2009, 10-21 Permit 09003431 Site Plan, Notice of Intent+C ?1 th
'39 , E LJ AJZ
GAQ , 39 I leow A--,'
(OeYvti `k tel.\ 114 &kg-ff&-a)
—j 1 o tit ..7:veYr gip"
Gmail - County Sewer Disconnect? - 3 Sites Near Evergreen & Broadway
Page 1 of 2
Jay Torgerson <jay.robs@gmail.com>
County Sewer Disconnect? - 3 Sites Near Evergreen &
Broadway
4 messages
Jay Torgerson <jay.robs@gmail.com> Mon, Jun 29, 2009 at 2:16 PM
To: Roger Rivers <rrivers@spokanecounty.org>
Hi Roger,
We're planning to do a demolition job near the southeast corner of Broadway & Evergreen -- more specifically
at:
13904 E Broadway Ave -- 45143.1426
13916 E Broadway Ave -- 45143.1427
710 N Evergreen aka 13901 E Springfield — 45143.1423
Do we need to get sewer disconnect permits from the County for this job?
Thank you,
Jay Torgerson
Rob's Demolition
509-534-2970 phone
509-534-9404 fax
Rivers, Roger <RRivers@spokanecounty.org> Tue, Jun 30, 2009 at 3:45 PM
To: Jay Torgerson <jay.robs@gmail.com>
Cc: Permit Center<permitcenter@spokanevalley.org>, "York, Louis" <LYork@spokanecounty.org>, "White,
David" <DWHITE@spokanecounty.org>, "Urhausen, Billy" <BUrhausen@spokanecounty.org>
Jay,
As per our records, none of the subject properties are connected to the Spokane County Sewer System.
Therefore, a sewer abandonment permit and inspection by the Spokane County Division of Utilities IS NOT
REQUIRED.
Roger Rivers
Customer Service Representative, Spokane County Division of Utilities
PS: F.Y.I. I will be on vacation from July 7th thru July 13th.
Roger
From: Jay Torgerson [mailto:iay.robs@gmail.com]
Sent: Monday, June 29, 2009 2:17 PM
To: Rivers, Roger
Subject: County Sewer Disconnect? - 3 Sites Near Evergreen & Broadway
tQuoted text hidden)
Jay Torgerson <jay.robs@gmail.com> Tue, Jun 30, 2009 at 3:55 PM
http://mail.google.com/mail/?ui=2&ik=b301101 e97&view=pt&search=inbox&th=1222de... 6/30/2009
Oct 12 2009 10:53AM PHALON ABATEMENT
6LOc t. 7, `7009 al., 46rya M
SPOKANE CLEAN, AIR,,„,
509-928-8785
509-928-8'No. 1543 P.
p.1
P - 1
Notice of Intent No. SpokaneIti )� L 7, (I j '
a .� ` 1111: a`-I:I tilflt l'1:4).111 \,.11 •,Ills 14 if 1. ��I ��`tt�o++
_ . ' can C18s7AAiri t
41Refer to the Atteucy's Renovation, Demelttton, sad Asbestos Inform et ' ���'t 7.T '` =L' ' 1' ' chi IX i
r A. Project Type; a
❑ AsbeeRemoval
slit
1 n Asbeet o Removal Demolition
—
❑ Demel{tNrr, No Asbestos Ralaoval
Does thitprojeci irrvolvealire-damaged shucturo7:.
■ Yee IN No
(If yes, refer to Sections 9.03.F.3 sad9.0B)
Does this project involve demolition by the training7: _
■ Yes II No
(See Sections 9.02.R, 9.03.PA A 9A4.A.6.f)
How many contiguous structures doer Ibis project involve? (5
max): 1
(If more than t structure, refer to Section 9.04.A.3)
6. Property Owner:
,Nitl, VAtt1ey Flares
Phone:
l2$ Pax;
Mailing Address:
,d jp „ , 0.a
.� G ' it Z lb
C
7831.
a: ,stale:
A Lip:
't: {
:
C. Site Addrtes;
10 . ' • . Ci : 411P6K0.41e
Stale:
—. tip:
`
ConflictPenoat:
i ICA /ott.4he ISaisf42.7
Job Silo Phvno:CI- ! 1117g
D. IN Asbestos Survey or
D Materte/ Presumed
Date survey performed, 7- 81- oil r, .HERA Bldg. Inspector N'emo:`
!/st,vit. Mc -mom".
War
found?
asbestos
(I Yes 0 No
Company'
Cert. No.:
81 -ela i
Asbestos Remove
lefortnadom:
Start
Date!
lit �"'ODate:
Completion 1
40 "22'0,
AbatcmentBy 1
(ifknownl' Ir{'!t'QIi.D(4 ANYStaTerntear
List indlvldull,� 'Ind
aaantjty of ruiterlIli to be
N N. EV eft&Ike e ^ WA SF fLo1�1R�1raf,1 'at �,gltt 1 Csi,�.ti sly
removed. If>1 sitrusn ae, fist
j _0 . Ma R')NMei — I f O 5F i;' b
material/ for each atrnctune
Total Linear F
Total Square Peat;
410
by address 1001.10114.
Will all asbestos material be removed from the
a 6 project comp' ? A'^�Ze Y pr J p IN Yes Q No
F. Demolition
Infornlaati/nt
r Start Demolition By
Date: �10_ .�I (If known):
(earliest)
1Y,/C76 h''1tSi -al 0 Fl
Mbettoe Prrlsctand Demolition Notification Waiting Period and Non.ReNndable Foe Categories
Your advance 'notification period will begin when a Spmpledg4 NOW, including required porntfundablt feed, is received by SRCAA.
•1'II.IP•1. v111.11111 1a:•t.lu1111::'.ee 116e rtruna:'i,-171 t‘. .\��l<L•� 11111. 1c111/ \1 l,uu1'1.,,�tl
1. ❑ 2 t 0ln ft and/or 2 46 act ft asbestos project not performed by resfd big owner
2. ❑ All Demolition (all asbestos must be property removed and disposed of prior to demolition)
Il.lc, la I1:lutl1 1.1.11111% 11'111.'ur1
3. 0 10.2591n N and/or 48-159 eq ft asbestos
4. 260.999 In ftand/ar t6p-4,999 sq ftalbebloa
5. ❑ 2 1,1)00 6t It and/or 2 5,000 act ft aabertos
Prior Notice
3 Days
11 ;t1U;Y1 1'cl I':11
3 Days
10 Days
10 Days
SO
S30
1,,
S250
S1,250
5250*
s The $.25d demolition fee is waived (%demotfllon is performed in conjunction with aelbseios project Category 3, 4 or 5, above.
Addition) Categories Which May Apply to thlProject Categories in 145, Above
6. ❑ AP Demolition 30 Dgya
I n•, ,.••.,... 1,.Ii,u .tl ,�n
7. ❑ Emergoacy
It11r,.,,1
select eh, reaedn that but describes your situation:
■ SuddOn, vttutcpeCted event that resulted Ina publlo health cr safety hazard.
■ The project tnust proceed Immediately to protect equipment, ensure continuous vital utilities, orminimizes property donee.
• Mbestos-oont.ining 'newish wort cm:vont:nod that were not idcntifed during the eab°stoe survey,
■ The • o' •'t rnu 'roased to avoid I •osin: an utrreasonable tn. oial burden.
1\ .t,1..•. 1', ,, •J
Prior Notice
\. 1;-It..10 i, - .I.. 1
Twi oe the Regular NO
\Ili u,tl 1.1 t. tl . !'11t1t•c 111,11. 1'1.1,111'1>
RrA'1 i'tn P
\\ Ili _ I'.1,.,,! \,.11 Il.'Iu..I.,I 1, 1 eP
Spokane Clean Air. 3104 E. Anguata Avo,, Spokane, WA 99207 / xtvew Spokenectettnair.org / Ph:(509)477-4727 Fax: (509) 477-682j OP/09
Received Time Ocl• 6. 2009 10:26AM No.I506
Oct 12 2009 10:53AM PHALON ABATEMENT
v�Ot t. 7.�2004 _1:46PMjM SPOKANE, CLEAN A1RENT
509-928-8785
509 sze-e,No.�1543 P. 2 P.
p.2
t• ,r l.1i..n 1,,, 11 It rt tluu• 1 .�,1.3Hil:l ,
❑ Exception for Hazardous Conditions
t{rh•t.•i�,c
Section 9.08.0
'4u1-,C,itnr0t10. 1
10 days Regular Fee
Name of person that prepared the Alternate Work Plant
Corr•:.ay helshe rejresents:
Hir4teroortlfied AHERA Project Designer No.:
His/her Codified industrial Hygienist (CIH) number or
Professional Engineer (PE) license number:
t•..I,,:,a,ac \.I,••.t, Itunln.y.
10. ❑ Demolition with Nonfriable Asbestos Roofing
Name ofperconthin determined that nonfiable asbestos
looting neeterid could ba left In place per Stet. 9.08.B:
Company heeche represents:
Niarher certified AHBRA Project Designer No.:
Itchr.rnx'
Section 9.08.8
\\•:ill.,.•• I'. tied '.r-It•:tnq.l,r j,' 1 .'.
10 days Twice the Regular Foe
H, Optional: List addklond patio you would like copies, of this NOI and/or milted nausea sent to pat name do fax number and/or taalHxa Lida'ss):
L Aclounvledgornent
Tho Control OI11 vr, or duly authorized representative, shall be allowed to cocas properly it reasonable rirnt.a toiuspect projects
specific to dog control, rcoovery, or release of contaminants into the atmosphere, in newrdartee with SRCAA Regulation 1, Article 11
and RCW 70.94.200. For the purpo see of renovation, demolition, and asbestos projects, reasonable times Include, but arc not limited
to, any of the following: when renovation demolition, or asbe:slcr removal appear to be occurring or ere scheduled to ocorr, and times
when the Control Ot''cer orduly authorized representative are inveetIgating mir quality complaints filed with agency and/or have
reason to believe that sir quality vtolal Iona have occurred or rrry be occurring. No parson shalt obstruct, hamper or interfere wltb inky
such invective.
1 oertily that the information coniained in this notification and any supplemental information provided is, to the beat of my knowledge
emirate and complete.
Business Nsne t {Aim ik13ATenreei�S Fax: 919 87%5 Phone: R2.51 Sea'Sfa
Melling Address: ?o. T�q'le 8 *.5 Po Keller ex) h i 9q' "L3
Signature: /a�� Print Name: TH rS S s (Oen
J. ,(tansy U.rc Onty.
O NOI Deficient;
NOI Complete )0 /7/69 bf5»
6.%A, initte
Page 2 of 2
Spokane Claatt AIr. 3104 B. Augusta Ave., Spokane, WA 99207 I www,suokancciautair,oig 11'It:(309)477-4727 Fax: (509) 477-6525 09/09
Received Tint Ocl. 6. 2009 10:26AM No. 1506