2013, 03-13 Permit SW-13000207 SewerSPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW-13000207 Permit Issued Date: 03/13/2013
Project Description: SEWER CONNECTION
Project Name: EASTON 2
Primary Contact: JEFF S LENZ CONSTRUCTION INC
Phone: 509-869-2079
Applicant: JEFF S LENZ CONSTRUCTION INC
Address: PO BOX 483
DEER PARK, WA 99006
Phone: 509-869-2079
Email:
SITE INFORMATION:
Site Address: 10821 E BROADWAY AVE Owner: COLLIER, WILLIAM F
Parcel Number: 45162.1021 Address: 10821 E BROADWAY AVE
SPOKANE VALLEY, WA 99206
Phone:
Assessor's Description: OPPORTUNITY B69 S181.69 FT OF E1/5 OF E1/2 Email:
& S181.69FT 0 F E10FT OF W4/5 OF E1/2
Inspection Area: : (509)-477-3675
Water District: Modern Electric Water Fire District: Spokane Valley Fire
Company
Zoning: Land Area: 15444 Square Feet
CONTRACTOR INFORMATION:
JEFFSSL962D6, Exp. 04/07/2014
JEFF S LENZ CONSTRUCTION INC
PO BOX 483
DEER PARK, WA 99006
509-869-2079
DETAILS:
Class
SEWER
Type
Quantity Unit Charge Value
FEE DETAIL:
Processing - Utilities
Utilities Permit
SEWER CONNECTION
Total Fee:
$26.32
$125.00
$151.32
1 $125.00 $125.00
$125.00
CONDITIONS:
Inside Public Transit Benefit Area
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30-MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
Date Printed: 03/13/2013 10:56:08 Project Coordinator: Dawn Dompier
SPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW-13000207 Permit Issued Date: 03/13/2013
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 03/13/2013 10:56:08 Project Coordinator: Dawn Dompier