2013, 01-29 Permit SW-13000046 SewerSPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Application Number: SW-13000046
Permit Issued Date:
01/29/2013
Expiration Date: 01/30/2013
Project Description:
Project Name:
Permit Type:
SEWER CONNECTION
HARRINGTON
SEWER
Primary Contact:
Applicant:
Address:
Phone:
Email:
TEEPLES, BARBARA J
TEEPLES, BARBARA J
8605 E BROADWAY
SPOKANE VALLEY, WA 99212
SITE INFORMATION:
Site Address:
Parcel Number:
Subdivision:
Assessor's Description:
Inspection Area:
Zoning:
8523 E BROADWAY AVE
45181.1524
HUTCHINSON'S
ADDITION
HUTCHINSONS ADDITION W1/2 LT 8 BLK 14 EXC
ST
Water District:
Hutchinson Irrigation
District #16
Owner:
Address:
Phone:
TEEPLES, BARBARA J
8605 E BROADWAY
SPOKANE VALLEY, WA 99212
Email:
Fire District: Spokane Valley Fire
Land Area: 0.44 Acre(s)
CONTRACTOR INFORMATION:
Owner Acting As Builder
OWNER
OWNER PERFORMING THE WORK
SAME AS SITE ADDRESS
SAME, WA 00000
DETAILS:
Class
Type
Quantity
Unit Charge Value
SEWER SEWER CONNECTION
FEE DETAIL:
Processing - Utilities
Utilities Permit
1
$125.00 $125.00
Total Fee:
$125.00
$26.32
$125.00
$151.32
CONDITIONS:
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
Inside Public Transit Benefit Area
Date Printed: 01/29/2013 10.13:33
Printed by: IIS APPPOOL\SmartGovProdApp
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW-13000046 01/29/2013
Expiration Date: 01/30/2013
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30-MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 01/29/2013 10:13:33 Printed by: IIS APPPOOL\SmartGovProdApp