2012, 06-05 Permit SW-12001487 SewerSPOKANE COUNTY BUILDING AND PLANNING PERMIT Application Number: SW-12001487 Permit Issued Date: 06/05/2012 Expiration Date: Project Description: SEWER CONNECTION Primary Contact: MOUNTAIN MOVERS CONSTRUCTION INC Applicant: MOUNTAIN MOVERS CONSTRUCTION INC Permit Type: SEWER Address: 2024 E 10TH AVE SPOKANE, WA 99202 Phone: (509)979-6840 Email: SITE INFORMATION: Site Address: Parcel Number: 8404 E BROADWAY AVE 45184.0406 Subdivision: HUTCHINSON'S ADDITION Assessor's Description: HUTCHINSONS ADD W1/2 L2 ;E1/2 L3 B20 EXC ST Inspection Area: Water District: Hutchinson Irrigation District #16 Zoning: Owner: ROUSSEAU, RICHARD D Address: PO BOX 141932 SPOKANE VALLEY, WA 99214-1932 Phone: Email: Fire District: Fire District 1 Land Area: 0.8902 acres / 38778 sqft CONTRACTOR INFORMATION: General Contractor MOUNTMC935DO *MOUNTAIN MOVERS CONSTRUCTION 2024 E 10TH AVE SPOKANE, WA 99202 509-535-0398 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION FEE DETAIL: Processing - Utilities Utilities Permit 1 $125.00 $125.00 Total Fee: $125.00 $25.94 $125.00 $150.94 CONDITIONS: Inside Public Transit Benefit Area CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. Date Printed: 06/05/2012 15:35:05 Printed by: IIS APPPOOLIASP.NET v4.0 SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW-12001487 06/05/2012 Expiration Date: FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30-MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 06/05/2012 15:35:05 Printed by: IIS APPPOOLb4SP.NET v4.0