2008, 07-21 Permit App 08002791 GarageProject Number: 08002791 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Project Information:
Permit Use: 18 X 23 GARAGE
Setbacks: Front
Site Information:
Plat Key: 001866 Name: ORCHARD AVE ADD TR 1-228
Contact: L & M ENTERPRISES
Address: 20814 W MCFARLANE RD
C - S - Z: MEDICAL LAKE, WA 99022
Left: Right: Rear: Phone: (509) 299-4144
Group Name -
Project Name:
Date: 7/21/2008 Page 1 of 2
District: Nort
Parcel Number: 45072.6202 Block: 196 Lot:
SiteAddress: 8119 E JACKSON AVE
Location:: CSV
Owner: Name: PIKE, ROBERT
Address: 8203 E JACKSON AVE
SPOKANE VALLEY, WA 99212-225
Zoning- R-2 SF Res Suburban District
Water District:002 ORCHARD AVENUE Hold:
Area: 11,090 Sq Ft Width: 75 Depth: 150 Right Of Way (ft): 34
Nbr of Bldgs: 1 Nbr of Dwellings: 0
Review Information:
Review
Building Ilan Review
Released By:
Originally Released: 7/21/2008 By: tmelbourn
Landuse/Zoning/HE Conditions
Permits:
Released By:
Originally Released: 7/18/2008 By: cjjanssen
Operator: jmm Printed By: jmm
Print Date: 7/21/2008
Project Number: 08002791 Inv: I
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Contractor: L & M ENTERPRISES
Address: 20814 W MCFARLANE RD
MEDICAL LAKE, WA 99022
Description
GARAGE
Grp Type Notes
U-1 VB
Item Description
RESIDENTIAL PERMIT FEE
ACCESSORY PLANS REVIEW
WSBC SURCHARGE
Notes:
Payment Summary:
Permit Type
Building Permit
Building Permit
Date: 7/21/2008
Page 2 of 2
Firm: L & M ENTERPRISES
Phone: (509)299-4144
This Application: Total Project:
Su Ft Valuation Su Ft Valuation
414 $7,866.00 414 $7,866.00
Totals: 414 $7,866.00 414 $7,866.00
Units Unit Desc
1 SELECT
1 SELECT
1 SELECT
Permit Total Fees:
Fee Amount Invoice Amount
$196.06 $196.06
Fee Amount
$153.25
$38.31
$4.50
Amount Paid
$0.00
$196.06
$196.06
$196.06 $0.00
Amount Owing
$196.06
$196.06
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: jmm Printed By: jmm
Print Date: 7/21/2008
Spokane
jValley3'
Community Development
Residential Construction
Permit Application
Permit Center
11703 E Sprague Ave, Suite B-3
Spokane Valley, WA 99206 ✓p-�VEg
-r�'CANEVALLEY
(509)688-0036 FAX:(509)688=0037
www. sp okaneval l ey. org
13 2006
Ffill New Construction
Addition/Remodel
Other:
PERMIT NUMBER: 579
PERMIT FEE:
Accessory Bldg
Deck
SITE ADDRESS: `iI I 1 C\ c-e- 5 �+
ASSESSORS PARCEL NO: LEGAL DESCRIPTION:
Building Owner:
Name: ; k ,�
Address: 53l' r C 3,K 5 cy\_
City: 56 K<„�Z iJ �.l (r� State: .� Zip:�
2_,/
2_
Phone: 9 2.:_) ' Lit T a Fax:
Contact Person
Name: Al
Phone: 50 nj 9 9 CST 7 7
Describe the scope of work in detail:
Contractor:
Name: L 4,11,1 k - - ,,-,e. p f,_Sc 5
-cA ,
Address: 81 t 4,7 Ai frvf. I e..„..4._
12z4.
City c_d .,cam' L 1< State: at_Zip: 9,- c, s
Phone: < <•. Fax: G.
sal Z? i° yiYy �oei 2 i 41r�;
Contractor Lic No: Exp Date:
/ M EXfr ME 1 s5 e rz
/ - 247 • i t.
City Business Lic. No:
Cost of Project: $
/8)c2
Proposed Use: I%zi K
**************The followin MUST be complete: (write N/A if not applicable)**********************
HEIGHT TO PEAK:
DIMENSIONS:
# OF STORIES:
TOTAL HABITABLE SPACE:
MAIN FLOOR TO SQ.
FTG:
2 FLOOR SQ. FTG:
UNFIN BASEMENT SQ. FTG:
-
IMPERVIOUS SURFACE
AREA:
FINISHED BASEMENT
SQ. FTG:
GARAGE SQ. ,.F./TC._.—
'1/ 1 r
DECK/COV. PATIO SQ. FTG:
30% SLOPES ON
PROPERTY:
# OF BEDROOMS:
CONSTRUCTION TYPE:
G7.r ,AK. F ( a, .e
HEAT�SOURCE:
/ I // 4-
SEWER OR SEPTIC?
The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before
this application can be processed.
SIGNATURE:"�� "'ems- DATE:
Method of Payment:
El Cash
Bankcard #:
❑ Check
Authorized Signature l'
REVISED 2/15/07
❑ Mastercard
Expires:
VISA
IN#:
Spokane s 11703 E Sprague Ave Suite 6-30 Spokane Valley WA 99206
♦509.688.0036 ♦ Fax: 509.688.0037 •
Valley®
Completed Building and Mechanical Application with: Accurate address, Parcel
Number and/or Legal Description, description of work, owner and contractor
information, signature and date.
Three (3) sets of plans including Site Plan, elevations, floor plans, foundation plans
with details, roof plan, framing plans and details.
Show the height of any proposed buildings or accessory structures.
Floor plan for each floor: Dimension to scale(minimum 1/8") and label each room
(including sq footage of house and garage on plans) show each level of existing
house and square footage of any additions.
Egress windows: Provide at least one window or exterior door approved for
emergency escape or rescue from basement and in every room for sleeping.
Floor framing details: Joist type, size, spacing and installation details.
Roof framing plan and details
Furnace and hot water heater location
All header locations: type, size and connections
Foundation plan
Insulation information
Decks and Stairway details
All braced wall panel types: show locations and details of installation, including
engineered design
Smoke detector locations
22" x 30" attic access location
18" x 24" crawl space access
One -hour separation detail: between house and garage
/5-r F-Ir
1/to 05
ke.,411„:112'
old) i
Piro c.,E•0", c_ T6 P 1),1
74&., oc? 6
Lef.‘,-t-'-•
, vd_
140,- r e-vt
co
iv\ 0 e-rt-
(3415e-
2 P. e LA v/
1-rqeS
R
6Th
A
!€:-1 I irkPi
2
.k \ ice? c> -cs"
s —1
ipci&
an�
spbk
jUalley
Project
Transmittal
City of Spokane Valley
Community Development
Department
11703 E. Sprague Ave, Suite B3
Spokane Valley, WA 99206
Phone: 509.688.0036
New project
Previous pre-app meeting
Plan revisions
Transmittal Date:
Friday, July 18, 2008
Site Address: 8119 E JACKSON AVE Project Number: 08002791
Parcel Number: 45072.6202
Zoning: R-2 Water District: ORCHARD AVENUE
Fire District: FD 01
Applicant: L & M ENTERPRISES
20814 W MCFARLANE RD
MEDICAL LAKE, WA 99022
(509) 299-4144
e-mail:
Contact: L & M ENTERPRISES
20814 W MCFARLANE RD
MEDICAL LAKE, WA 99022
(509) 299-4144
e-mail:
Contractor: L & M ENTERPRISES
20814 W MCFARLANE RD
MEDICAL LAKE, WA 99022
(509) 299-4144
Owner: PIKE, ROBERT
8203 E JACKSON AVE
SPOKANE VALLEY. WA 99212-225
e-mail:
Occupant:
e-mail:
Arch / Engineer:
e-mail:
Project Description: 18 X 23 GARAGE
Building
Landuse
Engineer
Utilities
Health
Fire Dist
Assessor
APPLICATION
CONSTRUCTION PLANS
1
SITE PLANS
1
-
TDE
y
1
Please send all plan review and project comments via e-mail to the
highlighted individuals.
Spokane
jUalley°
For City Use Only
PLUS Project Number t'
Project Address (f -J b,i✓u_.
11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206
509.688.0036 ♦ Fax: 509.688.0037 • permitcenter®spokanevalley.org
As part of our on -going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
➢ Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
> Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
> Ca11 staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure, you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE -APPLICANT PINK - BUILDING FILE
REV 9/07
w
N
0
•
o
WAMBEKE ENGINEERING 2913 East 61st Court
Daniel Wambeke, P. E. Spokane, WA 99223
Telephone: 509-443-6186 • Fax: 509-448-6582 • dwambeke @msn.com
STRUCTURAL DESIGN DRAWINGS
FOR
18' X 23' X 8' STUD FRAME BUILDING
FOR
BOB PIKE
8119 E. JACKSON
SPOKANE VALLEY, WASHINGTON 99212
PREPARED FOR
L & M ENTERPRISES
MEDICAL LAKE, WASHINGTON
July 14, 2008
IEXPIRES a 1 t4
Designer of Small Structures, Post Frame Buildings, Foundations.
Light Gauge Steel Framing and Grain Storage Systems
PROTECTION AND OPEN -NGS BETWEEN
DWELLING AND PRIVATE GARAGE SHALL HAVE:
1) MATERIALS APPROVED FOR ONE HOUR FIRE RESISTIVE
CONSTRUCTION ON THE GARAGE SIDE:
0 5/8" TYPE X' GYP BOARD (HABITABLE SPACE ABOVE) OR
0 1/2" GYP BOARD ,RFSIDF NCE/ATTIC, FLOOR/CEILING)
2) OPENINGS BETWEEN GARAGF AND RESIDENCE SHALL BE
EQUIPPED WITH SOLID WOOD DOOR, SOLID OR HONEYCOMB CC
STEEL DOORS NOT LESS THAN 1 34', OR 20 MINUTE FIRE RLT€
DOORS.
�bdXL�GAL1CA
r►:
bolx gjw&A is
` (p✓T(did NKS l�tf
sl,J& - FjA d 1F"
EXPIRES (L'L4-c.Y
�r2e 1Rt�=�
znr2 D�=•Ltt�
(10
412? hewlit
-----
]- •
• i? .L•tT e
de-vot 49-44
---- •
/
-/zia- 2 (4 ‘`-'4- e'145
po,kNo.."... • TCP (-71 IeLt-,•;.- 1-d/
L3 iec c
ei-,e:te 5 l.LP)
Cc pqi.)
i< 14.5 ' ht
r
gia-11' \
IEXPIRES ez' I 7 --c". I
18'-0" T❑ 40'-0" SPANS
18'-0' TO 96'-0' BUILDING LENGTH
a
o
Zip
Zo
cJ
6'-0" TO 30'
l
l 1
6'-0' MAX,
6'-0' MAX.
/
1 TO 14 BAYS @ 6'-0' O.C. MAX.
4' X 6" HEM -FIR #2
TREATED TIMBE
/
/
i
I I
I I
I I
I I
---t--1---
I I
I I
#4 BARS @ 24' ❑.C.,
DR FIBERMESH
4" THICK FLOOR
FLOOR ❑PTIONAL
6'-0' MAX.
CONCRETE PIER - SEE
TYPICAL SIDEWALLS & ENDWALLS
/
ler-caC=: PLAN VIEW
1 DESIGN IS BASED ON THE REQUIREMENTS OF THE 2006 INTERNATI❑NAL BUILDING CODE
A• LLOWABLE Pc
BEARING PRESSURE IS 2,000 PSF PER IBC TABLE 1804.2.
2, CONCRETE F c = 2,500 PSI @ 28 DAYS. MAX. SLUMP 4"; MIN SLUMP 2'.
3 IN LIEU OF PIERS, TIMBERS MAY BE PLACED DIRECTLY ON EXISTING CONCRETE
S• LAB BY B❑LTING TIMBER TO SLAB WITH CONCRETE EXPANSI❑N ANCHORS @ 4'-0' ❑, C.
4. FOR AREAS WITH PARTIAL EXISTING SLABS, NEW SLAB AND TIMBER BEAMS MAY BE
P• INNED TO EXISTING CONCRETE W/ 1/2'0 CONCRETE EXPANSI❑N ANCHORS
48' ❑, C. @ SLAB EDGE.
BUILDING SPAN
4" MINIMUM CONCRETE FLOOR
" COMPACT SAND OR S❑IL BASE
4" X 6' HEM -FIR #2
TREATED TIMBE
00
PB44R SIMPS❑N POST BASE
FORM WITH S❑N❑TUBE
16', 20'
OR 24'
DIAMETER
SECTION B—B
TYPICAL PIER DETAIL
16', 20'
OR 24'
DIAMETER
4" X 6' HEM -FIR #2
TREATED TIMBER BEAM
PB44R SIMPS❑N POST BASE
NOTE! WHEN SIDEWALL ❑PENINGS UP TO 16'-0" WIDE ARE
INSTALLED, USE "BIGF❑❑T" PIER BASES 24' DIAMETER
@ EDGE OF ❑PENING TO SUPPORT DOOR JAMBS.
SECTION C—C
TYPICAL PIER DETAIL
PIER SIZES
SPAN
LIVE LOAD
PIER .DIAMETER
LIVE LOAD
40 PSF
PIER DIAMETER
18'
20'
30 PSF
16'
24'
30 PSF
16'
40 PSF
18'
26'
30 PSF
18'
40 PSF
20'
28'
30 PSF
18'
40 PSF
20'
30'
30 PSF
18'
40 PSF
20'
32'
30 PSF
20'
40 PSF
24'
36'
30 PSF
20'
40 PSF
24'
40'
30 PSF
24'
40 PSF
24'
fEXPIRES r 1-af61
WAMBEKE ENGINEERING
Daniel Warlbeke, P. E. 2Spokane, WAst99223t
Telt 509-443-6186 Fax! 509-448-6582 a -Mail dwambekeensn.com
FOUNDATION DESIGN FOR PACKAGE STUD FRAME BUILDINGS
USING TREATED TIMBER BASE & CONCRETE PIERS
30 PSF & 40 PSF ROOF SNOW LOAD
L & M ENTERPRISES
20814 WEST McFARLANE ROAD
MEDICAL LAKE, WASHINGTON 99022
SEE SCHEDULE
DRAWN
BY
DATE
DRAWING NO.1 L & M.FDN.IBC2006
WAMBEKE
7-28-07
SCALEI N.T.S.
SHEETI 1 OF 1
REV,
PROVIDE DIAGRAMS AND
ENGINEERING LAYOUTS FOR
ROOF TRUSSES, BEAMS AND
FLOOR SYSTEMS PRIOR TO FRAMING
INSPECTIONS
CITY COPY
THIS BUILDING SUBJECT
TO FIELD INSPEGTjON CORRECTIONS
.0,00IsYTaieJ
REVIEWED FOR COE COMPLIANCE
SPOKANE VALLEY IL G DIVISION