2012, 06-21 Permit SW-12001598 SewerSPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Application Number: SW-12001598
Permit Issued Date:
06/21/2012
Expiration Date:
Project Description:
Permit Type:
SEWER CONNECTION
SEWER
Primary Contact: LARRY MILLER EXCAVATING
Applicant:
Address:
Phone:
Email:
LARRY MILLER EXCAVATING
7117 E RUTTER AVE
SPOKANE, WA 99212
509-218-3335
SITE INFORMATION:
Site Address:
Parcel Number:
Subdivision:
Assessor's Description
Inspection Area:
Zoning:
14015 E BROADWAY AVE
45142.9242
Owner:
Address:
Phone:
14-25-44 PTN OF SW1/4 OF SW1/4 OF NW1/4 Email:
DAF; BEG AT PT ON S R/W LN OF MALLON AVE &
E LN OF SW1/4 OF SW1/4 OF NW1/4 TH W1
66.50FT TH S120.FT TO TRUE POB TH E66.8FT
TH S5.FT TH W16.8FT T H S33.FT TH E2
LUNA, MAURO/MCDANIEL, LOLA L
14015 E BROADWAY AVE
SPOKANE VALLEY, WA 99216
Water District: Vera Fire District: Spokane Valley Fire
Irrigation District #15
Land Area: 0.33 acres / 14375 sqft
CONTRACTOR INFORMATION:
General Contractor
LARRYME918DR
LARRY MILLER EXCAVATING
7117 E RUTTERAVE
SPOKANE, WA 99212
509-218-3335
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION
FEE DETAIL:
Processing - Utilities
Utilities Permit
1 $125.00 $125.00
Total Fee:
$125.00
$25.94
$125.00
$150.94
CONDITIONS:
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30-MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
Date Printed: 06/21/2012 12:42:51
Printed by: IIS APPPOOLMASP.NET v4.0
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW-12001598 06/21/2012
Expiration Date:
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 06/21/2012 12:42:51
Printed by: IIS APPPOOLWSP.NET v4.0