2008, 06-06 Permit App 08002119 ShopProject, Number: 08002119 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Project Information:
Permit Use: BUILD SHOP 30 X 36
Setbacks: Front
Site Information:
Plat Key: 001868 Name: ORCHARD AVE ADD TR 1-228 District: Nort
Left: Right: Rear:
Date: 6/6/2008 Page 1 of 2
Parcel Number: 45072.6302 Block:
SiteAddress: 8207 E JACKSON AVE
Location:: CSV
310111111111111111
Contact: MOORE, MILTON C & REBECCA L
Address: 8207 E JACKSON AVE
C - S - Z: SPOKANE VALLEY, WA 99212
Phone: (509) 928-9136
Group Name:
Project Name:
Lot:
Owner: Name: MOORE, MILTON C & REBECCA
Address: 8207 E JACKSON AVE
SPOKANE VALLEY, WA 99212
Zoning: R-2 SF Res Suburban District
Water District: 002 ORCHARD AVENUE Hold: ❑
Area: 12,190 Sq Ft Width: 75 Depth: 132 Right Of Way (ft): 34
Nbr of Bldgs: 1 Nbr of Dwellings: 1
Review Information:
Review
Building Plan Review
Released By:
Originally Released: 6/5/2008 By: tmelbourn
Landuse/Zoning/HE Conditions
Permits:
Released By:
Originally Released: 6/5/2008 By: mpalaniuk
Operator: jmm Printed By: jmm Print Date: 6/6/2008
Proj ect.Number: 08002119 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Contractor: OWNER
Description Grp Type Notes
GARAGE U-1 VB
Item Description
RESIDENTIAL PERMIT FEE
ACCESSORY PLANS REVIEW
WSBC SURCHARGE
Notes: y ;.."±. ;„; m..:
Payment Summary: .;m ,;411041
Permit Type
Building Permit
Date: 6/6/2008 Page 2 of 2
Building Permit
Firm: OWNER
Phone: (000) 000-0000
This Application: Total Project:
Sq Ft Valuation Sq Ft Valuation
1,080 $20,520.00 1,080 $20,520.00
Totals: 1,080 $20,520.00 1,080 $20,520.00
Units Unit Desc
1
1
1
SELECT
SELECT
SELECT
Permit Total Fees:
Fee Amount Invoice Amount
$423.56 $423.56
$423.56 $423.56
Fee Amount
$335.25
$83.81
$4.50
$423.56
Amount Paid
$0.00
Amount Owing
$423.56
$0.00 $423.56
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: jmm Printed By: jmm Print Date: 6/6/2008
Spokane
._ Valley
Community Development
Residential Construction
Permit Application
Permit Center
11703 E Sprague Ave, Suite B-3 RECEIVED
Spokane Valley, WA 99206 CITY OF SPOf(ANE BY
(509)688-0036 FAX: (509)688-0037
www.spokanevallev.org
JUN 0 5 2008
onstruction
rtion/Remodel:
ther:
PERMIT NUMBER:(] ,,1 / J j
PERMIT FEE:
a Accessory Bldg
Deck
SITE ADDRESS: O a 0 % -5-c-kC kSc, j1
ASSESSORS PARCEL NO: LEGAL DESCRIPTION:
Building Owner:
Name: I' l'i `+ I ( k r
Address' .C7)2 r � ck c v
City: 5p0k1jY\Q V ckli State: (��
t
Zip:
Phone: cl 2c3,_ 9/ G" Fax:
Contact Person
Name:
Phone:
Describe the scope of work in detail:
Contractor:
Name: F4- Se r vk c' 5
Address: / I a-7 (.' Vc, T v►e,,J
City: Spo a re State: ltJc�
Zip: 7' 9i cts
Phone: Fax:
sal- 3a7--3s-6y
Contractor Lic No: Exp Date:
City Business Lic. No:
Cost of Project: $ / 5; v�
)A Cx (3‘, ship
Proposed Use:
96.ra1/4-te / Wnrk Sh
********************************
The followin MUST be complete• (write N/A if not applicable)
HEIGHT TO PEAK:
is
g
DIMENSIONS:
20 x 3 G
# OF STORIES:
/
TOTAL HABITABLE SPACE:
MAIN FLOOR TO SQ.
FTG:
I a '-do
2"D FLOOR SQ. FTG:
N/\
UNFIN BASEMENT SQ. FTG:
AV A
IMPERVIOUS SURFACE
AREA:
FINISHED BASEMENT
SQ. FTG:
RAGE SQ. FTG:
o A
DECK/COV. PATIO SQ. FTG:
30% SLOPES ON
PROPERTY:
# OF BEDROOMS:
CONSTRUCTION TYPE:
HEAT SOURCE:
SEWER OR SEPTIC?
The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before
this application can be processed.
SIGNATURE:
Method of Payment:
❑ Cash
Bankcard #:
❑ Check
DATE:
❑ Mastercard ❑ VISA
Expires: VIN#:
Authorized Signature:
REVISED 2/15/07
QCITY0111/1\111k
kane 11703E Sprague Ave Suite B-3♦ Spokane Valley WA 99206
•♦ 509.688.0036 •♦Fax: 509.688.0037 •
0
❑x
❑x
Valleyg
Completed Building and Mechanical Application with: Accurate address, Parcel
Number and/or Legal Description, description of work, owner and contractor
information, signature and date.
Three (3) sets of plans including Site Plan, elevations, floor plans, foundation plans
with details, roof plan, framing plans and details.
Show the height of any proposed buildings or accessory structures.
Floor plan for each floor: Dimension to scale(minimum 1/8") and label each room
(including sq footage of house and garage on plans) show each level of existing
house and square footage of any additions.
Egress windows: Provide at least one window or exterior door approved for
emergency escape or rescue from basement and in every room for sleeping.
Floor framing details: Joist type, size, spacing and installation details.
Roof framing plan and details
Furnace and hot water heater location
All header locations: type, size and connections
Foundation plan
Insulation information
Decks and Stairway details
All braced wall panel types: show locations and details of installation, including
engineered design
Smoke detector locations
22" x 30" attic access location
18" x 24" crawl space access
One -hour separation detail: between house and garage
SpOF
okane
jValley®
For City Ust.5pnly
PLUS Project Number i I cl
Project Address �] '' (` �`
11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206
509.688.0036 • Fax: 509.688.0037 • permitcenter@spokanevalley.org
As part of our on -going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
➢ Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
> Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
> Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure, you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE -APPLICANT PINK - BUILDING FILE REV 9/07
!Y;1 I lnore,
991 - 9i3c-
PLANNING DEPT. APPROVED
DATE Cls/zoa
3
J
i
Lor fotert;Jz,190 It
F
°t-c S r\.
Spokane0•"~
jUalle
Project
Transmittal
City of Spokane Valley
Community Development
Department
11703 E. Sprague Ave, Suite B3
Spokane Valley, WA 99206
Phone: 509.688.0036
Site Address: 8207 E JACKSON AVE
Parcel Number: 45072.6302
Zoning: R-2
Fire District: FD 01
New project
Previous pre-app meeting
Plan revisions
Transmittal Date:
Thursday, June 05, 2008
Project Number: 08002119
Water District: ORCHARD AVENUE
Applicant:
e-mail:
Contact:
e-mail:
MOORE, MILTON C & REBECCA L
8207 E JACKSON AVE
SPOKANE VALLEY, WA 99212
(509) 928-9136
MOORE, MILTON C & REBECCA L
8207 E JACKSON AVE
SPOKANE VALLEY, WA 99212
(509) 928-9136
Contractor: OWNER
() - 0
Owner: MOORE, MILTON C & REBECCA L
8207 E JACKSON AVE
SPOKANE VALLEY, WA 99212
e-mail:
Occupant:
e-mail:
Arch / Engineer:
e-mail:
D�D
ECIE0WE fl,
5 0 JUN
c
Project BUILD SHOP 30 X 36
Building
Landuse
Engineer
Utilities
Health
Fire Dist
Assessor
APPLICATION
y
1
CONSTRUCTION PLANS
SITE PLAN
TDS
\
1
Please send all plan review and project comments via e-mail to the
highlighted individuals.