Loading...
2008, 06-03 Permit App 08002044 Egress WindowsProject Number: 08002044 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: Permit Use: EGRESS WINDOWS Setbacks: Front Site Information: Plat Key: 000405 Name: CLARKS HILLCREST HOMES Left: Right: Rear: Date: 6/3/2008 Page 1 of 2 Contact: MCVAY BROTHERS Address: 11420 E MONTGOMERY C - S - Z: SPOKANE VALLEY WA 99206 Phone: (509) 928-4686 Group Name: Project Name: District: Sout Parcel Number. 45214.1108 Block: SiteAddress: 11513 E 11TH AVE Location:: CSV Zoning: R-4 SF Res Urban District Water District: 007 MODEL Area: 11,600 Sq Ft Width: 0 Nbr of Bldgs: 1 Nbr of Dwellings: 10 Review Information: Lot: Owner: Name: MERCIER, AARON L & AMANDA Address: 11513 E 11TH AVE SPOKANE, WA 99206 Hold: ❑ Depth: 0 Right Of Way (ft): 0 Review Building Plan Review Permits: Released By: Contractor MCVAY BROS CONTRS INC Address: 11420 E MONTGOMERY SPOKANE VALLEY WA 99206 Building Permit Firm: MCVAY BROS CONTRS INC Phone: (509) 928-4686 This Application: Total Project: Description gm 'Ins Notes So Ft Valuation Sq Ft Valuation 1&2 FAMILY R-3 VB EGRESS 0 $4,272.00 0 $4,272.00 WINDOWS Totals: 0 $4,272.00 0 $4,272.00 Item Description Units Unit Desc Fee Amount RESIDENTIAL PERMIT FEE 1 SELECT $1 1 1.25 WSBC SURCHARGE 1 SELECT $4.50 SF PLNS RVW < 7999 SQ FT 1 SELECT $44.50 Permit Total Fees: $160.25 Operator: jmm Printed By: JD Print Date: 6/3/2008 Project Number: 08002044 Inv: 1 Notes: Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Payment Summary: Permit Type Building Permit Fee Amount $160.25 $160.25 Invoice Amount $160.25 $160.25 Date: 6/3/2008 Page 2 of 2 Amount Paid Amount Owing $0.00 $160.25 $0.00 $160.25 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: jmm Printed By: JD Print Date: 6/3/2008 Spokane .Valley Community Development Residential Construction Permit Application Permit Center 11703 E Sprague Ave, SuiteRECEIVED.BY Spokane Valley, WA 9 '61F SPOKANE VALLEY (509)688-0036 FAX: {509)688�QQ 7 www.spokanevalley.org �11!!''►► BY 3 o 2000 MIT CENTER SITE ADDRESS: 11513 ` 11-1/1 A v ASSESSORS PARCEL NO: `/5 ?' 1-7 0 I / 0 v PERMIT NUMBER: (i' Z OL1 PERMIT FEE: ction ❑ Accessory Bldg Addition/Remodel U Deck Other: LEGAL DESCRIPTION: Building Owner: Name: 4 I�V)%ted a �/f/J �� l -€, %. I" L'��/'Fh Address: `' 5/,. P 1!// City: 5 " State: t�� Zip: zo(.P Phone:9 3 _ 1 7 b Fax: Contact Person Name: 0 ('A A 7p fr io Yl / J Phone: 5-cc -- `f U rcf D cribe the scope of work in detail• leyc-1 :5 Proposed Use: Contractor: Name: L 14 Address f��' 1'l �/7 �� write,mt-e✓y /� State: DC cL Zip: 9926)6 City: ���%�C,��Q�2 /_ Phone- _ / 2 -u/ >6 Fax: 9 J 75-%O Copgactpr Lic,,NExp Date: City Busin�ss Lic. No: Cost too. of Project: T ,27Z Lys ° � egrot -1-1 :54 bit • (write N/A if not applicable)********************** .............- 1llC iVliVVVlLg HEIGHT TO PEAK: 1ravv. ,v.. .,.,...1..... DIMENSIONS: # OF STORIES: TOTAL HABITABLE SPACE: MAIN FLOOR TO SQ. FTG: 2Nu FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE AREA: FINISHED BASEMENT SQ. FTG: GARAGE SQ. FTG: DECK/COV. PATIO SQ. FTG: 30% SLOPES ON PROPERTY: # OF BEDROOMS: CONSTRUCTION TYPE: HEAT SOURCE: SEWER OR SEPTIC? The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or . dinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application ca e processed. SIGNATUR Method of P:jr ent: ❑ Cash Bankcard 1 0 Check ❑ Mastercard Expires: ❑ VISA VIN#: Authorized Signature: REVISED 2/15/07 StiOkane Valleyt 0 El 0 0 0 0 0 0 LJ 0 E Sprague Ave Suite B-3♦ Spokane Valley WA 99206 ♦509.688.0036 ♦ Fax: 509.688.0037 • Completed Building and Mechanical Application with: Accurate address, Parcel Number and/or Legal Description, description of work, owner and contractor information, signature and date. Three (3) sets of plans including Site Plan, elevations, floor plans, foundation plans with details, roof plan, framing plans and details. Show the height of any proposed buildings or accessory structures. Floor plan for each floor: Dimension to scale(minimum 1/8") and label each room (including sq footage of house and garage on plans) show each level of existing house and square footage of any additions. Egress windows: Provide at least one window or exterior door approved for emergency escape or rescue from basement and in every room for sleeping. Floor framing details: Joist type, size, spacing and installation details. Roof framing plan and details Furnace and hot water heater location All header locations: type, size and connections Foundation plan Insulation information Decks and Stairway details All braced wall panel types: show locations and details of installation, including engineered design Smoke detector locations 22" x 30" attic access location 18" x 24" crawl space access One -hour separation detail: between house and garage Spokane jUalley For City Use. my PLUS Project Number 1,, . u(4(1 Project Address /) („-/ - ` / "&- 11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206 509.688.0036 • Fax: 509.688.0037 • permitcenter@spokanevalley.org As part of our on -going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ). Ca11 staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE -APPLICANT PINK - BUILDING FILE REV 9/07 Stio"lane~ jUalley Site Address: 11513 E 11TH AVE Parcel Number: 45214.1108 Zoning: R-4 Fire District: FD 01 Project Transmittal City of Spokane Valley Community Development Department 11703 E. Sprague Ave, Suite B3 Spokane Valley, WA 99206 Phone: 509.688.0036 Water District: MODEL New project I-]. Previous pre-app meeting El Plan revisions El Transmittal Date: Friday, May 30, 2008 Project Number: 08002044 Applicant: e-mail: Contact: e-mail: Contractor: MCVAY BROTHERS 11420 E MONTGOMERY SPOKANE VALLEY WA 99206 (509) 928-4686 MCVAY BROTHERS 11420 E MONTGOMERY SPOKANE VALLEY WA 99206 (509) 928-4686 MCVAY BROS CONTRS INC 11420 E MONTGOMERY SPOKANE VALLEY WA 99206 (509) 928-4686 Owner: MERCIER, AARON L & AMANDA L 11513 E 11TH AVE SPOKANE, WA 99206 e-mail: Occupant: e-mail: Arch / Engineer: e-mail: D Project EGRESS WINDOWS Description: Building Landuse Engineer Utilities Health Fire Dist Assessor APPLICATIO N CONSTRUCTION PLAN TD Please send all plan review and project comments via e-mail to the highlighted individuals. PROJ #: 'C" &X DATE: 08/23/07 DRAWN: GFR APPROVED: TRW SCALE: 1 "=50' FIGURE NO. L=114' 201.5' 2 APPROVED BY GO" '055 P.CLcjoi�. 15' L=114t 30.5' 22.5' INDIANA AVENUE SITE PLAN PARCEL 55074.2803 INDIANA AVENUE AND LONG STREET CITY OF SPOKANE VALLEY WASHINGTON W N S E AWCE WHIPPLE CONSULTING ENGINEERS CIVIL AND TRANSPORTATION ENGINEERING 2528 NORTH SULLWAN ROAD SPOKANE VALLEY, WASHINGTON 99216 PH:509.893-2617 FAX: 509-926-0227 2006 IRC Ten Things You Must Know! 1. R105.2 "Work Exempt From Permit" — Spokane County will maintain the 200 sq/ft threshold for one-story detached accessory structures used as tool and storage sheds, or similar uses. 2. Table R301.5 "Live Loads" — Attic storage is clarified in the footnotes of this table. An example: If two or more adjacent trusses with the same web configuration contain a rectangle 42 inches or greater in height by 24 inchesorgreater in width, d located within the plane of the truss, a 20 psf v 1n d mu_�t L _� of e m chord co on affected. 3. R319.L5 "Exposed Glued -laminated Timbers" — Those portions of glu-lam timbers that form structural supporLof buildings/structures and are exposed to the weather, and not protected by a roof, cave, or similar covering shall be pressure treated, or naturally durable wood. 4. WAC AMENDMENT R327 "Protection Against Radwoln�"n S ate constron ucted in of IRC Appendix F for mitigation measures applicable for g "High Radon Potential Counties" (Spokane county). Appendix F, Section AF101.1 (WAC Amendment) no longer permits un-vented (conditioned) crawl spaces. Appendix F further requires passive radon vents to be installed in vented crawl spaces. WAC Amends R408.2, permitting 1:300 sq/ft ratios for ventilating crawl spaces. » _Lan e change removes "habitable or 5. R406.1 "Foundation Damp -proofing Language g usable spaces", and replaces with "foundation walls that retain earth and enclose interior spaces and floors below grade..." effectively req,iiring damp -proofing of crawl space foundation walls. R406.2 similar for water -proofing. 6. R613.2 "Window Sills" — New section requires protection similar to guardrails (4" dia. sphere) for operable portions of windows less than 24 inches above the finished floor, and greater than 72 inches above the adjacent exterior grade or surface below. 7. R702.4.2 Tile Backer Board — Requires cement, fiber -cement, or glass mat gypsum backers for tile installation in tub and shower areas and wall panels in shower areas. 8. R703.2 and Table R703.4 'Water -resistive Barrier" — Felt, or other approved barriers (house wrap) are now required over all exterior wall studs or sheathing, and there is no longer an exception for not requiring such felt/barriers under panel sidings with shiplap joints. 9. R703.8 "Flashing" — The provisions for self -flashing windows (use if the window's mounting flange) has been eliminated. Approved corrosion -resistive flashings must be applied shingle fashion at all door/window openings. R613.1 requires window manufacturers to provide installation/flashing instructions for each window. 10. Washington State Energy Code Section 505.3 "Outdoor Lighting" — I,,uminaries providing outdoor lighting and �� P� style basenEx tialbuildings be high efficiency (compact fluorescent) incandescent fixtures controlled by motion sensors with integral photo sensors. WSEC TABLE 6-2 PRESCRIPTIVE REQUIREMENTS°.1 FOR GROUP R OCCUPANCY CLIMATE ZONE 2 Option II. Glazing Area70: % of floor 10% 15% 17% IV. 25% Group R-1 Occupancy Only VI. Unlimited Group R-3 Occupancy Only Unlimited Group R-1 Occupancy Only Glazing U-Factor Vertical 0.40 0.40 0.37 0.35 0.35 0.32 Overhead" 0.58 0.58 0.58 0.58 0.58 0.58 Doc? U- Factor 0.20 0.20 0.20 0.20 0.20 0.20 Ceiling2 R-38 Vaulted Ceiling3 R-30 R-38 R-30 R-38 R-38 / U=0.031 R-38 R-38 / U=0.031 R-30 R-30 / U=0.034 R-30 R-30 / U=0.034 Wall'Z Above Grade R-21 int' R-19+ R-5° R-19+ R-5s R-21 int' / U=0.054 R-21 int' R-21 int' / U=0.054 Wall? int° Below Grade R-21 Wall? ext° Below Grade R-12 R-21 R-12 R-21 R-12 R-15 R-21 R-15 R-12 R-12 R-12 Floors R-30 R-30 R-30 R-30 / U=0.029 R-30 R-30 / U=0.029 Slabs on Grade R-10 R-10 R-10 R-10/ F=0.54 R-10 R-10/ F=0.54 * Reference Case 0. Nominal R-values are for wood frame assemblies only or assemblies built in accordance with Section 601.1. 1. Minimum requirements for each option listed. For example, if a proposed design has a glazing ratio to the conditioned floor area of 13%, it shall comply with all of the requirements of the 15% glazing option (or higher). Proposed designs which cannot meet the specific requirements of a listed option above may calculate compliance by Chapters 4 or 5 of this Code. 2. Requirement applies to all ceilings except single rafter or joist vaulted ceilings. 3. Requirement applicable only to single rafter or joist vaulted ceilings. 4. Below grade walls shall be insulated either on the exterior to a minimum level of R-10, or on the interior to the same level as walls above grade. Exterior insulation installed on below grade walls shall be a water resistant material, manufactured for its intended use, and installed according to the manufacturer's specifications. See Section 602.2. 5. Floors over crawl spaces or exposed to ambient air conditions. 6. Required slab perimeter insulation shall be a water resistant material, manufactured for its intended use, and installed according to manufacturer's specifications. See Section 602.4. 7. Int. denotes standard framing 16 inches on center with headers insulated with a minimum of R-5 insulation. WSEC Builder's Field Guide 5th Edition COOPERATIVE EXTENSION WASHINGTON STATh UNIVERSITY ENERGY PROGRAM 1-7 WALL CONSTRUCTION TABLE R602.10.6 MINIMUM WIDTHS AND TIE -DOWN FORCES OF ALTERNATE BRACED WALL PANELS SEISMIC DESIGN CATEGORY AND WINDSPEED TIE -DOWN FORCE (lb) 8ft. 2'-4" SDC A, B, and C Windspeed < 110 mph SDC Do, D1 and D2 Windspeed < 110 mph R602.10.6.1, Item 1 9 ft. 2'-8" 1800 1800 R602.10.6.1, Item 2 R602.10.6.1, Item 1 3000 2'-8" 1800 3000 2'-8" 1800 HEIGHT OF BRACED WALL PANEL Sheathed Width 10 ft. 2'-8" 1800 3000 Sheathed Width 2'-8" 1800 11 ft. 3'-2" 2000 3300 Note a 12 ft. 3'-6" 2200 3600 Note a R602.10.6.1, Item 2 3000 3000 3000 For SI: 1 inch = 25.4 mm, 1 foot = 304.8 min. a. Not permitted because maximum height is 10 feet. EXTENT OF HEADER DOUBLE PORTAL FRAME (TWO BRACED WALL PANELS) EXTENT OF HEADER SINGLE PORTAL FRAME (ONE BRACED WALL PANEL) MAX. HEIGHT 10' •I MIN. 3" X 11.25" NET HEADER 6' TO 18• FASTEN TOP PLATE TO HEADER WITH TWO ROWS OF 16D SINKER NAILS AT 3' O.C. TYP. 1000 LB STRAP OPPOSITE SHEATHING 1000 LB STRAP FASTEN SHEATHING TO HEADER WITH 8D COMMON OR GALVANIZED BOX NAILS IN 3' GRID PATTERN AS SHOWN AND 3' O.C. IN ALL FRAMING (STUDS, BLOCKING, AND SILLS) TYP. M1N. WIDTH = 16' FOR ONE STORY STRUCTURES MIN. WIDTH = 24' FOR USE IN THE FIRST OF TWO , STORY STRUCTURES • MIN. 2x4 FRAMING 3/8" MIN. THICKNESS WOOD • STRUCTURAL PANEL SHEATHING = MIN. 4200 LBT1E-DOWN DEVICE (EMBEDDED INTO CONCRETE AND NAILED INTO FRAMING) SEE SECTION R602.10.6.2 /d .o`NCI'a •5Jc.r Ti e-.I '-.' MIN. DOUBLE 2x4 POST 1 TYPICAL PORTAL FRAME CONSTRUCTION FOR A PANEL SPLICE (IF NEEDED), PANEL EDGES SHALL BE BLOCKED, AND OCCUR WITHIN 24' OF MID - HEIGHT. ONE ROW OF TYP. SHEATHING -TO - FRAMING NAILING IS REQUIRED. IF 2X4 BLOCKING IS USED, THE 2X4'S MUST BE NAILED TOGETHER WITH 3 16D SINKERS MIN. 1000 LB TIE DOWN DEVICE FIGURE R602.10.6.2 ALTERNATE BRACED WALL PANEL ADJACENT TO A DOOR OR WINDOW OPENING 2006 INTERNATIONAL RESIDENTIAL CODE® 140 SECTION R317 DWELLING UNIT SEPARATION R317.1 Two-family dwellings. Dwelling units in two-family dwellings shall be separated from each other by wall and/or floor assemblies having not less than a 1-hour fire -resistance rating when tested in accordance with ASTM E 119. Fire -resis- tance -rated floor -ceiling and wall assemblies shall extend to and be tight against the exterior wall, and wall assemblies shall extend to the underside of the roof sheathing. Exceptions: 1. A fire -resistance rating of '/2 hour shall be permitted in buildings equipped throughout with an automatic sprinkler system installed in accordance with NFPA 13 2. Wall assemblies need not extend through attic spaces when the ceiling is protected by not less than 5/8-inch (15.9 mm) Type X gypsum board and an attic draft stop constructed as specified in Section R502.12.1 is provided above and along the wall assembly separat- ing the dwellings. The structural framing supporting the ceiling shall also be protected by not less than 1/2 -inch (12.7 mm) gypsum board or equivalent. R317.1.1 Supporting construction. When floor assem- blies are . , required to be fire -resistance -rated by Section R317.1, the supporting construction of such assemblies shall have an equal or greater fire -resistive rating. R317.2 Townhouses. Each townhouse shall be considered a separate building and shall be separated by fire -resis- tance -rated wall assemblies meeting the requirements of Sec- tion R302 for exterior walls. Exception: A common 2-hour fire -resistance -rated wall is permitted for townhouses if such walls do not contain R502.12 Draftstopping required. When there is usable space both above and below the concealed space of a floor/ceiling assembly, draftstops shall be installed so that the area of the concealed space does not exceed 1,000 square feet (92.9 m2). Draftstopping shall divide the concealed space into- approxi- mately equal areas. Where the assembly is enclosed by a floor membrane above and a ceiling membrane below draftstopping shall be provided in floor/ceiling assemblies under the follow- ing circumstances: 1. Ceiling is suspended under the floor framing. 2. Floor framing is constructed of truss -type open -web or perforated members. R502.12.1 Materials. Draftstopping materials shall not be less than 1/7-inch (12.7 mm) gypsum board, 3/8-inch (9.5 mm) wood structural panels, 3/8-inch (9.5 mm) Type 2-M-W particleboard or other approved materials adequately sup- ported. Draftstopping shall be installed parallel to the floor framing members unless otherwise approved by the building official. The integrity of all draftstops shall be maintained. R502.13 Fireblocking required. Fireblocking shall be provided in accordance with Section R602.8. i WALLS AND INTERIOR PARTITIONS, WOOD -FRAMED GA FILE NO. WP 3370 GENERIC 1 GYPSUM WALLBOARD, WOOD STUDS One layer 5/a" type X gypsum wallboard or gypsum veneer base applied parallel or at right angles to each side of double row of 2 x 4 wood studs 16" o.c. on separate plates 1" apart with 6d coated nails, 1 7/e" long, 0.0915" shank, 1/a" heads, 7" o.c. Joints staggered 16" on opposite sides. Horizontal bracing required at mid -height. (LOAD - BEARING) GA FILE NO. WP 3380 GENERIC 1 HOUR FIRE 5 X X Thickness: Approx. Weight: Fire Test: Sound Test: 45 to 49 STC SOUND S 5 X X 9Y" 8 psf See WP 3605 (UL R1319-4, 6, 6-17-52; UL R2717-39, 1-20-66; UL R3501-52, 3-15-66, UL Design U305; ULC Design W301) Estimated GYPSUM WALLBOARD, WOOD STUDS One layer 5/13" type X gypsum wallboard or gypsum veneer base applied parallel or at right angles to each side of 2 x 4 wood studs 16" o.c. staggered 8" o.c. on 2 x 6 wood plates with 6d coated nails, 1 7/a" long, 0.0915" shank, 1/a" heads, 7" o.c. Joints staggered 24" on opposite sides. Horizontal bracing required at mid -height. (LOAD - BEARING) GA FILE NO. WP 3430 GENERIC 1 HOUR FIRE Thickness: Approx. Weight: Fire Test: Sound Test: I 40 to 44 STC SOUND X X 63/4" 8 psf See WP 3605 (UL R1319-4, 6, 6-17-52; UL R2717-39, 1-20-66; UL R3501-52, 3-15-66, UL Design U305; ULC Design W301) Estimated GYPSUM LATH, GYPSUM PLASTER, WOOD STUDS 1/2" 1:2 gypsum -sand plaster applied over 3/8" plain gypsum lath applied at right angles to each side of 2 x 4 wood studs 16" o.c. with 13 gage blued lath nails, 11/e" long, 0.0915" shank, 19/e4" heads, 4" o.c. (LOAD -BEARING) 1 HOUR FIRE Thickness: Approx. Weight: Fire Test: Sound Test: 53/e 15 psf OSU T-948, 7-17-58; OSU T-1380, 7-5-60 RAL TL58-60, 8-7-58 40 to 44 STC SOUND 55 GA-600-2003 Spokane YAlley' FOR INSPECTIONS CALL 509-688-0054 YOUR BUILDING INSPECTOR IS: EAST AREA PRESS 1 SOUTH AREA PRESS 2 NORTH AREA PRESS 3 THIS CARD MUST BE POSTED ON JOB SITE COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DIVISION INSPECTION RECORD 11703 E. Srague Ave, B-3 Job Address Spokane Valley, WA 99216 Inspection request line (509)688-0054 PERMIT NO: O7D3(1t4 ******** THIS CARD, PERMIT AND APPROVED PLANS SHALL BE ON JOB SITE AT ALL TIMES******* DATE INSPECTOR SETBACKS FOOTINGS REINFORCEMENT UNDERGROUND RADON FRAMING GAS PIPING DUCT WORK DATE INSPECTOR WATER PIPING DRAIN / WASTE / VENT INSULATION F IREWALL/GWB FIRE PROTECTION SYSTEM HVAC SYSTEM FINAL BUILDING FIRE