Loading...
2008, 08-07 Permit App 08003024 Residence, GarageProject Number: 08003024 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: Date: 8/7/2008 Page 1 of 3 Permit Use: SFR W/ATT GAR Contact: CLIFF SCHMITZ CONSTRUCTION Address: 16520 E SECRETARIAT C - S - Z: VERADALE WA 99037 Setbacks: Front Left: Right: Rear: Phone: (509) 999-7733 Group Name: Site Information: Project Name: Plat Key: 003273 Name: Greenacres Valley Estates District: East Parcel Number: 55074.3804 Block: SiteAddress: 18223 E INDIANA AVE Location:: CSV Lot: Owner: Name: CLIFF SCIUVHTZ CONSTRUCTIO Address: 16520 E SECRETARIAT VERADALE WA 99037 Zoning: R-4 SF Res Urban District Water District: Hold: 0 Area: 10,711 Sq Ft Width: 0 Depth: 0 Right Of Way (ft): 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review Information: Review Building Plan Review Released By: Driveway/Approach Originally Released: 8/7/2008 By: tmelbourn Released By: NO ROW DRIVEWAY APPROACH PERMIT REQUIRED Originally Released: Landuse/Zoning/HF Conditions 8/7/2008 By: TMELBOU Released By: Originally Released: Sewer Review 8/5/2008 By: tschmidt Released By: Operator: JD Originally Released: 8/7/2008 By: JLMain Printed By: jmm Print Date: 8/7/2008 Project Number: 08003024 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Permits:_ Inv: I Contractor: CLIFF SCHMITZ Address: 16520 E SECRETARIAT VERADALE WA 99037 Building Characteristics Building Height 23 Description 1&2 FAMILY BASEMENT U DECK OPEN GARAGE Building Permit Grp Type Notes R-3 VB R-3 VB R-3 VB U-1 VB Item Description RESIDENTIAL PERMIT FEE WSBC SURCHARGE SF PLNS RVW < 7999 SQ FT Contractor: C & K PLUMBING Address: PO BOX 18620 SPOKANE WA 99228 Item Description GAS WATER HEATER GAS APPLIANCE<=100,000BTU GAS PIPING VENTILATING FANS GAS LOG OR GAS INSERT HOOD -TYPE II Date: 8/7/2008 Page 2 of 3 Firm: CLIFF SCHMITZ CONSTRUCTIO Phone: (509) 922-4297 This Application: Total Project: Sq Ft Valuation Sq Ft Valuation 1,064 $101,069.36 1,064 $101,069.36 1,054 $15,810.00 1,054 $15,810.00 100 $1,500.00 100 $1,500.00 744 $14,136.00 744 $14,136.00 Totals: 2,962 $132,515.36 2,962 $132,515.36 Units Unit Desc SELECT SELECT SELECT Permit Total Fees: Mechanical Permit Fee Amount $1,178.55 $4.50 $471.42 $1,654.47 Firm C & K PLUMBING Phone: (509) 939-2377 Units Unit Desc 1 NUMBER OF 1 NUMBER OF 4 # OF UNITS 3 NUMBER OF 2 NUMBER OF 1 NUMBER OF Operator: JD Printed By: jmm Fee Amount $10.00 $12.00 $4.00 $30.00 $20.00 $10.00 Permit Total Fees: $86.00 Print Date: 8/7/2008 Project Number: 08003024 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Contractor: C & K PLUMBING Address: PO BOX 18620 SPOKANE WA 99228 Item Description TOILETS/BIDETS SINKS TUBS DISH WASHERS GARBAGE DISPOSAL CLOTHES WASHER FLOOR DRAINS MISCELLANEOUS FIXTURES Plumbing Permit Date: 8/7/2008 Page 3 of 3 Firm C & K PLUMBING Phone: (509) 939-2377 Units Unit Desc 3 NUMBER OF 4 NUMBER OF 3 NUMBER OF 1 NUMBER OF 1 NUMBER OF 1 NUMBER OF 1 NUMBER OF 3 NUMBER OF Permit Total Fees: Fee Amount $18.00 $24.00 $18.00 $6.00 $6.00 $6.00 $6.00 $18.00 $102.00 Notes: a-� ,_-_. Parcel Nos. 55074.0612, 55074.0616, 55074.0618 & 55074.0619 all received rezone approval to UR- 7* and preliminary plat approval (File No. REZ-28-05/SUB-13-05). KEK Payment Summary- ..,, ,.,.., Permit Type Building Permit Mechanical Permit Plumbing Permit Fee Amount $1,654.47 $86.00 $102.00 Invoice Amount $1,654.47 $86.00 $102.00 Amount Paid $0.00 $0.00 $0.00 Amount Owing $1,654.47 $86.00 $102.00 $1,842.47 $1,842.47 $0.00 $1,842.47 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: jmm Print Date: 8/7/2008 �cn• a �'Valley Community Development Permit Center 11707 E Sprague Ave, Suite 106 Spokane valley, WA 99206 (509)688-0036 FAX: (509)688-0037 www.snokanevalleY.or_.com Residential Construction Permit Application PERMIT NUMBER: PERMIT FEE: ew Construction ❑ Addition/Renodei o Other: Accessory Bldg ❑ Deck SITE ADDRESS _ (_ 7 _ £ . SA).0 /4-Am ASSESSORS PARCEL NO: S5L) 7 7• 550 1 LEGAL DESCRIPTION: g ^'' &7 Building 'owner Name: Address: City: Zip: Phone: Fax: Contact Person Name: Phone: 4q -7'233 Describe the scope of work in detail: ittJ 2E51/00 Contractor Name: CSC. I F F safry IrZ c2l3»S%` C- 1hsyy�,,te��,, 6 5e,e42€ A L1 City: �m/7Zip: of03'7 Address: Phone: Lic No: 7733 Fax: 92 a0 City Business Lic No: Exp. Date: Cost of Project: S)0 L: c ja **************The following MUST be j HEIGHT �PEAK: DIMENSIONS:�/ MA FLOOR TO SQ_ �/ FTG: FINISHED BASEMENT SQ. FTG: & # OF BEDRQOMS: complete: (write N/A, if not applicable)********************** TOTAL HA TABLE SPACE: # OF STORIES: UNFIN BASEMENT SQ. FTG: FLOOR SQ. TG: GARAGES . FTG 744 CONSTRUCTI TYPE: V. PATIO SQ. FT ov FAT S••'CE: IIVPERVIOUS SURFACE AREA: 30% SLOPES ON PROPERTY: (9— SEWEROR SEPTIC? DISCLAIMER The permitee verifies. acknowledges and agrees by their signature that 1) •If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission n to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This of Spo :ne Valley Permit is not a permit or approval for any violation of federal, state or local laws. codes or ordinanc- 6 '1, o add'. al information may be required to be submitted, and subsequent) approved before this application can .e Signature Method of Paymer i axed permit ap, 'cations will �) Cash 7 Check u Bankcard #: Authorized Signature: REV:SeC 8.252005 ate V#: Q Other 3Cas E'°.':;z ! _-'.n _ "O:c!"fEI'C2a Re.0 ! E:7 ii al .v -- O'r U!ai_S TOTAL AUOUP'T-'t S50 X, _;SED ::v Cc A•. cc•S min_ -°L19 ti:::,` _ ._ 13,;: =' `3n tpC ODD :i S t]0.J0 ?C4 _.___.. 5DDId —_� 1! '_- ---c==F^--=R� t01: GC - ^'.�^,iJ3 .• _r� $25.D'1 = _ >�� `_� ___^:\•_1.'114 t.J �'SNIA. ai-U i.Aor� 1.:e, 3� 70W- —' :ia^ -CvIJ 3TU 'i i5O:J5 = _ - _ s.'.'�hJ - _. _.._. _ i I c�` c'J-�L=.TION M.__Et✓C -_..__ -- - X '_— . Ati; - \=!I; :L 4Tt'iX A9eL:-. -y_ _. CST t _ I i r. JI FUEL BURNN-_ 71-7 ✓'s _-_.al r. iss, than i -4C-c la_; %y ;�. sr i^.ar 7 DADD CRd =� _. .--.._•., DD - I 70"t TON qD^ In :^NDi 10'4En i.Aor� 1.:e, 3� 70W- —' •. St0.0D _ _cG STORAGE -C h _. _.._. _ i I c�` c'J-�L=.TION M.__Et✓C -_..__ -- - X '_— . Ati; - \=!I; :L 4Tt'iX A9eL:-. -y_ _. CST t _ I i r. 71-7 7 V, A-qH'=-P. C ir . Ns. —L�MSNIG. Oz WCG-K S x COST TCTALAMOINT -IDETS SWAM;' F-- 3Zf' ,F� VATS, -.C. ANKS, X 1 I'S STAL.L O.NISr,` BUF T u -'S,SLS; 4S. SAn. RW(DR KI7CHFN. ;k I Is DO IN Apy ssmos 7 V, A-qH'=-P. . Ns. —L�MSNIG. WLAKER, HOSE -- ----- SWAM;' F-- 3Zf' ,F� VATS, -.C. ANKS, 7�VK LAN 4r IF PAYMF-N�: ' -T.-;2R ' ' - CID -6 pD S� F �7 -11E�Mlu FEE Du=-� Spokane Va11ey For City Us()CLnly`�� PLUS Project Number } _ Project Address `. 11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206 509.688.0036 • Fax: 509.688.0037 • permitcenter@spokanevalley.org As part of our on -going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is A \ 1-- '~ The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. i Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE -APPLICANT PINK - BUILDING FILE REV 9/07 1O,7i1T SF 18223 E. INDIANA AVE. 0 to za r: 1 1 PLANNING DEPT„ APPROVED BY• 1 DATE: 'l5/08