2010, 04-07 Permit App 10000911 CarportProject Number: 10000911 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Project Information:
Permit Use: 20 X 20 CARPORT
Setbacks: Front
Left: Right: Rear:
Site Information:
Plat Key: 000000 Name: Range
Date: 4/7/2010 Page 1 of 2
Contact: GARBUZ, ANATOLY & NATALYA
Address: 11719 E BROADWAY AVE
C - S - Z: SPOKANE VALLEY, WA 99206
Phone: (509) 928-6303
Group Name:
Project Name:
District: Nort
Parcel Number: 45161.1132 Block: 1
SiteAddress: 11719 E BROADWAY AVE
Location:: CSV
Zoning: UR-3.5 Urban Residential 3.5
Water District:
Area: 17,406 Sq Ft
Nbr of Bldgs: 1
Review Information:
Lot: 4
Owner: Name: GARBUZ, ANATOLY & NATALYA
Address: 11719 E BROADWAY AVE
SPOKANE VALLEY, WA 99206
Hold: ❑
Width: 83 Depth: 207 Right Of Way (ft): 50
Nbr of Dwellings: 1
Review
Building Plan Review
Released By:
Originally Released: 4/7/2010 By: tmelbourn
Landuse/Zoning/HE Conditions
Permits:
Released By:
Originally Released: 4/6/2010 By: tschmidt
Operator: JD Printed By: jmm
Print Date: 4/7/2010
Project Number: 10000911 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Contractor: OWNER
Building Permit
Date: 4/7/2010 Page 2 of 2
Firm: OWNER
Phone: (000) 000-0000
This Application: Total Project:
Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation
POLE BDLG U-1 VB 400 $7,600.00 400 $7,600.00
Item Description
RESIDENTIAL PERMIT FEE
ACCESSORY PLANS REVIEW
WSBCC SURCHARGE
Totals: 400 $7,600.00 400 $7.600.00
Units Unit Desc Fee Amount
1 SELECT $153.25
1 SELECT $38.31
1 SELECT $4.50
Permit Total Fees: $196.06
Issued home occupation Affidavit of Exemption 1/14/2008 - Anatoly Garbuz, "Integrity Construction"
(mjP)
Payment Summary:
Permit Type
Building Permit
Fee Amount Invoice Amount
$196.06 $196.06
Amount Paid
$31.31
Amount Owing
$164.75
$196.06 $196.06 $31.31 $164.75
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: JD Printed By: jmm
Print Date: 4/7/2010
Spokane
Valley.
Community Development
Residential Construction
Permit Application
Permit Center
11703 E Sprague Ave, Suite B-3
Spokane Valley, WA 99206
(509)688-0036 FAX: (509)688-0037
www.spokanevalley.org
PERMIT NUMBER:
PERMIT FEE:
n New Construction >c Accessory Bldg
Addition/Remodel ❑ Deck
n Other:
SITE ADDRESS: I' I 1 1 �' E 13 ;(2. 4-00Y
ASSESSORS PARCEL NO: L/5 /% //3)- LEGAL DESCRIPTION:
A S'toofrotie. Ublie. , LcJ ? yz
Building Owner:
Name: A>76+Or 1 [,'r�vt7
Address:' (r7 1 �i E 8 o
v✓u/ Aye
City: &0kutle. Vq I1.2
S ate: IA M
Zip: 99 ze,
I
Phone: 5cxf - 803.35 5I
Fax:
Contact Person
Name: '4 yl c of ." C-ci c ioci
Phone: 8 3-
Describe the scope of work in detail:
Contractor:
11
Name: 74h01-1v/y 6�bU Z
Address: iiri /e 1 E 87 (l uc y 14Ue
City: dpOlJ4i12. L i ki State: L1/4
Zip: 9-9zc
Phone:6,0
863_35I Fax:
Contractor Lic No: Exp Date:
City Business Lic. No:
Cost of Project: $
Cl; c6(./7.5 54: hdie.s. few ,Ur 41,c 1b /E g r /�
Proposed Use: C r por+ -for S rc G
**************The following MUST be complete: (write N/A if not applicable)**********************
HEIGHT TO PEAK:
/3 f qp'
DIMENSIONS:
020-14 x 2 67 r
# OF STORIES:
TOTAL HABITABL SP
_ �-
/r47
MAIN FLOOR TO SQ.
FTG: 74
2Nu FLOOR SQ. FTG:
/f�
UNFIN BAS MENT SQ. FTG:
/
IMPERVIOUS URFACE
AREA: %�
FINISHED BASE ENT
SQ. FTG: /V
GARAG SQ. FTG:
�� sv
� DECK/CO TIO SQ. FTG:
30% SLOPES ON
%' _ __ /�/C>
# OF BE,R OMS:
C9�A,ST�ZUC ION TYPE:
HEATS E:
` '"'- EPTIC?
The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before
this application can be procesoi.
SIGNATURE:
Method of Payment:
❑ Cash
Bankcard #:
Authorized Signature:
REVISED 2/15/07
❑ Check
❑ Mastercard
Expires:
DATE: L% -3-- /0
❑ VISA
VIN#:
11 0 VAIA.7
4 7- rdt' (,S 77' (
RESIDENTIAL CHECK LIST DIRECTIONS:
Place a check mark in box next to each document required for complete submittal.
❑ SITE PLAN
o Property lines and dimensions
o Direction arrow pointing North and orientation to streets
❑ Proposed/existing buildings (footprint and dimensions)
o Utilities, septic tank/drain field locations and distances
❑ Setbacks to property lines
o Distance between buildings
o Right of way/easement location & sizes
o Driveway approach size and location
BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned)
❑ Elevations (Front/Rear/Sides) with roof peak and wall height including basement:
❑ Foundation Plan (crawlspace, basement or slab on grade):
o Footing sizes and locations
o Perimeter concrete foundation wall sizes
o Crawispace ventilation
o Supporting wood cripple walls or beams
o Thickened concrete pads supporting
beams or girder trusses
❑ Floor Plan of each level (finished or unfinished) with dimensions:
o Floor Joist direction, size and spacing o Window and door location and sizes
❑ Header, beam or concrete lintel sizes o Window well locations if applicable
o Brace wall panel locations o Room usage labels
o Water heater and furnace locations o Smoke detector locations
o Exhaust fan locations o Attic and crawl space access locations
o Deck or concrete patio sizes and locations a Fire Wall construction
❑ Roof Plan:
❑ Engineered truss direction and spacing
o Rafter and over frame direction, size and spacing
❑ Wall Section Detail including:
Roof
o Slope/ roofing material/ underlayment/ ice dam protection
❑ Sheathing size and type
Ceiling
❑ Joist size and spacing
Wall
o Height/ top plate/ stud size and spacing/ sole plate
o Exterior sheathing size and type
Floor
o Joist size and spacing
Foundation Wall
❑ Concrete or Masonry unit width
o Earth to wood separation distance
Footing
o Size
Radon
o Passive system with 6mil vapor barrier
Miscellaneous Construction Details
❑ Deck:
❑ Floor plan/ side view/ dimensions
o Floor Joist/ decking direction, size and spacing
❑ Stairway tread rise & run and nosing
o Ridge, eave and valley lines
❑ Beam and girder size and location
o Truss or rafter size, spacing & connection
o Attic insulation/ air space baffle/ ventilation
o Size of ceiling gypsum wall board
o Siding/ exterior house wrap/ anchor bolts
o Insulation, vapor barrier, gypsum wall board
o Sheathing or concrete floor size/ insulation
o Footing bottom to finished ground level depth
o Horizontal & vertical reinforcement if any
❑ Reinforcement if any
o Active system with 6 mil vapor barrier
o Footings/ post/ and beam size and locations
O Handrail / Guard height & spacing
21' 6 5/8"
20'
20'
19' 6"
5.
6'
4.
000%.„„,
Spmbkane
jUalley
Project
Transmittal
City of Spokane Valley
Community Development
Department
11703 E. Sprague Ave, Suite B3
Spokane Valley, WA 99206
Phone: 509.688.0036
Site Address: 11719 E BROADWAY AVE
Parcel Number: 45161.1132
Zoning: UR-3.5 Water District:
Fire District: FD 01
New project _
Previous pre-app meeting
Plan revisions
Transmittal Date:
Monday, Apri105, 2010
Project Number: 10000911
Applicant: GARBUZ, ANATOLY & NATALYA Owner: GARBUZ. ANATOLY & NATALYA
11719 E BROADWAY AVE 11719 E BROADWAY AVE
SPOKANE VALLEY, WA 99206 SPOKANE VALLEY, WA 99206
(509) 928-6303
e-mail: e-mail:
Contact: GARBUZ, ANATOLY & NATALYA Occupant:
11719 E BROADWAY AVE e-mail:
SPOKANE VALLEY, WA 99206
(509) 928-6303
e-mail:
Contractor: OWNER
( ) - 0
Arch / Engineer:
e-mail:
ECEHE
APR 0 6 2 u
Project Description: 20 X 20 CARPORT
ACM[IL Q'fN
Building
Landuse
Engineer
Utilities
Health
Fire Dist
Assessor
APPLICATIO
SITE PLA
PLAN
s
L
Please send all plan review and project comments via e-mail to the
highlighted individuals.
Spokane
Valley®
For City Use Only
PLUS Project Number
Project Address
11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206
509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org
As part of our on -going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
\\�
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
y Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
i Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven 't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure. you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE -APPLICANT PINK - BUILDING FILE REV 9/07
thf VV\
n 19 E B ro,,(1,Ay Ave.
)pol ne WA 961Z 7
_Grid Size' !7.Y(7ft
8 -r+X ZOO.4-
PLANNING
EPT. APPROVED
i
DATE: y/
Proposed
/rd
Lido ,.
20
N