Loading...
2008, 10-09 Permit App 08003940 Pole BldgProject Number: 08003940 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: Permit Use: 576 SQFT POLE BLDG Date: 10/9/2008 Page 1 of 2 Contact: SMITH, PATRICIA L Address: 11602 E BROADWAY AVE C - S - Z: SPOKANE, WA 99206 Setbacks: Front Left: Right: Rear: Phone: (509) 921-9893 Group Name: Site Information: Project Name: Plat Key: 001852 Name: OPPORTUNITY TR # 01-354 District: Nort Parcel Number: 45164.0121 Block: SiteAddress: 11602 E BROADWAY AVE Location:: CSV Zoning: R-3 Water District: SF Res District Area: 20,685 Sq Ft Width: 65 Nbr of Bldgs: 2 Nbr of Dwellings: 1 Review Information: Lot: Owner: Name: SMITH, PATRICIA L Address: 11602 E BROADWAY AVE SPOKANE, WA 99206 Hold: G] Depth: 300 Right Of Way (II): 60 Review Building Plan Review Released By: Originally Released: 10/6/2008 By: tmelbourn Landuse/Zoning/IIE Conditions Permits: Released By: Originally Released: 10/9/2008 By: tschmidt Operator: JD Printed By: jmm Print Date: 10/9/2008 Project Number: 08003 940 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Contractor: OWNER Description Grp Type Notes POLE BDLG U-1 VB Item Description RESIDENTIAL PERMIT FEE ACCESSORY PLANS REVIEW WSBC SURCHARGE Building Permit Date: 10/9/2008 Page 2 of 2 Firm: OWNER Phone: (000) This Application: So Ft Valuation 576 $10,944.00 000-0000 Total Project: So Ft Valuation 576 $10,944.00 Totals: 576 $10,944.00 Units Unit Desc 1 SELECT 1 SELECT 1 SELECT Permit Total Fees: 576 $10,944.00 Fee Amount $195.25 $48.81 $4.50 $248.56 As per SVMC 19.40.020(B) - All residential driveways and off-street parking areas shall be paved with asphalt, cement...or other equivalent hard surface material. Condition shall be met prior to final inspection. Payment Summary: Permit Type Building Permit Fee Amount Invoice Amount $248.56 $248.56 $248.56 Amount Paid $0.00 $248.56 $0.00 Amount Owing $248.56 $248.56 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: jmm Print Date: 10/9/2008 Accessory Bldg Deck Spolkane Valley. Community Development Residential Construction Permit Application Permit Center 11703 E Sprague Ave, Suite B-3 Spokane Valley, WA 99206 (509)688-0036 FAX: (509)688-0037 www. spokanevalley. org PERMIT NUMBER: PERMIT FEE: L f New Construction Addition/RTIodel T Other: � r„_,. SITE ADDRESS: // O �o ���,/�-'�- J 4J ' I 4k 9 ASSESSORS PARCEL NO: LEGAL DESCRIPTION: . Building Owner: Name: /�i' �G dam- S'r,it c L, Address: ///� O �__ 0 8 a dw / , �_ City%x0 /�F„A [``/ State: 0 Zip' ..00(. Phone.. s..d: ci`al / 66", cJFax: Contact Person Name: Phone: Describe the scope of work in detail: Name: Address: City: State: Zip: Phone: Fax: Contractor Lic No: Exp Date: City Business Lic. No: Cost of Project: $ _o-e,;- 72_H Proposed Use: 1- (a ►'��. 5S **************The following MUST be complete: (write N/A if not applicable)********************** HEIGHT AO P : DIME SIO S: # OF STORIES: TOTAL HABITABLE SPACE: MAIN FLOO TO SQ. FTG: 2Nu FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE AREA: FINISHED BASEMENT SQ. FTG: GARAGE SQ. FTG: 5 ? (0 I> if''--- DECK/COV. PATIO SQ. FTG: 30% SLOPES ON TY: # OF BEDROOMS: CONSTRUCTION TYPE: HEAT SOURCE: SEWS R SEPTIC? The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Planditional information may be required to be submitted, and subsequently approved before this application c n be pr essed. SIGNATURE: Method of Payment: ❑ Cash Bankcard #: ❑ Check DATE: /Q 3`d ❑ Mastercard ❑ VISA Expires: VIN#: Authorized Signature: REVISED 2/15/07 RESIDENTIAL CHECK LIST DIRECTIONS: Place a check mark in box next to each document required for complete submittal. ❑ SITE PLAN o Property lines and dimensions o Direction arrow pointing North and orientation to streets o Proposed/existing buildings (footprint and dimensions) o Utilities, septic tank/drain field locations and distances o Setbacks to property lines o Distance between buildings o Right of way/easement location & sizes o Driveway approach size and location BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned) O Elevations (Front/Rear/Sides) with roof peak and wall height including basement: ❑ Foundation Plan (crawlspace, basement or slab on grade): o Footing sizes and locations o Perimeter concrete foundation wall sizes o Crawlspace ventilation o Supporting wood cripple walls or beams o Thickened concrete pads supporting beams or girder trusses O Floor Plan of each level (finished or unfinished) with dimensions: o Floor Joist direction, size and spacing o Header, beam or concrete lintel sizes o Brace wall panel locations o Water heater and furnace locations o Exhaust fan locations o Deck or concrete patio sizes and locations ❑ Roof Plan: o Engineered truss direction and spacing o Rafter and over frame direction, size and spacing ❑ Wall Section Detail including: Roof o Slope/ roofing material/ underlayment/ ice dam protection o Sheathing size and type Ceiling o Joist size and spacing Wall o Height/ top plate/ stud size and spacing/ sole plate o Exterior sheathing size and type Floor o Joist size and spacing Foundation Wall o Concrete or Masonry unit width o Earth to wood separation distance Footing o Size Radon o Passive system with 6mil vapor barrier Miscellaneous Construction Details ❑ Deck: o Floor plan/ side view/ dimensions o Floor Joist/ decking direction, size and spacing O Stairway tread rise & run and nosing o Window and door location and sizes o Window well locations if applicable o Room usage labels o Smoke detector locations o Attic and crawl space access locations o Fire Wall construction o Ridge, eave and valley lines o Beam and girder size and location o Truss or rafter size, spacing & connection o Attic insulation/ air space baffle/ ventilation o Size of ceiling gypsum wall board o Siding/ exterior house wrap/ anchor bolts o Insulation, vapor barrier, gypsum wall board o Sheathing or concrete floor size/ insulation o Footing bottom to finished ground level depth o Horizontal & vertical reinforcement if any o Reinforcement if any o Active system with 6 mil vapor barrier o Footings/ post/ and beam size and locations o Handrail / Guard height & spacing Spokane Valley® For City Use Only PLUS Project Number Project Address 11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206 509.688.0036 • Fax: 509.688.0037 • permitcenter@spokanevalley.org As part of our on -going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. )in(5( Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. > Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. > Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE -APPLICANT PINK - BUILDING FILE REV 9/07 My Commission expires: Spokane ••*Va11ey PERMIT CENTER 11703 E. Sprague Ave., Suite B-3 Spokane Valley, WA 99206 509-688-0036; Fax 509-688-0037 www.spokanevalley.org Affidavit in Lieu of General Contractor Registration State of Washington County of Spokane I, PT1+4 l C i ,9— S''k 4-(state as follows: (Print name as signed) 1. I have made application for a building permit from the City of Spokane Valley, Washington. 2. I understand that state law requires that all building construction contractors be registered with the State of Washington. The exceptions to this requirement are stated under RCW 18.27.090, a copy of which is printed on the reverse side of this affidavit. 3. I understand that prior to issuance of a building permit for work that is to be done by any contractor, the City of Spokane Valley must verify either that the contractor is registered by the State of Washington, or that one of the exemptions stated under RCW 18.27.090 applies. 4. In order to provide verification to the City of Spokane Valley of my compliance with this requirement, I hereby attest that after reading the exemptions from the registration requirement of RCW 18.27.090, I consider the work authorized under this building permit to be exempt under No. , and will therefore, not be performed by a registered contractor. I understand that I may be waiving certain rights that I might otherwise have under state law in any decision to engage an unregrstgred contractor to perform construction work. Signed and sworn to before zn_ e t 's Day of /O , 200 r /tvl c, L Sou i� N 's Name (Print) Signature NOTARY PUBLIC in and for the State of Washington, residing at Cf CX iCounty \ I I October 15, 2007 Page 1 of 2 P:1Community Development\Forms\Building Forms Revised Code of Washington 18.27.090 Exemptions. The registration provisions of this chapter do not apply to: I) An authorized representative of the United States government, the state of Washington, or any incorporated city, town, county, township, irrigation district, reclamation district, or other municipal or political corporation or subdivision of this state; 2) Officers of a court when they are acting within the scope of their office; 3) Public utilities operating under the regulations of the utilities and transportation commission in construction, maintenance, or development work incidental to their own business; 4) Any construction, repair, or operation incidental to the discovering or producing of petroleum or gas, or the drilling, testing, abandoning, or other operation of any petroleum or gas well or any surface or underground mine or mineral deposit when performed by an owner or lessee; 5) The sale or installation of any finished products, materials, or articles of merchandise that are not actually fabricated into and do not become a permanent fixed part of a structure; 6) Any construction, alteration, improvement, or repair of personal property performed by the registered or legal owner, or by a mobile/manufactured home retail dealer or manufacturer licensed under chapter 46.70 RCW who shall warranty service and repairs under chapter 46.70 RCW; 7) Any construction, alteration, improvement, or repair carried on within the limits and boundaries of any site or reservation under the legal jurisdiction of the federal government; 8) Any person who only furnished materials, supplies, or equipment without fabricating them into, or consuming them in the performance of, the work of the contractor; 9) Any work or operation on one undertaking or project by one or more contracts, the aggregate contract price of which for labor and materials and all other items is less than five hundred dollars, such work or operations being considered as of a casual, minor, or inconsequential nature. The exemption prescribed in this subsection does not apply in any instance wherein the work or construction is only a part of a larger or major operation, whether undertaken by the same or a different contractor, or in which a division of the operation is made into contracts of amounts less than five hundred dollars for the purpose of evasion of this chapter or otherwise. The exemption prescribed in this subsection does not apply to a person who advertises or puts out any sign or card or other device which might indicate to the public that he or she is a contractor, or that he or she is qualified to engage in the business of contractor; 10) Any construction or operation incidental to the construction and repair of irrigation and drainage ditches of regularly constituted irrigation districts or reclamation districts; or to farming, dairying, agriculture, viticulture, horticulture, or stock or poultry raising; or to clearing or other work upon land in rural districts for fire prevention purposes; except when any of the above work is performed by a registered contractor; 1 I) An owner who contracts for a project with a registered contractor, except that this exemption shall not deprive the owner of the protections of this chapter against registered and unregistered contractors. The exemption prescribed in this subsection does not apply to a person who performs the activities of a contractor for the purpose of leasing or selling improved property he or she has owned for less than twelve months; 12) Any person working on his or her own property, whether occupied by him or her or not, and any person working on his or her personal residence, whether owned by him or her or not but this exemption shall not apply to any person otherwise covered by this chapter who constructs an improvement on his or her own property with the intention and for the purpose of selling the improved property; 13) Owners of commercial properties who use their own employees to do maintenance, repair, and alteration work in or upon their own properties; 14) A licensed architect or civil or professional engineer acting solely in his or her professional capacity, an electrician licensed under the laws of the state of Washington, or a plumber licensed under the laws of the state of Washington or licensed by a political subdivision of the state of Washington while operating within the boundaries of such political subdivision. The exemption provided in this subsection is applicable only when the licensee is operating within the scope of his or her license; 15) Any person who engages in the activities herein regulated as an employee of a registered contractor with wages as his or her sole compensation or as an employee with wages as his or her sole compensation; 16) Contractors on highway projects who have been prequalified as required by RCW 47.28.070, with the department of transportation to perform highway construction, reconstruction, or maintenance work; 17) A mobile/manufactured home dealer or manufacturer who subcontracts the installation, set-up, or repair work to actively registered contractors. This exemption only applies to the installation, set-up, or repair of the mobile/manufactured homes that were manufactured or sold by the mobile/manufactured home dealer or manufacturer; 18) An entity w lo7ds ; ethci license u certified:Jo specialty e electrical contractor's 'W that employs a a"icertified residential trainee meeting the requirements' 4 f 6haptef 6.2r RCW to perform plumbing work that' is incidentally, directly, and immediately appropirgteih the like -in -kind replacement of a household applinn& or other small household utilization equipment that requires limited electric power and limited waste and/or water connections. An electrical trainee must be supervised by a certified electrician while performing plumbing work. October 15, 2007 Page 2 of 2 P:\Community Development\Forms\Building Forms 1 Jo . c-or' C), p y SPvk APT V y v 57.c. f t t'. L-1 5 i (ot. o t 2 1 -to, L `,S tl Ttc r� VD ?oSwC-> OfPD2To c-vy quo 6 '(5 of mJC iJr l Ptir6 Z t-f yC 7 4 pot t VA) t, fl PG—) 160 _a_eoe.��a, 7o_ t 1 bo z. 1\9c7 Av€ . Zo,6foS 43 5 a M € 414ib(r btr 14— log li Z 3' 4.1 z �, 1cC,C-°z-55oe-/ 0-1 PLANNING DEPT. APPROVED BY: DATE• w//66