2012, 05-16 Permit App BLD-2012-0638 Storage BldgSp®kane
Valley-
Community Development
Residential Construction
Permit Application
SITE ADDRESS: 159li V c
Permit Center
11703 E Spragu e, Suite B-3
Spokane Valley, 99206
(509)688-0036 FAX: (509)688-0037
www.spokanevalley.org
PERMIT NUMBER: 6101— jZ 38
OMIT FEE:
New Constructi
U Addition/Remold rojR
LJ Other: RECi`IVF
3E6/906"/
ASSESSORS PARCEL NO: LEGAL DESCRIPTION: i
Building Owner:
Name:e ,/Q/eRd q 5-5 eR LI
Address/Tod (5, 5�i,,,,. .3,�,
City: ` cStater Zip: ` 64%
Phone: ,2;..? _75
.7/ Fax:
Contact Person
Name: _ 1 z 50,
a, G r �amiSCqivc
- 3 5 ? 7
Phone:
Describe the scope of work in detail:
MAY 16 2012
CS/ PERMIT GEN I ER
Contractor: B f 1)" # {� ((' A C---
Name: 1
Address: / c f E, ffp2 95ci ,e__
City: State: Zip: of16,3r
Phone: ei a oZ , Li 3 8 y Fax: c1 - 4 _ Li 0 67
Contractor Lic No: Exp Date: ?4,1�
CL i.L.n I'Qt33rh5
City Business Lic. No: 6 p a. ---7 ,1/4./ U ) a)
Cost of Project: $ /4 _
Proposed Use: n2.j 4 CCS l,s Gies7.rete DoC.5 b L'% -
**************The following MUST be complete: (write N/A if not applicable)**********************
HEIGHT TO PEA
DIMENSIONS:DIMENSI3
# OF STORIES: /
TOTAL SPACE:
MAIN FLOOR TO SQ.
FTG: /! a8c.)
2Nu FLOOR SQ. FTG:
_
UNFIN BASEMENT SQ. FTG:
IMPERVIOUS SURFACE
AREA: r—
FINISHED BASEMENT
SQ. FTG: _�
GARAGE SQ. FTG:
DECK/COV. PATIO SQ. FTG:
--�
30% SLOPES ON _
PROPERTY:
# OF BEDROOMS:CONSTRUCTION
r—
TYP
s
HEAT SOURCE:
---,
SEWER OR SEPTIC?
(R-..
Ra N
The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before
this application can be processed.
SIGNATURE:
Method of Payment:
❑ Cash
Bankcard #:
❑ Check
❑ Mastercard
Expires:
DATE:
❑ VISA
VIN#:
Authorized Signature:
REVISED 2/15/07
NAME eCA /thi( e Aq
m,
ADDRESS 8L/c) V E`-j 'c-k"
lS`
LEGAL`
PARCEL #•
•
PLANNING DEPT, APPROVED
DATE: 5// 540i2
1-1' iO Pcp..t4 vF o,L.h.(ry,
Spokane
Valley.
Restential Driveway
PAVING WAIVER
Community Development — Planning Division
11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206
509.720.5026 ♦ Fax: 509.688.0037 • planning@spokanevallev.org
Spokane Valley Municipal Code (SVMC) Section 19.40.020.B; "All residential driveway and off-street parking areas shall be paved with
asphalt Portland cement, grasscrete, paver blocks or other equivalent hard surface material". A paving waiver can only be granted if
the structure you are proposing is not going to require a driveway for daily use.
PART I — OWNER INFORMATION
OWNER NAME: (14.4k fey RotA7.5e., 4C.A.
PARCEL #:
5 - 7 e i, 67. 7-Gf,‘,
ADDRESS: 0 r «,`QJX1J1y
CITY: p`"` 6 L 1r r� ae?/
STATELra
Zip:
PHONE: 27y.— ZJ ! l
FAX:
CELL:
EMAIL:
PART II —DETAILS OF PAVING WAIVER
1. Do you have an existing garage for parking daily use vehicles? YES ❑ NO
2. Is the proposed detached structure used for storage only? YES ❑ NO
3. Do you plan on using the detached structure to park vehicles? ❑ YES 1lO If yes, then
what type of vehicles?
4. Do you plan to conduct a business from proposed detached structure? ❑ YES O If so, what
is the nature of your business?
PART III —AUTHORIZATION
I,(PRINT NAME) C VPL7 Pip wks-sGA Vowner, hereby confirm that the information provided on this
form is true and correct. I acknowledge that any change in the foregoing conditions, could require
the City to impose paving requirements. I further agree to report any change in these conditions to
the Spokane Vali ommunity Development Department, Planning Division, within 30 days.
Date
Owner Signat
PART IV — DECISION
STAFF HAS REVIEWED THE PROPOSED PAVING WAIVER ON BEHALF OF THE COMMUNITY DEVELOPMENT
DIRECTOR AND FIND THE REQUEST IS GRANTED AT 4/0 y _F, �,/-Y a u %i c
SAID ADDRESS FOR PERMIT #: ,L� -076' /; m9% '38 d
Y�lr 414A/64i<
Planning Division Staff Signature
Date
Created 6/27/11
Page 1 of 1
BUILDING. SECTION
17 � 5�
ettg/ey .POck5,e,eaq
e'eaq 3(2_0(
,Ftrht.,_ 60.1)1
Project
# — a --‘
RECEIVED
MAY 16 2012
CSV PERMIT CENTER
S U g #
REV.
8
•
Target Date sheet
Spokane~
jUalley
For City Use Only
PLUS Project St . 201 Z ' (a
Project Address (�
c!c. 4 E f i re, q(11c_'t�
11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206
509.720-5240 1 Fax: 509.688.0037 • permitcenter®spokanevalley.org
As part of our on -going commitment to customer service during the review process of your project application, we are
providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet
this date, we will contact you with a revised target date.
Your application review TARGET DATE is .S -- 2 / - /2-
The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is
not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
> Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be
several days before they can look at your new or revised information.
> Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise
for dealing with reviewer comments would be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your
target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will
save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as
indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does
not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from
substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is
complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review.
Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email,
or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the
application are received, a Permit Specialist will process the application and contact the person specified on your application for
permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at
that time.
CD-003 V-7/ 06-21-11 Page 1 of 1