Loading...
2011, 05-31 Permit App 11001507 Pole BldgProject Number: 11001507 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: Permit Use: 24 X 24 POLE BLDG/STORAGE Setbacks: Front Left: Right: Rear: Site Information: Plat Key: 002755 Name: VERA Parcel Number: 45151.1316 Date: 5/31/2011 Page 1 of 2 Contact: CUMMINGS, SHERRYL A Address: 13721 E BROADWAY AVE C - S - Z: SPOKANE VALLEY, WA 99216 Phone: (509) 844-4204 Group Name: Project Name: District: Nort Block: Lot: SiteAddress: 13721 E BROADWAY AVE Owner: Name: CUMMINGS, SHERRYL A Address: 13721 E BROADWAY AVE Location:: CSV SPOKANE VALLEY, WA 99216 Zoning: R-3 SF Res District Water District: 010 VERA Area: 18,400 Sq Ft Width: 0 Nbr of Bldgs: 0 Nbr of Dwellings: 1 Review Information: so - Hold: ❑ Depth: 0 Right Of Way (ft): 0 Review Building Plan Review Released By: Originally Released: 5/27/2011 By: tmel bou rn Landuse/Zoning/HE Conditions Permits: Released By: Originally Released: 5/27/2011 By: Ibarlow Operator: jmm Printed By: JD Print Date: 5/31/2011 Project<Number: 11001507 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Contractor: OWNER Description Grp kpA POLE BDLG U-1 VB Item Description RESIDENTIAL PERMIT FEE ACCESSORY PLANS REVIEW WSBCC SURCHARGE Building Permit Date: 5/31/2011 Firm: OWNER Phone: (000) 000-0000 This Application: Total Project: Notes Sq Ft Valuation Sq Ft Valuation PLAN 576 $10,944.00 576 $10,944.00 REVIEW FEE Totals: 576 $10,944.00 576 $10,944.00 Units Unit Desc Fee Amount 1 SELECT $195.25 1 SELECT $48.81 1 SELECT $4.50 Permit Total Fees: $248.56 Notes: This permit is granted based on the identified use of a shop and storage - not a garage for daily use vehicles. A paved driveway is not required for a shop/storage buidling. If the structure is used as a garage for the storage of daily use vehicles a paved driveway that has access to a public street shall be required. Payment Summary: Permit Type Building Permit Fee Amount Invoice Amount $248.56 $248.56 $248.56 $248.56 Amount Paid Amount Owing $48.81 $199.75 $48.81 $199.75 Page 2 of 2 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: jmm Printed By: JD Print Date: 5/31/2011 COmmunity Development Department Permit Center so11703 East Sprague Avenue, Suite B-3 Spokane Valley, WA 99206 ky e Tel: (509) 688-0036 000.ValleY Fax: it en ka37 permit ente688rspo00nevalleY.orq RESID IAL CONSTRUCTION PERMIT APPLICATION g ACCESSORY BUILDING (Staff Use Only) PERMIT NUMBER: PERMIT FEE: ❑ NEW CONSTRUCTION ❑ ADDITION/REMODEL Ea DECK ❑ OTHER SITE ADDRESS: /3 72-7 ASSESSORS PARCEL NO.: LEG L DESCRIPTION: BUILDING OWNER NAME: r- • NAME: I eI c / , n i m, ADDRESS: STATE: vfY-- CITY: �Q" 1 't PHONE: S4 17/ FAX: CONTACT NAME: ��Jt� ( /�'1/�Yl PHONE: D9r g�Y�`7' �-�/ V FAX: CONTRACTOR NAME: Z/s5tql �,/ / .JJlS MAILING ADDRESS: 170 0 2 CITY: aii14-7/ PHONE: 9—'ZZ_ YO 0 FAX: CELL: CONTRACTOR LICENSE NO.: O/ZfE(?'L EXP RES:6-- CITY BUSINESS LICENSE NO.: ZIP: 9'19 U lQ CELL: JCx-1"77 CELL: �Q STATE: ZIP: 9�0� DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE & PROPOSED USEL �LI zy dal.- 13/J( S- ,sa Q ��r1c Sho y ( L���,65 � � P ****YOU MUST COMPLETE THE FOLLOWING**** MARK N/A IF NOT APPLICABLE Height to Pea , t Li Dimensions: C Z U Li 1 No. of Stories: ( Total Habitable Space: Main FI or SQ FT: -, 7 % Upper Floor S FT: Unfinished Base ent SQ FT: iN __(.1------- Finished BNa�ement SQ FT: t�' Garage SQ FT: ^ t, 6y Deck/Cov re Patio SQ FT: k }/ Impervious Surf ce Area: ., r 30% Slopes on ��� Property: No. of Bedrooms: aV Construction Type: 4pv4Heat Source. _.1—" Sewer or Septic: TOTAL COST OF PROJECT: $ 0.4 DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted and subsequently approved before this application can be processed. Date: 5--27 l/ Updated 1-11-11 Page 1 of 1 http://www.spokanevalley.org/filestorage/124/938/210/948/1496/Building_Permit_-_Residential_11-11-11.doc RESIDENTIAL CHECK LIST DIRECTIONS: Place a check mark in box next to each document required for complete submittal. ❑ SITE PLAN o Property lines and dimensions o Direction arrow pointing North and orientation to streets ❑ Proposed/existing buildings (footprint and dimensions) o Utilities, septic tank/drain field locations and distances o Setbacks to property lines o Distance between buildings o Right of way/easement location & sizes ❑ Driveway approach size and location BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned) O Elevations (Front/Rear/Sides) with roof peak and wall height including basement: ❑ Foundation Plan (crawlspace, basement or slab on grade): o Footing sizes and locations o Perimeter concrete foundation wall sizes o Crawlspace ventilation o Supporting wood cripple walls or beams o Thickened concrete pads supporting beams or girder trusses O Floor Plan of each level (finished or unfinished) with dimensions: o Floor Joist direction, size and spacing o Header, beam or concrete lintel sizes o Brace wall panel locations o Water heater and furnace locations o Exhaust fan locations o Deck or concrete patio sizes and locations ❑ Roof Plan: ❑ Engineered truss direction and spacing o Rafter and over frame direction, size and spacing ❑ Wall Section Detail including: Roof o Slope/ roofing material/ underlayment/ ice dam protection o Sheathing size and type Ceiling o Joist size and spacing Wall o Height/ top plate/ stud size and spacing/ sole plate o Exterior sheathing size and type Floor o Joist size and spacing Foundation Wall o Concrete or Masonry unit width o Earth to wood separation distance Footing o Size Radon ❑ Passive system with 6mil vapor barrier Miscellaneous Construction Details ❑ Deck: o Floor plan/ side view/ dimensions o Floor Joist/ decking direction, size and spacing O Stairway tread rise & run and nosing o Window and door location and sizes o Window well locations if applicable ❑ Room usage labels o Smoke detector locations o Attic and crawl space access locations o Fire Wall construction o Ridge, eave and valley lines o Beam and girder size and location o Truss or rafter size, spacing & connection o Attic insulation/ air space baffle/ ventilation o Size of ceiling gypsum wall board o Siding/ exterior house wrap/ anchor bolts o Insulation, vapor barrier, gypsum wall board o Sheathing or concrete floor size/ insulation o Footing bottom to finished ground level depth o Horizontal & vertical reinforcement if any o Reinforcement if any o Active system with 6 mil vapor barrier ❑ Footings/ post/ and beam size and locations ❑ Handrail / Guard height & spacing Spokane Valley® For City Use Only PLUS Project Number // / O') Project Address //% / E L ram& 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org As part of our on -going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review • Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. > Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE - APPLICANT PINK - BUILDING FILE REV 9/07 Storage Building (No Value Given) 10.0' Bed Room Red Room RECEIVED CSV PERMIT CENTER MAY 2 11 Project # Name Submittal # 49.0' Bath 63.0' Kitchen Den 10 x 21 Dining Room Living Room Patio scAL,_-= M Laundry -1$10' Closet Bath Bed Room b ,ex-v Cd n iftig- )3121 E6t-O4ct b 1 fi7 _s 8 0 3V01:4901A APPROVED BY t-e✓'I Stlikanei� Community Development 11707 E Sprague Ave Suite 106 ♦ Spokane Valley WA 99206 509.921.1000 • Fax: 509.921.1008 • cityhall@spokanevalley.org April 29, 2011 Sherryl A. Cummings 13721 E Broadway Ave. Spokane Valley, WA. 99216 Dear Ms. Cummings: I have received your letter regarding constructing a pole barn on your property at the above address. Spokane Valley regulations require all driveways to be paved, however, if you are not storing vehicles in your new building, no driveway will be required. This will placed as a condition on your building permit and if conditions change and you or a future owner decide to put vehicles in the pole barn, you can add the paved driveway at that time. Please bring this letter with you when you submit your permit so that the staff will know that I have addressed this issue with you. Sincerely, 961tZt4, mcCew�.. Kathy McClung Community Development Director CC: Address file KM/dg