2011, 05-31 Permit App 11001507 Pole BldgProject Number: 11001507 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Project Information:
Permit Use: 24 X 24 POLE BLDG/STORAGE
Setbacks: Front Left: Right: Rear:
Site Information:
Plat Key: 002755 Name: VERA
Parcel Number: 45151.1316
Date: 5/31/2011 Page 1 of 2
Contact: CUMMINGS, SHERRYL A
Address: 13721 E BROADWAY AVE
C - S - Z: SPOKANE VALLEY, WA 99216
Phone: (509) 844-4204
Group Name:
Project Name:
District: Nort
Block:
Lot:
SiteAddress: 13721 E BROADWAY AVE Owner: Name: CUMMINGS, SHERRYL A
Address: 13721 E BROADWAY AVE
Location:: CSV SPOKANE VALLEY, WA 99216
Zoning: R-3 SF Res District
Water District: 010 VERA
Area: 18,400 Sq Ft Width: 0
Nbr of Bldgs: 0 Nbr of Dwellings: 1
Review Information: so -
Hold: ❑
Depth: 0 Right Of Way (ft): 0
Review
Building Plan Review
Released By:
Originally Released: 5/27/2011 By: tmel bou rn
Landuse/Zoning/HE Conditions
Permits:
Released By:
Originally Released: 5/27/2011 By: Ibarlow
Operator: jmm Printed By: JD Print Date: 5/31/2011
Project<Number: 11001507 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Contractor: OWNER
Description Grp kpA
POLE BDLG U-1 VB
Item Description
RESIDENTIAL PERMIT FEE
ACCESSORY PLANS REVIEW
WSBCC SURCHARGE
Building Permit
Date: 5/31/2011
Firm: OWNER
Phone: (000) 000-0000
This Application: Total Project:
Notes Sq Ft Valuation Sq Ft Valuation
PLAN 576 $10,944.00 576 $10,944.00
REVIEW
FEE
Totals: 576 $10,944.00 576 $10,944.00
Units Unit Desc Fee Amount
1 SELECT $195.25
1 SELECT $48.81
1 SELECT $4.50
Permit Total Fees: $248.56
Notes:
This permit is granted based on the identified use of a shop and storage - not a garage for daily use
vehicles. A paved driveway is not required for a shop/storage buidling.
If the structure is used as a garage for the storage of daily use vehicles a paved driveway that has access
to a public street shall be required.
Payment Summary:
Permit Type
Building Permit
Fee Amount Invoice Amount
$248.56 $248.56
$248.56 $248.56
Amount Paid Amount Owing
$48.81 $199.75
$48.81 $199.75
Page 2 of 2
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: jmm Printed By: JD
Print Date: 5/31/2011
COmmunity Development Department
Permit Center
so11703 East Sprague Avenue, Suite B-3
Spokane Valley, WA 99206
ky e Tel: (509) 688-0036
000.ValleY Fax: it en
ka37
permit ente688rspo00nevalleY.orq
RESID IAL CONSTRUCTION PERMIT APPLICATION
g ACCESSORY BUILDING
(Staff Use Only)
PERMIT NUMBER:
PERMIT FEE:
❑ NEW CONSTRUCTION ❑ ADDITION/REMODEL
Ea DECK ❑ OTHER
SITE ADDRESS: /3 72-7
ASSESSORS PARCEL NO.: LEG L DESCRIPTION:
BUILDING OWNER NAME: r- •
NAME: I eI c / , n i m,
ADDRESS:
STATE:
vfY--
CITY: �Q" 1 't
PHONE: S4 17/
FAX:
CONTACT NAME: ��Jt� ( /�'1/�Yl
PHONE: D9r g�Y�`7' �-�/ V FAX:
CONTRACTOR NAME: Z/s5tql �,/ /
.JJlS
MAILING ADDRESS: 170 0 2
CITY: aii14-7/
PHONE: 9—'ZZ_ YO 0 FAX: CELL:
CONTRACTOR LICENSE NO.: O/ZfE(?'L EXP RES:6-- CITY BUSINESS LICENSE NO.:
ZIP: 9'19 U lQ
CELL: JCx-1"77
CELL: �Q
STATE:
ZIP: 9�0�
DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE & PROPOSED USEL
�LI zy dal.- 13/J( S- ,sa Q ��r1c Sho y ( L���,65
� � P
****YOU MUST COMPLETE THE FOLLOWING****
MARK N/A IF NOT APPLICABLE
Height to Pea ,
t Li
Dimensions:
C Z U Li 1
No. of Stories:
(
Total Habitable
Space:
Main FI or SQ FT:
-, 7 %
Upper Floor S FT:
Unfinished Base ent SQ
FT: iN
__(.1-------
Finished BNa�ement SQ
FT: t�'
Garage SQ FT:
^ t, 6y
Deck/Cov re Patio SQ
FT: k }/
Impervious Surf ce
Area: ., r
30% Slopes on
��� Property:
No. of Bedrooms: aV
Construction Type: 4pv4Heat
Source. _.1—"
Sewer or Septic:
TOTAL COST OF PROJECT: $
0.4
DISCLAIMER
The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will
be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property
owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of
Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of
Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional
information may be required to be submitted and subsequently approved before this application can be processed.
Date: 5--27 l/
Updated 1-11-11 Page 1 of 1
http://www.spokanevalley.org/filestorage/124/938/210/948/1496/Building_Permit_-_Residential_11-11-11.doc
RESIDENTIAL CHECK LIST DIRECTIONS:
Place a check mark in box next to each document required for complete submittal.
❑ SITE PLAN
o Property lines and dimensions
o Direction arrow pointing North and orientation to streets
❑ Proposed/existing buildings (footprint and dimensions)
o Utilities, septic tank/drain field locations and distances
o Setbacks to property lines
o Distance between buildings
o Right of way/easement location & sizes
❑ Driveway approach size and location
BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned)
O Elevations (Front/Rear/Sides) with roof peak and wall height including basement:
❑ Foundation Plan (crawlspace, basement or slab on grade):
o Footing sizes and locations
o Perimeter concrete foundation wall sizes
o Crawlspace ventilation
o Supporting wood cripple walls or beams
o Thickened concrete pads supporting
beams or girder trusses
O Floor Plan of each level (finished or unfinished) with dimensions:
o Floor Joist direction, size and spacing
o Header, beam or concrete lintel sizes
o Brace wall panel locations
o Water heater and furnace locations
o Exhaust fan locations
o Deck or concrete patio sizes and locations
❑ Roof Plan:
❑ Engineered truss direction and spacing
o Rafter and over frame direction, size and spacing
❑ Wall Section Detail including:
Roof
o Slope/ roofing material/ underlayment/ ice dam protection
o Sheathing size and type
Ceiling
o Joist size and spacing
Wall
o Height/ top plate/ stud size and spacing/ sole plate
o Exterior sheathing size and type
Floor
o Joist size and spacing
Foundation Wall
o Concrete or Masonry unit width
o Earth to wood separation distance
Footing
o Size
Radon
❑ Passive system with 6mil vapor barrier
Miscellaneous Construction Details
❑ Deck:
o Floor plan/ side view/ dimensions
o Floor Joist/ decking direction, size and spacing
O Stairway tread rise & run and nosing
o Window and door location and sizes
o Window well locations if applicable
❑ Room usage labels
o Smoke detector locations
o Attic and crawl space access locations
o Fire Wall construction
o Ridge, eave and valley lines
o Beam and girder size and location
o Truss or rafter size, spacing & connection
o Attic insulation/ air space baffle/ ventilation
o Size of ceiling gypsum wall board
o Siding/ exterior house wrap/ anchor bolts
o Insulation, vapor barrier, gypsum wall board
o Sheathing or concrete floor size/ insulation
o Footing bottom to finished ground level depth
o Horizontal & vertical reinforcement if any
o Reinforcement if any
o Active system with 6 mil vapor barrier
❑ Footings/ post/ and beam size and locations
❑ Handrail / Guard height & spacing
Spokane
Valley®
For City Use Only
PLUS Project Number // / O')
Project Address //% / E L ram&
11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206
509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org
As part of our on -going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
• Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
> Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure, you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE - APPLICANT PINK - BUILDING FILE REV 9/07
Storage
Building
(No Value
Given)
10.0'
Bed
Room
Red
Room
RECEIVED
CSV PERMIT CENTER
MAY 2 11
Project #
Name
Submittal #
49.0'
Bath
63.0'
Kitchen
Den
10 x 21
Dining
Room
Living
Room
Patio
scAL,_-=
M
Laundry
-1$10'
Closet
Bath
Bed
Room
b ,ex-v Cd n iftig-
)3121 E6t-O4ct
b
1
fi7
_s 8 0 3V01:4901A
APPROVED BY t-e✓'I
Stlikanei�
Community Development
11707 E Sprague Ave Suite 106 ♦ Spokane Valley WA 99206
509.921.1000 • Fax: 509.921.1008 • cityhall@spokanevalley.org
April 29, 2011
Sherryl A. Cummings
13721 E Broadway Ave.
Spokane Valley, WA. 99216
Dear Ms. Cummings:
I have received your letter regarding constructing a pole barn on your property at the above
address. Spokane Valley regulations require all driveways to be paved, however, if you are not
storing vehicles in your new building, no driveway will be required. This will placed as a
condition on your building permit and if conditions change and you or a future owner decide to
put vehicles in the pole barn, you can add the paved driveway at that time.
Please bring this letter with you when you submit your permit so that the staff will know that I
have addressed this issue with you.
Sincerely,
961tZt4, mcCew�..
Kathy McClung
Community Development Director
CC: Address file
KM/dg