Loading...
2012, 08-20 Permit SW-12002006 SewerSPOKANE COUNTY BUILDING AN'D PLANNING PERMIT Application Number: SW-12002006 Permit Issued Date: 08/20/2012 Expiration Date: Project Description: SEWER CONNECTION Primary Contact: KALIN EXCAVATION Project Name: VERADALE HEIGHTS Applicant: KALIN EXCAVATION Permit Type: SEWER Address: 9229 E WOOLARD RD COLBERT, WA 99005 Phone: 509-954-9101 Email: SITE INFORMATION: Site Address: Parcel Number: Subdivision: Assessor's Description: Inspection Area: Zoning: 14011 E BROADWAY AVE 45142.9141 14 25 44 5304.5FT OF E75FT OF W150FT OF E316.5FT OF E 1/2 OF W1/2 OF SW1/4 OF NW1/4 EXC N125FT & EXC S2OFT FOR ROAD RNJ Owner: Address: Phone: Email: PEASE, THOMAS W & TERESA L 14011 E BROADWAY AVE SPOKANE, WA 99216-2021 Water District: Vera Fire District: Spokane Valley Fire Irrigation District #15 Land Area: 0.29 Acre(s) CONTRACTOR INFORMATION: General Contractor KALINE*04318 KALIN EXCAVATION 9229 E WOOLARD RD COLBERT, WA 99005 509-954-9101 DETAILS' Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 FEE DETAIL: Processing - Utilities Utilities Permit Total Fee: $125.00 $25.94 $125.00 $150.94 CONDITIONS: CALL 1-800-424-5555 BEFORE YOU DIG —AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30-MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. Date Printed: 08/20/2012 07:54:00 Printed by: IIS APPPOOL ASP.NET v4.0 SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW-12002006 08/20/2012 Expiration Date: INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 08/20/2012 07:54:00 Printed by: IIS APPPOOLV SP.NET v4.0