Loading...
2007, 10-24 Permit App 07004251 Finish BasementProject Number: 07004251 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: Permit Use: FINISH BASEMENT -FIR OUT WALLS, 2X4, Contact: CONNER CORP DRYWALLS Address: 802 N STEVENSON CT C - S - Z: LIBERTY LAKE WA 99019 Setbacks: Front Left: Right: Rear: Phone: (509) 290-0200 Group Name: Site Information: Project Name: Plat Key: 005824 Name: RIVERWALK 06TH ADD PUD District: East Date: 10/24/2007 Page 1 of 2 Parcel Number: 55083.2001 Block: Lot: SiteAddress: 19216 E INDIANA AVE Location:: CSV Owner: Name: BRILEY SR, ERVIN R & ELIZABE Address: 19216 E INDIANA AVE SPOKANE VALLEY, WA 99016 Zoning: UR-7 Urban Residential-7 Water District: 134 CONSOLIDATED ID #19 Hold: Area: 8,063 Sq Ft Width: 70 Depth: 125 Right Of Way (ft): 60 Nbr of Bldgs: 1 Nbr of Dwellings: 1 Review Information: Review Plan Review Permits: Released By Originally Released: 10/23/2007 By: tmelbourn Contractor: CONNER CORPORATION Address: 802 N STEVENSON CT LIBERTY LAKE WA 99019 Building Permit Firm: CONNER CORPORATION Phone: (509) 290-0220 This Application: Total Project: Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation BASEMENT U R-3 VB FINISH 0 $6,000.00 0 $6,000.00 BASEMENT Item Description RESIDENTIAL PERMIT FEE WSBC SURCHARGE SF PLNS RVW < 7999 SQ FT Totals: 0 $6,000.00 0 $6,000.00 Units Unit Desc 1 SELECT 1 SELECT 1 SELECT Fee Amount $125.25 $4.50 $50.10 Permit Total Fees: $179.85 Operator: jmm Printed By: JD Print Date: 10/24/2007 Project Number: 07004251 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit OK TO ISSUE SEWER PERMITS PER GENE REPP 6/3/97 CKF ALL PERMIT APPLICATIONS IN MISSION MEADOWS MEP MUST HAVE PLANNING DIVISION REVIEW BY MICKI HARNOIS OR GREG MCCORRMICK Permit Type Building Permit Fee Amount Invoice Amount $179.85 $179.85 Amount Paid $0.00 Amount Owing $179.85 $179.85 $179.85 $0.00 $179.85 Date: 10/24/2007 Page 2 of 2 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: jmm Printed By: JD Print Date: 10/24/2007 Spokane Valley; Community Development Residential Construction Permit Application Permit Center 11703 E Sprague Ave, Suite B-3 Spokane Valley, WA 99206 (509)688-0036 FAX: (509)688-0037 www. spokanevalley.org PERMIT NUMBER: 257 PERMIT FEE: New Construction Accessory Bldg n Addition/Remodel n Deck i I Other: _ SITE ADDRESS: 1 / &/ 1' «';;+K` �� � :� !/ '%t"7 /C ASSESSORS PARCEL NO: LEGAL DESCRIPTION: Building Owner: Owwner: Name%/, Cam- �<-75'f r'4 Address,Q.lf�. /� oo f /"1 City: f44�zt State:+so Zips! Phone4,9g Fax: Contact Person Name: d/, 0,7/7C✓ Phone: Contractor: Name: C f74 r4 ( c1,„,..,c _ Address. ve 4/ jr � E�• City / /4,'"r' :P!'�`� tateez e'C• , �,tr `' Phone 2 co/� Fa ? r� to ..f`�f 1,4 c 9,400 Date:at ....o9......d City Business Lic. No: Describe the scope of work in detail: Cost of Project: $ icke. 1:7/A /C7b° 40404 e.-,-./4";`, -2 Yg/f/ Proposed Use: **************The following MUST be complete: (write N/A if not applicable)********************** HEIGHT TO PEAK: A' • DI ENSIGNS: y 'R -_ # OF STORIES: / TOTAL HABITABLE SPACE: MAIN FLOOR TO SQ. FTG: /OP& 2Nu FLOOR SQ. FTG: 4> UNFIN BASEMENT SQ. FTG: ' ' %©ems IMPERVIOUS SURFACE AREA: FINISHED BASEMENT SQ. FTG: s�GP� GARAG FTG: DECK/COV. T SQ. FTG: / 30% SLOPES ON P : • - RTY: /rA # OF BEDROOMS: j CONSTRUCTION TYPE: HE,$T,,SOURCE:dinD OR SEPTIC? The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application can be processed, - SIGNATURE: Method of Payments. ❑ Cash Bankcard #: ❑ Check ❑ Mastercard Expires: DATE: ❑ VISA VIN#: Authorized Signature: REVISED 2/15/07 Spokane Valley® 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 ♦ cityhall@spokanevaUey.org Residential Plan Submittal Minimums ❑ Completed Building & Mechanical application with: Accurate address, Parcel Number and/or Legal Description, description of work, owner and contractor information, signature, and date. ❑ Two sets of plans including Site Plan, elevations, floor plans, foundation plans With details, roof plan, framing plans & details. ❑ Show the height of any proposed buildings or accessory structures. ❑ Floor plan for each floor: Dimension to scale (minimum 1/8") and label each Room (including sq. footage of house and garage on plans) Show each level of existing house and square footage of any additions. ❑ All braced wall panel types: show locations and details of installation, including engineered design. ❑ Egress windows: Provide at least one window or exterior door approved for Emergency escape or rescue from a basement and in every room for sleeping. ❑ Smoke detector locations ❑ 22" X 30" attic access location ❑ 18" X 24" crawl space access: ❑ One -hour separation detail: between house and garage ❑ Floor framing details: Joist type, size, spacing and installation details ❑ Roof framing plan and details ❑ Furnace and hot water heater location. ❑ All header locations: type, size, and connections ❑ Foundation plan ❑ Insulation information Spokane 'Valley® For City Use Only PLUS Project Number -LJZ.g Project Address / 9 09/ (o 11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter®spokanevalley.org As part of our on -going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is 1O13o The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven 't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE -APPLICANT PINK - BUILDING FILE REV 9/07 ITMJMMAIUOM MAW Y'ii30143143 IIMOOliailteilla MO( OM*139014A ►zttMkf (•NI SAM► a1Aiiirn e{ +f :: 11 4a WSEC TABLE 6-2 frittoy�SCRIPTIVE;REQUIREMENTS°4 FOR GROUP R OCCUPANCY T1 0i314ire ".70 CLIMATE ZONE 2 4-0_,Ane319 WWI ,. it Alli Option 10 3tDab 3l11 GIOT Area1°: of floor M0ii"+ s',,.'a,t: ;• if: AOQ g U;Facb r Door9 U- Factor Ceiling2 Vaultedaz2�1 Ce ling Wall' Above Grade Wall? Below Grade Wall? Below Grade Floors Slabs Grade Vertical Overhead" L ' 10%0, :. -A.40, ;. ;;.,; ,Q.58 0.20 R-38 R-30 R-21 R-21 R-12 R-30 R-10 II. . ' 15% ':. • .i' 0.40.' 1' 15., • '0 58 ,1r 0.20 R-38 R-30 R-19+ R-21 R-12 R-30 R-10 III. ar i ''J"f 17% :"� ' rMt1A. C1 :!'.F7 0.37 A, 1.1.:4;y';°' 0t4A Cl:0 0.58 0.20 R-38 R-30 R-19+ R-56 R-21 R-12 R-30 R-10 iiV. 4'ti ! :..;,, .: J.. '1 N . ' OA 25P/d, T 1 ' Group 11 Occupancy. . , Only .' Viz. ekr A%0:35,�i � .1..1. 1 W i,, 2 r,E G�':r r M O C•, i Ci 'it li4 i" i:` 0 58 I r .: -� :"i ! 1 ::i '..v.: 0.20 R-38 / U=0.031 R-30 / U=0.034 R-21 Intl I U=0.054 R-15 R-12 R-30 / U=0.029 R-10 / F=0.54 V. Unlimited Group R-3 Occupancy C.. 0.35 0.58 0.20 R-38 R-30 R-21 int' R-21 R-12 R-30 R-10 VI. Ited A Group Rr1 '' Acctipancy Only '! .4.32_ : , E., • : ;: : N r,0.58 4 11;.. ° ,_ 0.20 R-38 / U=0.031 R-30 / U=0.034 R-21 int' / U=0.054 R-15 R-12 R-30 / U=0.029 R-10 / F=0.54 * Reference Case 0. Nominal R-values are for wood frame assemblies only or assemblies built in accordance with Section 601.1. 1. Minimum requirements for each option listed. For example, if a proposed design has a glazing ratio to the conditioned floor area of 13%, it shall comply with all of the requirements of the 15% glazing option (or higher). Proposed designs which cannot meet the specific requirements of a listed option above may calculate compliance by Chapters 4 or 5 of this Code. 2. Requirement applies to all ceilings except single rafter or joist vaulted ceilings. 3. Requirement applicable only to single rafter or joist vaulted ceilings. 4. Below grade walls shall be insulated either on the exterior to a minimum level of R-10, or on the interior to the same level as walls above grade. Exterior insulation installed on below grade walls shall be a water resistant material, manufactured for its intended use, and installed according to the manufacturer's specifications. See Section 602.2. 5. Floors over crawl spaces or exposed to ambient air conditions. 6. Required slab perimeter insulation shall be a water resistant material, manufactured for its intended use, and installed according to manufacturer's specifications. See Section 602.4. 7. Int. denotes standard framing 16 inches on center with headers insulated with a minimum of R-5 insulation. WSEC Builder's Field Guide 5th Edition COOPERATIVE EXTENSION WASHINGTON STATE UNIVERSITY ENERGY PROGRAM 1-7 EMERGENCY EGRESS INMEINNMINTS FROM S'MAOOMS 1) NET CLEAR OPENING: S. MUMS NET GRADE FLOOR OPENING GM44') 5.0 SOUR* FEET 21 NET CLEAR OPENING HEIGHT 24INCHES 3) NET CLEAR OPENING MOTH 20 INCHES 4) MAX FINISHED SILL HEIQKT 44' ABOVE FLOOR 51 EMERGENCY ESCAPE & RESCHE OPENING SHALL* OPE RATIONAL FROM THE IIMSIO1 Or THE ROOMYMTNOUT THE 1ISE ;I KEYS OR TOOLS WHEN INTERIOR ALTERATIONS, REPAIRS OR ADDITIONS REQUIRING A PERMIT OCCUR. OR WHEN ONE OR MORE SLEEPING ROOMS ARE ADDED OR CREATED IN EXISTING DWELLINGS, THE DWELLING UNIT SHALL BE PROVIDED WITH SMOKE ALARMS LOCATED AS REQUIRED FOR NEW DWELLINGS. SMOKE ALARMS SHALL SE INTERCON- NECTED AND HARD WIRED IN SUCH A MANNER THAT THE ACTIVATION OF ONE ALARM WILL ACTIVATE ALL ALARMS. (BEDROOMS, AREAS APPROACHING B,EDROCMS-, VAULTED CEILING WITH RISE OF 24' & ON EACH FLOOR) N-WSST'FAT S 1° 0i .. M kit h 50-CP 'bat s & iaunidy c:V//fi-7/C •."..if C.* ,tkj€3 i;.;;HT . -11-1 • • • • • • -•-• --,(••••v • 8cci--,g Ry'y/8 wit 13eCZ PROVIDE DIAGRAMS AND ENGINEERING LAYOUTS FOR ROOF TRUSSES, BEAMS AND FLOOR SYSTEMS PRIOR TO FRAMING INSPECTIONS CITY COPY THIS BUILDING SUBJECT TO FIELD INSPECTION CORRECTIONS REVIEWED FOP CODE COMPLIANCE SPOKANE VALLEY BUILDING IVISION —TrsA_ t o z 3 .�o