Loading...
2010, 02-22 Permit 1000449 Furnace, Wtr HtrPERMIT CENTER 11703 E. Sprague Avenue, Suite B-3 Spokane Valley, WA 99206 Site Information Project Information Site Address: 9505 E BROADWAY AVE Parcel Number: 45172.1417 Subdivision: Block: Zoning: R-3 Lot: SF Res District Owner: WRENCHER, JEANNE Address: 1607 S BLAKE RD SPOKANE VALLEY, WA 99216-0412 Building Inspector: NORTH Water Dist: MODERN Project Number: 10000449 Inv: 1 Issue Date: 02/22/2010 Permit Use: 1 FURNACE, 1 GAS WATER HEATER Applicant: SPOKANE COMFORT SYSTEMS 620 N FREYA ST SPOKANE, WA 99202 Phone: (509) 536-2925 Contact: SPOKANE COMFORT SYSTEMS 620 N FREYA SPOKANE WA 99202 Phone: (509) 536-2925 Setbacks - Front: Left: Right: Group Name: Project Name: Rear: Permits Mechanical Permit i Contractor: SPOKANE COMFORT SYSTEMS INC License #: SPOKACS981 KA GAS WATER HEATER 1 $11.00 GAS APPLIANCE=100,000BT 1 $13.00 PROCESSING FEE $37.00 FOR MECHANICAL INSPECTIONS CALL (509) 688-0054. Payment Summary Total Permit Fee: $61.00 Total Fees AmountPaid AmountOwing $61.00 $61.00 $0.00 Processed By: KENDALL, KAREN Printed By: MORRIS, HEATHER Tran Date 02/22/2010 Page 1 of 1 Receipt # Payment Amt 21822 $61.00 PERMIT NOTICE The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the applicant/permittee that the use described on the front of th s permit complies with applicable codes and that required inspections are requested. Failure to request inspections a . listed below and obtain the necessary approvals before progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the applicant's/permittee's or property owner's expense. At a minimum, the following inspections ARE REQUIRED by City Code: FOOTING — when forms and reinforcement are in place and prior to placement of concrete -all structures, including manufactured homes. NOTE: This inspection includes review of the structure's setback from property lines. Minimum setbacks are established by City of Spokane Valley Ordinance. Curb lines and fence lines are not necessarily indicat 'io of property lines. The responsibility to comply with applicable setback provisions lies solely with the permittee-neither the City of Spok,rne Valley nor its authorized representatives assume any responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the oweer'sfpermittee's expense. FOUNDATION — when forms and reinforcement are in place and arior lc placement of concrete. PLUMBING — after rough -in, before covering, and final. MECHANICAL — rough -in of piping, before covering, metal chimneys before concealment, and final. FRAMING — after all framing, bracing and blocking is in place, rough eIe orical, plumbing and mechanical systems are complete, and prior to concealing. FINAL — when complete and prior to occupancy and/or use. All permits require final inspection. NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants, fire department access, on -site drainage (208' swales), road improvements, parking and landscaping are common requirements of a permit/site plan which must be completed prior to final approval of a building or issuance of a Certificate of Occupancy. MANUFACTURED HOMES — Final inspection required when complete, stairs, handrails, skirting, etc. installed, and prior to occupancy; completed inspection record card must be available on site. PLUMBING REVERSALS FOR SEWER CONNECTIONS — prior to cove-. RIGHT-OF-WAY/APPROACH — prior to placement of concrete/asphalt or; if gravel approach, after completion. In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc. must be inspected prior to cover. Check with the Building department far "spec, 3 inspections" in conjunction with commercial projects. FOR INSPEECTIONS Please give one working day/24 hour notice. Different parts of you projec:t may require permits and inspections from more than one agency. Building, plumbing (includes interior reversals for sewer) and mechanical, City of Spokane Valley Building Division 688-0054 Road cuts for utilities or driveways, City of Spokane Valley Public Works 688-0195 or State Dept of Transportation 324-6000 Permits and inspections for electrical wiring, State Department of Labor Permits and inspections for Sewer Connection, Spokane County Utilities Division And Industries 324-2640 477-3604 Permits and inspections for on•site septic systems, Spokane Regional Fire sprinkler and alarm systems and private access road inspections, Spokane Valley Health District 324-1560 Fire Department 892-4122 State law RCW 19.122 requires that prior to any excavation the "CALL BEFORE YOU O G' cenler,rriust be notified. Call before you dig at least 2 working days in advance. 456-8000. r .. PERMIT EXPIRATION AND REFUNDS All permits shall expire by limitation and be declared void if a) work s c:t started within 180 days of obtaining a permit, or b) work is abandoned for 180 days or more after beginning work, or c) after t.v° gear;; from the date of permit issuance, regardless of whether the work is finished. If a permit is expired for time, a new permit may be obtainer for IV the permit fee based on the value of the remainder of the work to finish the original permit. All refund requests must be made in writing by the original permittre to ;he Building Official no later than 180 days after the date of fee payment. 100% refunds will be granted for any fee erroneously pay:-! or collected. Refunds of not more than 80% of a permit fee may be authorized when no work has been done under the permit issued. Refunds. of not more than 80% of a plan review fee paid may be authorized when an application is withdrawn or cancelled prior to the plan review berg completed. Owner / Agent Date Staff Approval Date