Loading...
2013, 05-07 Permit SW-13000606 SewerSPOKANE COUNTY UTILITIES PERMIT Application Number: SW-13000606 Permit Issued Date: 05/07/2013 Expiration Date: 05/07/2014 Project Description: Project Name: Primary Contact: Phone: SEWER CONNECTION S GREENACRES J L HAWKINS EXCAVATING 509-924-9025 Applicant: J L HAWKINS EXCAVATING Address: Phone: Email: 9722 E NORA AVE SPOKANE, WA 99206-0000 509-924-9025 SITE INFORMATION: Site Address: Parcel Number: Assessor's Description: Inspection Area: Zoning: 18202 E INDIANA AVE 55074.1148 Owner: Address: Phone: 07-25-45, GREENACRES IRR DIST A, THE W, 92 Email: FT OF THE N, 167 FT OF THE E, 350 FT OF TR 24, PLAT'A'. : (509)-477-3675 Water District: Consolidated Irrigation District #19 JONES, TRINA L 18202 E INDIANA AVE GREENACRES, WA 99016-8503 Fire District: Spokane Valley Fire Land Area: 15364 Square Feet CONTRACTOR INFORMATION: JLHAWE'222LE, Exp. 05/31/2014 J L HAWKINS EXCAVATING 9722 E NORA AVE SPOKANE, WA 99206-0000 509-924-9025 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION FEE DETAIL: Processing - Utilities Utilities Permit Total Fee: $26.32 $125.00 $151.32 1 $125.00 $125.00 $125.00 CONDITIONS: Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. Inside Public Transit Benefit Area CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30-MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. Date Printed: 05/07/2013 07:03:31 Project Coordinator: Kathy Cummings SPOKANE COUNTY UTILITIES PERMIT Application Number: SW-13000606 Permit Issued Date: 05/07/2013 Expiration Date: 05/07/2014 SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 05/07/2013 07:03:31 Project Coordinator: Kathy Cummings