Area: 14,000 Sq Ft Width: 100 Depth: 150 Right Of Way (ft): 0
Nbr of Bldgs: 1 Nbr of Dwellings: 1
Review Information•
Review
Building Plan Review
Released By:
Driveway/Approach
Originally Released: 3/4/2010 By: tmelbourn
Released By:
Originally Released: 3/5/2010 By: WMCGAV
Landuse/Zoning/HE Conditions
Permits:
Released By:
Approved with condition that driveway be hardpaved. Spoke with Dennis Clarke regarding requirment
3/4/10.
Originally Released: 3/4/2010 By: lbarlow
Operator: JD Printed By: jmm
Print Date: 3/5/2010
Spokane
_Valley
Community Development
Residential Construction
Permit Application
Permit Center
11703 E Sprague Ave, Suite B-3
Spokane Valley, WA 99206
(509)688-0036 FAX: (509)688-0037
www.spokanevalley.org
PERMIT NUMBER: t
PERMIT FEE:
New Construction
Addition/Remodel
Other:
Accessory Bldg
Deck
1L
SITE ADDRESS: 1 7 9/ 5 J
r) )/44) A
ASSESSORS PARCEL NO: LEGAL DESCRIPTION:
Building Owner:
Name:
01G i7, Z 4 (PA-7 a , Liep 4
Address:
1 „„. s vic2.ael.2P,,T
City: S Qv) k A .0(3 0a Heck Stag 4 Z1pglo 3r)
Phone: 0 Fax:
/ 4 T /.57.) 7_7. cf) Ca 2 6 '7
Contact Person
Name: VA,/ •u j S
Phone: i 4 -g 2
Describe the scope of work in detail:
Contractor:
Name:
'��1�lr.li 5
d��-►2�<� CVO
i
L,t. `C.—
Address:_
(Z.1`-rl9j'
City: .
�dL B2�-
State:
/.0 a
Zi pici,JOS
Phone:
Fax:
Contractor Lic No:
Exp Date:
City Business Lic. No:
Cost of Project: $ 3� ,
Proposed Use: aqv,6 / g<4(1 d, Of2-441 of S
**************The following MUST be complete: (write N/A if not applicable)**********************
HEIGHT TO PEAK:
DIMEN SI X S:
# OF STORIES:
TOTAL HABITABLE SPACE:
MAIN FLOOR TO SQ.
FTG:
2Nu FLOOR SQ. FTG:
UNFIN BASEMENT SQ. FTG:
IMPERVIOUS SURFACE
AREA:
FINISHED BASEMENT
SQ. FTG:
GARAGE SQ. FTG:
1 °� �j (o
DECK/COV. TIO SQ. FTG:
30% SLOPES ON
PROPERTY:
# OF BEDROOMS:
CONSTRUCTION TYPE:
HEAT SOURCE:
SEWER OR SEPTIC?
The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before
this application can be ppsed.
SIGNATURE:
Method of Payment:
❑ Cash
Bankcard #:
Authorized Signature:
REVISED 2/15/07
❑ Check
Mastercard
Expires:
DATE: 3 - / (-)
❑ VISA
VIN#:
RESIDENTIAL CHECK LIST DIRECTIONS:
Place a check mark in box next to each document required for complete submittal.
❑ SITE PLAN
o Property lines and dimensions
o Direction arrow pointing North and orientation to streets
o Proposed/existing buildings (footprint and dimensions)
o Utilities, septic tank/drain field locations and distances
o Setbacks to property lines
o Distance between buildings
o Right of way/easement location & sizes
o Driveway approach size and location
BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned)
O Elevations (Front/Rear/Sides) with roof peak and wall height including basement:
O Foundation Plan (crawlspace, basement or slab on grade):
o Footing sizes and locations
o Perimeter concrete foundation wall sizes
o Crawlspace ventilation
❑ Supporting wood cripple walls or beams
o Thickened concrete pads supporting
beams or girder trusses
O Floor Plan of each level (finished or unfinished) with dimensions:
o Floor Joist direction, size and spacing
o Header, beam or concrete lintel sizes
o Brace wall panel locations
o Water heater and furnace locations
o Exhaust fan locations
o Deck or concrete patio sizes and locations
❑ Roof Plan:
o Engineered truss direction and spacing
o Rafter and over frame direction, size and spacing
❑ Wall Section Detail including:
Roof
o Slope/ roofing material/ underlayment/ ice dam protection
o Sheathing size and type
Ceiling
o Joist size and spacing
Wall
o Height/ top plate/ stud size and spacing/ sole plate
o Exterior sheathing size and type
Floor
o Joist size and spacing
Foundation Wall
o Concrete or Masonry unit width
o Earth to wood separation distance
Footing
o Size
Radon
o Passive system with 6mi1 vapor barrier
Miscellaneous Construction Details
❑ Deck:
o Floor plan/ side view/ dimensions
o Floor Joist/ decking direction, size and spacing
O Stairway tread rise & run and nosing
o Window and door location and sizes
o Window well locations if applicable
o Room usage labels
o Smoke detector locations
o Attic and crawl space access locations
o Fire Wall construction
o Ridge, eave and valley lines
o Beam and girder size and location
o Truss or rafter size, spacing & connection
o Attic insulation/ air space baffle/ ventilation
o Size of ceiling gypsum wall board
o Siding/ exterior house wrap/ anchor bolts
o Insulation, vapor barrier, gypsum wall board
o Sheathing or concrete floor size/ insulation
o Footing bottom to finished ground level depth
o Horizontal & vertical reinforcement if any
o Reinforcement if any
o Active system with 6 mil vapor barrier
o Footings/ post/ and beam size and locations
O Handrail / Guard height & spacing
00
Spokane
jValley®
Pemnit Center
11703 E Sprague Ave, Suite B-3
Spokane Valley, WA 99206
(509)688-0036 FAX: (509)688-0037
www. spokanevall ey. ora
Community Development
Approach Permit Application
PROJECT ADDRESS ( ' %Gj i :, j:-_- d- tii O (h, tis A -
PERMIT NUMBER:
PERMIT FEE:
/0, 0 s -7 -z-�
START DATE - j'- j U ANTICIPATED COMPLETION DATE = 1-(0
PROJECT DESCRIPTION (Provide site sketch)
Residential Driveway
❑ Commercial/Industrial Driveway
Existing Curb & Gutter
Rural Road Section
Culvert Installation
F-1 Sidewalk Repair/Construction
F] Other Conditions
Bond/Insurance certification must be on file with the city.
DISCLAIMER
The permittee verifies, acknowledges and agrees by their signatures that: 1) If this permit is for construction of or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in
full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane
Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws,
codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this
application can be processed.
Signature n i /diY/Y/-lao j /lji4 Date 3 - S" /U
Method ofPayment.
❑ Cash ❑ Check] Mastercard ❑ VISA
Bankcard #: Expires: VIN#:
Authorized Signature:
RE SED 1
APPROACH PERMIT APPLICATION
REQUIRED SKETCH INFORMATION (Revised 1/25/10)
Provide required measurements (In sketch boxes), and include street name.
Check all existing conditions that apply:
❑ Sidewalk
ft wide
ft from back of curb
❑ Streetside Swale
❑ Drainage Ditch
❑ Drywell (show location on sketch)
O Other (please describe below)
w
z
0
DISTANCE FROM
NEAREST PROPERTY LINE
MBE LEFT OR RIGHT SIDE)
FT (SEE TABLE)
CONCRETE
APPROACH
rCURB
RETURN
CURB
w
n_
WING (SEE TAB
STREET NAME
4'—}--THROATWIDTHFT---4.4' �-
WING
STREET WITH CURB
DISTANCE FROM
NEAREST PROPERTY LINE
AY BE LEFT OR RIGHT SIDE)
S FT (SEE TABLE)
ASPHALT
APPROACH
`CIF CORNER LOT,
DISTANCE FROM
CURB RETURN
n FT (SEE TABLE)
15' RADIUS
RADIUS
RETURN
EDGE OF
ASPHALT
THROAT WIDTH 1 FT ---I
(SEE TABLE)
STREET NAME
. N O, A (-1
STREET WITH ASPHALT EDGE
NIF CORNER LOT,
DISTANCE FROM
RADIUS RETURN
Q FT (SEE TABLE)
Approach Requirements:
• Maximum 2 approaches per property frontage; one on arterials.
• Total width of approaches not to exceed 50% of frontage width.
Residential Approaches
Commercial Approaches
Distance from Curb/Radius Return
15' minimum
75' minimum
Separation between Approaches (measured
from centerline to centerline of each
approach)
None specified
See Page 7-27
In City Street Standards
Throat Width (flat portion)
16' min., 30' max.
30' min., 40' max.
Wing Width (at curb line)
4 feet typical
4 feet typical
Minimum Distance from Side Property Line
(@ r/w)
5.0'
5.0'
Minimum Distance from Crosswalk
5'
5'
C:IMCAMX2-MR21MCX1HALF ACRE3.MCX Mon Jan 11 06:03:46 2010
PLANNING DEPT. APPROVED
BY. L 0
DATE' 3(-1(io
X
Gvlew:TOP WCS:TOP Cplane:TOP
workshop
1
Gar ' e_
A
10
V
patio
NC
52
.541
0
18
30
r.
20.5325
Inch
cny. •g‘N,„
Spn
_.. Valley°
For City Use Only
PLUS Project Number
Project Address
a,�_,
11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206
509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org
As part of our on -going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
Your application review TARGET DATE is Il 1 L�
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
➢ Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
> Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven 't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure, you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE -APPLICANT PINK - BUILDING FILE
REV 9/07
Sp�1au�
jUalley
Development Engineering
11707 E Sprague Ave Suite 106 ♦ Spokane Valley WA 99206
509.921.1000 • Fax: 509.921.1008 ♦ cityhall®spokanevalley.org
Approach Permit Application Review
TO: Building Department
Site Address: 17915 E. Indiana
Project No: 10-0572
Accepted
Not Accepted
Approach
X
Building Location
Paved Access
Notes: Saw cutting of existing curb is not allowed within the City's
jurisdiction. Driveway is to be inspected by the City's ROW Inspector prior
to concrete placement.
Reviewed By: Date: