2008, 08-07 Permit App 08003024 Residence, GarageProject Number: 08003024 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Project Information:
Date: 8/7/2008 Page 1 of 3
Permit Use: SFR W/ATT GAR Contact: CLIFF SCHMITZ CONSTRUCTION
Address: 16520 E SECRETARIAT
C - S - Z: VERADALE WA 99037
Setbacks: Front Left: Right: Rear: Phone: (509) 999-7733
Group Name:
Site Information: Project Name:
Plat Key: 003273 Name: Greenacres Valley Estates
District: East
Parcel Number: 55074.3804 Block:
SiteAddress: 18223 E INDIANA AVE
Location:: CSV
Lot:
Owner: Name: CLIFF SCIUVHTZ CONSTRUCTIO
Address: 16520 E SECRETARIAT
VERADALE WA 99037
Zoning: R-4 SF Res Urban District
Water District: Hold: 0
Area: 10,711 Sq Ft Width: 0 Depth: 0 Right Of Way (ft): 0
Nbr of Bldgs: 0 Nbr of Dwellings: 0
Review Information:
Review
Building Plan Review
Released By:
Driveway/Approach
Originally Released: 8/7/2008 By: tmelbourn
Released By:
NO ROW DRIVEWAY APPROACH PERMIT REQUIRED
Originally Released:
Landuse/Zoning/HF Conditions
8/7/2008 By: TMELBOU
Released By:
Originally Released:
Sewer Review
8/5/2008 By: tschmidt
Released By:
Operator: JD
Originally Released: 8/7/2008 By: JLMain
Printed By: jmm Print Date: 8/7/2008
Project Number: 08003024
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Permits:_
Inv: I
Contractor: CLIFF SCHMITZ
Address: 16520 E SECRETARIAT
VERADALE WA 99037
Building Characteristics
Building Height 23
Description
1&2 FAMILY
BASEMENT U
DECK OPEN
GARAGE
Building Permit
Grp Type Notes
R-3 VB
R-3 VB
R-3 VB
U-1 VB
Item Description
RESIDENTIAL PERMIT FEE
WSBC SURCHARGE
SF PLNS RVW < 7999 SQ FT
Contractor: C & K PLUMBING
Address: PO BOX 18620
SPOKANE WA 99228
Item Description
GAS WATER HEATER
GAS APPLIANCE<=100,000BTU
GAS PIPING
VENTILATING FANS
GAS LOG OR GAS INSERT
HOOD -TYPE II
Date: 8/7/2008 Page 2 of 3
Firm: CLIFF SCHMITZ CONSTRUCTIO
Phone: (509) 922-4297
This Application: Total Project:
Sq Ft Valuation Sq Ft Valuation
1,064 $101,069.36 1,064 $101,069.36
1,054 $15,810.00 1,054 $15,810.00
100 $1,500.00 100 $1,500.00
744 $14,136.00 744 $14,136.00
Totals: 2,962 $132,515.36 2,962 $132,515.36
Units Unit Desc
SELECT
SELECT
SELECT
Permit Total Fees:
Mechanical Permit
Fee Amount
$1,178.55
$4.50
$471.42
$1,654.47
Firm C & K PLUMBING
Phone: (509) 939-2377
Units Unit Desc
1 NUMBER OF
1 NUMBER OF
4 # OF UNITS
3 NUMBER OF
2 NUMBER OF
1 NUMBER OF
Operator: JD Printed By: jmm
Fee Amount
$10.00
$12.00
$4.00
$30.00
$20.00
$10.00
Permit Total Fees: $86.00
Print Date: 8/7/2008
Project Number: 08003024 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Contractor: C & K PLUMBING
Address: PO BOX 18620
SPOKANE WA 99228
Item Description
TOILETS/BIDETS
SINKS
TUBS
DISH WASHERS
GARBAGE DISPOSAL
CLOTHES WASHER
FLOOR DRAINS
MISCELLANEOUS FIXTURES
Plumbing Permit
Date: 8/7/2008
Page 3 of 3
Firm C & K PLUMBING
Phone: (509) 939-2377
Units Unit Desc
3 NUMBER OF
4 NUMBER OF
3 NUMBER OF
1 NUMBER OF
1 NUMBER OF
1 NUMBER OF
1 NUMBER OF
3 NUMBER OF
Permit Total Fees:
Fee Amount
$18.00
$24.00
$18.00
$6.00
$6.00
$6.00
$6.00
$18.00
$102.00
Notes: a-� ,_-_.
Parcel Nos. 55074.0612, 55074.0616, 55074.0618 & 55074.0619 all received rezone approval to UR-
7* and preliminary plat approval (File No. REZ-28-05/SUB-13-05). KEK
Payment Summary- ..,, ,.,..,
Permit Type
Building Permit
Mechanical Permit
Plumbing Permit
Fee Amount
$1,654.47
$86.00
$102.00
Invoice Amount
$1,654.47
$86.00
$102.00
Amount Paid
$0.00
$0.00
$0.00
Amount Owing
$1,654.47
$86.00
$102.00
$1,842.47 $1,842.47 $0.00 $1,842.47
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: JD Printed By: jmm
Print Date: 8/7/2008
�cn• a
�'Valley
Community Development
Permit Center
11707 E Sprague Ave, Suite 106
Spokane valley, WA 99206
(509)688-0036 FAX: (509)688-0037
www.snokanevalleY.or_.com
Residential Construction
Permit Application
PERMIT NUMBER:
PERMIT FEE:
ew Construction
❑ Addition/Renodei
o Other:
Accessory Bldg
❑ Deck
SITE ADDRESS _ (_ 7 _ £ . SA).0 /4-Am
ASSESSORS PARCEL NO: S5L) 7 7• 550 1 LEGAL DESCRIPTION: g ^'' &7
Building 'owner
Name:
Address:
City: Zip:
Phone: Fax:
Contact Person
Name:
Phone:
4q -7'233
Describe the scope of work in detail:
ittJ 2E51/00
Contractor
Name: CSC. I F F safry IrZ c2l3»S%` C-
1hsyy�,,te��,, 6 5e,e42€ A L1
City: �m/7Zip: of03'7
Address:
Phone:
Lic No:
7733 Fax: 92 a0
City Business Lic No:
Exp. Date:
Cost of Project: S)0 L: c ja
**************The following MUST be
j HEIGHT �PEAK: DIMENSIONS:�/
MA FLOOR TO SQ_ �/
FTG:
FINISHED BASEMENT
SQ. FTG: &
# OF BEDRQOMS:
complete: (write N/A, if not applicable)**********************
TOTAL HA TABLE SPACE:
# OF STORIES:
UNFIN BASEMENT SQ. FTG:
FLOOR SQ.
TG:
GARAGES . FTG 744
CONSTRUCTI TYPE:
V. PATIO SQ. FT
ov
FAT S••'CE:
IIVPERVIOUS SURFACE
AREA:
30% SLOPES ON
PROPERTY: (9—
SEWEROR SEPTIC?
DISCLAIMER
The permitee verifies. acknowledges and agrees by their signature that 1) •If this permit is for construction of or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3)
The
signatory is the property owner or has permission n to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This of Spo :ne Valley Permit is not a permit or approval for any violation of federal, state or
local laws. codes or ordinanc- 6 '1, o add'. al information may be required to be submitted, and subsequent) approved before
this application can .e
Signature
Method of Paymer i axed permit ap, 'cations will �)
Cash 7 Check u
Bankcard #:
Authorized Signature:
REV:SeC 8.252005
ate
V#:
Q Other
3Cas E'°.':;z ! _-'.n _ "O:c!"fEI'C2a Re.0 ! E:7 ii al .v
--
O'r U!ai_S TOTAL AUOUP'T-'t
S50 X,
_;SED ::v Cc A•. cc•S min_ -°L19 ti:::,`
_ ._ 13,;: =' `3n tpC ODD
:i
S t]0.J0
?C4 _.___..
5DDId —_�
1!
'_-
---c==F^--=R� t01:
GC - ^'.�^,iJ3 .• _r�
$25.D'1 =
_
>�� `_� ___^:\•_1.'114
t.J �'SNIA. ai-U
i.Aor� 1.:e, 3� 70W-
—'
:ia^ -CvIJ 3TU
'i
i5O:J5 =
_
-
_
s.'.'�hJ -
_. _.._.
_
i I
c�`
c'J-�L=.TION M.__Et✓C
-_..__
--
-
X
'_—
.
Ati;
- \=!I; :L 4Tt'iX A9eL:-. -y_ _. CST
t
_
I i r.
JI
FUEL BURNN-_
71-7
✓'s
_-_.al r. iss, than i
-4C-c la_; %y ;�.
sr i^.ar 7 DADD CRd
=� _.
.--.._•.,
DD -
I
70"t
TON
qD^
In :^NDi 10'4En
i.Aor� 1.:e, 3� 70W-
—'
•.
St0.0D _
_cG STORAGE -C h
_. _.._.
_
i I
c�`
c'J-�L=.TION M.__Et✓C
-_..__
--
-
X
'_—
.
Ati;
- \=!I; :L 4Tt'iX A9eL:-. -y_ _. CST
t
_
I i r.
71-7
7 V, A-qH'=-P.
C ir
. Ns.
—L�MSNIG.
Oz WCG-K
S
x
COST
TCTALAMOINT
-IDETS
SWAM;'
F--
3Zf' ,F� VATS,
-.C. ANKS,
X 1
I'S
STAL.L O.NISr,` BUF T
u -'S,SLS; 4S. SAn. RW(DR KI7CHFN.
;k I
Is DO
IN Apy
ssmos
7 V, A-qH'=-P.
. Ns.
—L�MSNIG.
WLAKER, HOSE
-- -----
SWAM;'
F--
3Zf' ,F� VATS,
-.C. ANKS,
7�VK
LAN
4r
IF PAYMF-N�:
' -T.-;2R
'
' -
CID
-6 pD
S� F �7
-11E�Mlu FEE Du=-�
Spokane
Va11ey
For City Us()CLnly`��
PLUS Project Number } _
Project Address `.
11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206
509.688.0036 • Fax: 509.688.0037 • permitcenter@spokanevalley.org
As part of our on -going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
Your application review TARGET DATE is A \ 1-- '~
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
i Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure, you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE -APPLICANT PINK - BUILDING FILE
REV 9/07
1O,7i1T SF
18223 E.
INDIANA
AVE.
0 to za
r: 1 1
PLANNING DEPT„ APPROVED
BY• 1
DATE: 'l5/08