Loading...
2008, 05-30 Permit App 08001781 DeckProject Number: 08001781 Inv: 1 Application Date: 5/19/2008 Page 1 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Proiect Information: Permit Use: NEW 650 SF DECK Contact: SMITH, GARY/PENNY Address: 14315 E EVERETT AVE C - S - Z: SPOKANE, WA 99216-1497 Setbacks: Front Left: Right: Rear: Phone: (509) 926-1860 Group Name: Site Information: Project Name: Plat Key: CONV Name: CONVERTED CNTY DATA District: East Parcel Number: 46353.2305 Block: SiteAddress: 5412 N BEST RD Location:: CSV Zoning: R-3 SF Res District Water District: 001 TRENTWOOD Area: 16,530 Sq Ft Width: 110 Nbr of Bldgs: 1 Nbr of Dwellings: I Review Information: Review Building Plan Review Originally Released: Septic Sys Review Originally Released: Landuse/Zoning/HE Conditions Originally Released: Permits: Lot: Owner: Name: SMITH, GARY/PENNY Address: 14315 E EVERETT AVE SPOKANE, WA 99216-1497 Hold: ❑ Depth: 150 Right Of Way (ft): 0 Released By: _ 5/14/2008 By: tmelbourn 1 5/14/2008 By: LHALSEY Released By: 5/16/2008 By: tschmidt Operator: jmm Printed By: JD Print Date: 5/19/2008 Project Number: 08001781 Inv: 1 Application Date: 5/19/2008 Page 2 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Description Gro Type Notes DECK OPEN R-3 VB Item Description RESIDENTIAL PERMIT FEE WSBCSURCHARGE SF PLNS RV W < 7999 SQ FT Pavment Summa Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $258.25 $258.25 $0.00 $258.25 $258.25 $258.25 $0.00 $258.25 Disclaimer. Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: jmm Printed By: JD Print Date: 5/19/2008 Building Permit Firm: OWNER Phone: (000)000-0000 This Application: Total Project: So Ft Valuation Scl Ft Valuation 650 $9,750.00 650 $9,750.00 Totals: 650 $9,750.00 650 $9,750.00 Units Unit Desc Fee Amount 1 SELECT $181.25 1 SELECT $4.50 1 SELECT $72.50 Permit Total Fees: $258.25 Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $258.25 $258.25 $0.00 $258.25 $258.25 $258.25 $0.00 $258.25 Disclaimer. Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: jmm Printed By: JD Print Date: 5/19/2008 Spokane~ jValley° Community Development Permit CenterNED 13' 11703 E Sprague Ave, S I CKANE VALLEY PERMIT NUMBER: Spokane Valley, WACO PERMIT FEE: (509)688-0036 FAX: (509)t*V0172 2008 www Sl) anevallev.om LATER Residential Construction Permit Application ERMIT CE - 3Y ew Construction ❑ Accessory Bldg ❑ Addition/Remodel Deck Other: SITE ADDRESS: S LI I oL fJ c R P cT Ra. n ASSESSORS PARCEL NO: L16353,.230!5' J(} LEGAL DESCRIPTION: SL1V Ac2PC 2tin A -AJ i— S PL(c I Building Owner: Contractor: Name:AR Name: Se 1-r "f" eNN Address:E. e2 Address: City: State: Wok Zip: City: State: Zip: okAN pmh Phone: _ 9 2 iT— 18 (' 0 Fax' 36 _ 1& b 0 Phone: Fax: Contractor Lic No: Exp Date: Contact Person City Business Lic. No: Name: Phone: SOqIr.- q3q -56914 - Describe the scope of work in detail: Cost of Project: $ 5 - 6) Cots, p� -Ttiy- ►t..t_ gpKa- D •Ic nV FYLrs-noon Cjsme..r; Pftrlo- ' ADD t o ,Po- 1)eci-- bes,be. IN� A Proposed Use: **************Tha fnllnwinu IMTCT he eamnlete! (write N/A if not annlicablel********************** HEIGHT TO PEAK: DIMENSIONS: # OF STORIES: TOTAL HABITABLE SPACE: z R 4 00 MAIN FLOOR TO SQ. 2 FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVI S SURFACE FTG: AREA: FINISHED BASEMENT GARAGE SQ. FTG: DEC�QCOV. PATIO SQ. FTG: 30% SLOPES ON SQ. FTG: f) `` 0 0 K PROPERTY: # OF BEDROOMS: CONSTRUCTION TYPE: SEWER OR SEPTIC? Se Tic The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application canprocessed. SIGNATURE: �dE ' DATE: 51t -10 �. Method of Payment J V ❑ Cash ❑ Check ❑ Mastercard ❑ VISA Bankcard #: Expires: VIN#: Authorized Signature: REVISED 211&07 00 Spne6U ,,;oOValley° For City Use Only PLUS Project Number 6 / -7 Project Address .i1// Z 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is I The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for aooroval or hermit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE—APPLICANT PINK—BUILDING FILE REV 9107 5rre.. AcSARess 8esf PJ 1 c-ec� - W4,353. 23oS 33 DID\u u)A/ 4-PcDDIRf-r A-Setite rG orlt ST�e � 1 ipc5 PLANNING DEPT. APPROVEL BY:. DATE: 9/1q6146 (5.5 " I E Eveae Ave.