Loading...
2008, 06-17 Permit App 08002281 Garage RoofProject Number: 08002281 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: Permit Use: BUILD NEW ROOF SYSTEM ON EXISTING DETACHED GARAGE Date: 6/17/2008 Page 1 of 2 Contact: WATKINS, WAYNE & LEANNA Address: 3924 N SUNDERLAND CT * C - S - Z: SPOKANE, WA 99206 Setbacks: Front Left: Right: Rear: Phone: (509) 000-0000 Group Name: Site Information: Project Name: Plat Key: 001834 Name: OPPORTUNITY TR # 01-354 District: Nort Parcel Number: 45163.0179 Block: SiteAddress: 11118 E BROADWAY AVE Location:: CSV Zoning: UR-3.5 Water District: Area: 11,136 Sq Ft Nbr of Bldgs: 0 Review Information: Urban Residential 3.5 Width: 0 Nbr of Dwellings: 0 Lot: Owner: Name: WATKINS, WAYNE & LEANNA Address: 3924 N SUNDERLAND CT SPOKANE, WA 99206 Hold: ❑ Depth: 0 Right Of Way (ft): 0 Review Building Plan Review Permits: Released By: Originally Released: 6/17/2008 By: tmelbourn Contractor: OWNER Building Permit Firm: OWNER Phone: (000) 000-0000 This Application: Total Project: Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation GARAGE U-1 VB ROOF 0 $200.00 0 $200.00 STRUCTUR E Item Description RESIDENTIAL PERMIT FEE ACCESSORY PLANS REVIEW WSBC SURCHARGE Totals: 0 $200.00 Units Unit Desc 1 SELECT 1 SELECT 1 SELECT 0 $200.00 Fee Amount $69.25 $17.31 $4.50 Permit Total Fees: $91.06 Operator: jmm Printed By: jmm Print Date: 6/17/2008 Project Number: 08002281 Inv: / Notes: Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Permit Type Building Permit Fee Amount Invoice Amount $91.06 $91.06 $91.06 Amount Paid $0.00 $91.06 $0.00 Date: 6/17/2008 Page 2 of 2 Amount Owing $91.06 $91.06 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: jmm Printed By: jmm Print Date: 6/17/2008 *lane jValley Community Development Residential Construction Permit Application Permit Center 11703 E Sprague Ave, Suite B-3 Spokane Valley, WA 99206 C1- (509)688-0036 FAX: (509)688-0037 www.spokanevalley.org New PERMIT NUMBER: , -. : - \ANE 'UN 13 200E PERMIT FEE: CF NTF R struction Addition/Remodel Other: Accessory Bldg Deck SITE ADDRESS: /1%// 2 € 13/e co v J• ASSESSORS PARCEL NO: LEGAL DESCRIPTION: Building Owner: Name: A) A Lilo�i J /if 1T4, J /i ...5 Address` 1, Li 11.) , Si r` A .DE t r „op c 7 City: c (0 ,'a%7.1 r State: (A !C. Zi$, ce, Phone: f0 i - _ SS Fax: 0 Contact Person Name: r;0,4c7/1) 4 t>1).A Trt tis Phone: S c cj 2 S' ; 2 .S- ,'(5• 5 Ce- Contractor• Name: Address: City: State: Zip: Phone: Fax: Contractor Lic No: Exp Date: City Business Lic. No: Describe the scope of work in detail: _ Cost of Project: $ 00 4 OD C,' P � FX s7..tC GA-.2.4e �,- 7 .4L7_r, ; i$ T 7( i- Proposed Use: **************The followinw MUST be complete: write N/A if not applicable)********************** HEIGHT TO PEAK: //f ''° DIMENSIONS: 02x(�Y� # OF STq RIES: ✓ TOTAL HABITABLE SPACE: MAIN FLOOR TO SQ. FTG: J 2Nu FLOOR SQ. FTG: afr- UNFIN BASEMENT SQ. FTG: A / 1— IMPERVIOUS SURFACE AREA: ���j FINISHED BBeASE ENT SQ. FTG: /1% %I GARAGE SQ_ FTG: I1 Y DECK/CO . , IO SQ. FTG: / /fir'' 30% SLOPES, OVr PROPERTY:I// # OF BEDR O S: Ail 14- CONSTRUCTION TYPE: ��' 0 () HEAT SOUS ' E: % SEWER O EPTIC? 'v // The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application can be processed. SIGNATURE: Method of Payment: D Cash Bankcard #: curL Authorized Signature: REVISED 2/15/07 0 Check DATE: //' 3 C 0 Mastercard ❑ VISA Expires: VIN#: *awe 11703E Sprague Ave Suite B-3♦ Spokane Valley WA 99206 ♦509.688.0036 ♦ Fax: 509.688.0037 • Valle Y Completed Building and Mechanical Application with: Accurate address, Parcel Number and/or Legal Description, description of work, owner and contractor information, signature and date. Three (3) sets of plans including Site Plan, elevations, floor plans, foundation plans with details, roof plan, framing plans and details. Show the height of any proposed buildings or accessory structures. Floor plan for each floor: Dimension to scale(minimum 1/8") and label each room (including sq footage of house and garage on plans) show each level of existing house and square footage of any additions. Egress windows: Provide at least one window or exterior door approved for emergency escape or rescue from basement and in every room for sleeping. Floor framing details: Joist type, size, spacing and installation details. Roof framing plan and details Furnace and hot water heater location All header locations: type, size and connections Foundation plan Insulation information Decks and Stairway details All braced wall panel types: show locations and details of installation, including engineered design Smoke detector locations 22" x 30" attic access location 18" x 24" crawl space access One -hour separation detail: between house and garage Spokane Valley® For City Use Only PLUS Project Number Proj ect Address 11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206 509.688.0036 • Fax: 509.688.0037 • permitcenter@spokanevalley.org As part of our on -going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE —APPLICANT PINK — BUILDING FILE REV 9/07 SflOkane'� Valiey Project Transmittal City of Spokane Valley Community Development Department 11703 E. Sprague Ave, Suite B3 Spokane Valley, WA 99206 Phone: 509.688.0036 Site Address: 11118 E BROADWAY AVE Parcel Number: 45163.0179 Zoning: UR-3.5 Water District: Fire District: FD 01 Previous pre-app meeting Plan revisions ❑ Transmittal Date: Friday, June 13, 2008 Project Number: 08002281 Applicant: WATKINS, WAYNE & LEANNA 3924 N SUNDERLAND CT SPOKANE, WA 99206 (509) 000-0000 e-mail: e-mail: Contact: WATKINS, WAYNE & LEANNA Occupant: 3924 N SUNDERLAND CT SPOKANE, WA 99206 e-mail: (509) 000-0000 e-mail: Contractor: OWNER () - 0 Arch 1 Engineer: e-mail: Owner: WATKINS, WAYNE & LEANNA 3924 N SUNDERLAND CT SPOKANE, WA 99206 JUN 1 r 200, Project BUILD NEW ROOF SYSTEM ON EXISTING DETACHED GARAGE Description: Building Landuse Engineer Utilities Health Fire Dist Assessor APPLICATIO N CONSTRUCTION PLAN ' 1 SITE PLA TD Please send all plan review and project comments via e-mail to the highlighted individuals. ROOF ASSEMBLIES R905.8.7 Shake placement. The starter course at the eaves shall be doubled and the bottom layer shall be either 15-inch (381 mm), 18-inch (457 mm) or 24-inch (610 mm) wood shakes or wood shingles. Fifteen -inch (381 min) or 18-inch (457 mm) wood shakes may be used for the final course at the ridge. Shakes shall be interlaid with 18-inch-wide (457 mm) strips of not less than No. 30 felt shingled between each course in such a manner that no felt is exposed to the weather by positioning the lower edge of each felt strip above the butt end of the shake it covers a distance equal to twice the weather exposure. TABLE R905.8.6 WOOD SHAKE WEATHER EXPOSURE AND ROOF SLOPE ROOFING MATERIAL LENGTH (inches) GRADE EXPOSURE (inches) 4:12 pitch or steeper Shakes of naturally durable 18 No. 1 71/2 wood 24 No. 1 10a 18 No. 1 71/2 Preservative -treated taper sawn shakes of Southern 24 No. 1 10 Yellow Pine 18 No. 2 51/2 24 No.2 71/2 18 No. 1 71/2 Taper -sawn shakes of 24 No. 1 10 naturally durable wood 18 No. 2 51/2 24 No.2 71/2 For SI: 1 inch = 25.4 mm. a. For 24-inch by 3/B inch handsplit shakes, the maximum exposure is 71/2 inches. R905.8.8 Valley flashing. Roof valley flashing shall not be less than No. 26 gage [0.019 inch (0.5 mm)] corrosion -resis- tant sheet metal and shall extend at least 11 inches (279 mm) from the centerline each way. Sections of flashing shall have an end lap of not less than 4 inches (102 mm). R905.8.9 Label required. Each bundle of shakes shall be identified by a label of an approved grading or inspection bureau or agency. R905.9 Built-up roofs. The installation of built-up roofs shall comply with the provisions of this section. R905.9.1 Slope. Built-up roofs shall have a design slope of a minimum of one-fourth unit vertical in 12 units horizon- tal (2-percent slope) for drainage, except for coal -tar built-up roofs, which shall have a design slope of a mini- mum one- eighth unit vertical in 12 units horizontal (1-per- cent slope). R905.9.2 Material standards. Built-up roof covering mate- rials shall comply with the standards in Table R905.9.2. R905.9.3 Application. Built-up roofs shall be installed according to this chapter and the manufacturer's installation instructions. R905.10 Metal roof panels. The installation of metal roof panels shall comply with the provisions of this section. R905.10.1 Deck requirements. Metal roof panel roof cov- erings shall be applied to solid or spaced sheathing, except where the roof covering is specifically designed to be applied to spaced supports. R905.10.2 Slope. Minimum slopes for metal roof panels shall comply with the following: 1. The minimum slope for lapped, nonsoldered-seam metal roofs without applied lap sealant shall be three units vertical in 12 units horizontal (25-percent slope). 2. The minimum slope for lapped, nonsoldered-seam metal roofs with applied lap sealant shall be one-half vertical unit in 12 units horizontal (4-percent slope). Lap sealants shall be applied in accordance with the approved manufacturer's installation instructions. 3. The minimum slope for standing -seam roof systems shall be one -quarter unit vertical in 12 units horizon- tal (2-percent slope). R905.10.3 Material standards. Metal -sheet roof covering systems that incorporate supporting structural members shall be designed in accordance with the International Building Code. Metal -sheet roof coverings installed over structural decking shall comply with Table R905.10.3(1). The materials used for metal -sheet roof coverings shall be naturally corrosion resistant or provided with corrosion resistance in accordance with the standards and minimum thicknesses shown in Table R905.10.3(2). R905.10.4 Attachment. Metal roof panels shall be secured to the supports in accordance with this chapter and the man- ufacturer's installation instructions. In the absence of manu- facturer's installation instructions, the following fasteners shall be used: 1. Galvanized fasteners shall be used for steel roofs. 2. Three hundred series stainless steel fasteners shall be used for copper roofs. 3. Stainless steel fasteners are acceptable for metal roofs. R905.11 Modified bitumen roofing. The installation of modi- fied bitumen roofing shall comply with the provisions of this section. 296 2006 INTERNATIONAL RESIDENTIAL CODE F\)S ThAr r e -.sue,, -- . _:: (L1c1 5 T4 NJ (o-:.R_oo !Zoo ifuq - /6, ,t4 4)c' 004A) © PE AJ - To 13 E tjeLa S P IF NE c,i IZ0 O F e A �SA.�'p.cy.p L_ flt Po %-4 Cm) PROVIDE DIAGRAMS AND ENGINEERING LAYOUTS FOR ROOF TRUSSES, BEAMS AND FLOOR SYSTEMS PRIOR TO FRAMING INSPECTIONS CITY COPY THIS BUILDING SUBJECT TO FIELD INSPECTION CORRECTIONS REVIEWED FOR CQDE�OMPLIANCE SPOKANE VAf_/.E` i NG DIVISION T� //�/ot