Loading...
2011, 06-02 Permit App 11001567 RemodelProject Number: 11001567 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: Permit Use: UPDATE BATHROOM, ADD BEDROOM Contact: RODGERS, CHRISTOPHER T & MARC Address: 14215 E BROADWAY AVE C - S - Z: SPOKANE VALLEY, WA 99216 Setbacks: Front Left: Right: Rear: Phone: (509) 838-0245 Group Name: Site Information: Project Name: Date: 6/2/2011 Page 1 of 2 Plat Key: Name: VERADALE HEIGHTS District: East Parcel Number: 45142.1102 Block: SiteAddress: 14215 E BROADWAY AVE Location:: CSV Lot: Owner: Name: RODGERS, CHRISTOPHER T & M Address: 14215 E BROADWAY AVE SPOKANE VALLEY, WA 99216 Zoning: R-4 SF Res Urban District Water District: 010 VERA Hold: ❑ Area: 12,802 Sq Ft Width: 0 Depth: 0 Right Of Way (ft): 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review Information: Review Building Plan Review Permits: Released By: Originally Released: 6/2/2011 By: tmelbourn Contractor: OWNER Building Permit Firm: OWNER Phone: (000) 000-0000 This Application: Total Project: Description Grp 1:1m Notes Sq Ft Valuation Sq Ft Valuation 1&2 FAMILY R-3 VB PLAN 0 $1,700.00 0 $1,700.00 REVIEW FEE Item Description RESIDENTIAL PERMIT FEE WSBCC SURCHARGE SF PLNS RVW < 7999 SQ FT Totals: 0 $1,700.00 0 $1,700.00 Units Unit Desc Fee Amount 1 SELECT $69.25 I SELECT $4.50 1 SELECT $27.70 Permit Total Fees: $101.45 Operator: jmm Printed By: JD Print Date: 6/2/2011 Project Number: 11001567 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Contractor: OWNER Item Description SINKS TUBS WATER PIPING - DWV Notes: Plumbing Permit Date: 6/2/2011 Page 2 of 2 Firm: OWNER Phone: (000) 000-0000 Units Unit Desc 2 NUMBER OF 1 NUMBER OF 2 NUMBER OF Permit Total Fees: Fee Amount $12.00 $6.00 $12.00 $30.00 Payment Summary: Permit Type Building Permit Plumbing Permit Fee Amount Invoice Amount $101.45 $101.45 $30.00 $30.00 Amount Paid Amount Owing $27.70 $73.75 $0.00 $30.00 $131.45 $131.45 $27.70 $103.75 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: jmm Printed By: JD Print Date: 6/2/2011 Spokane jUalley For City Use Op ly PLUS Project Numb/eD � / ri% Project Address // - C 11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206 509.688.0036 • Fax: 509.688.0037 • permitcenter@spokanevalley.org As part of our on -going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is c/b/A The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ▪ Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE -APPLICANT PINK - BUILDING FILE REV 9Jo7 CI`fYdF "j Spokanej it -r ley Pco1 Community Development Department Permit Center 11703 East Sprague Avenue, Suite B-3 Spokane Valley, WA 99206 Tel: (509) 688-0036 Fax: (509) 688-0037 permitcenter@spoka nevalley.oro Lo#2, Blacks i,'eHe P e 3 o Q r, e- C.c)r-i vt-_ Name ;�, CONSTRUCTION ONSTRUCTION PERMIT APPLICATION NEW CONSTRUCTION ADDITIO MOD f] ACCESSORY BUILDING 0 DECK ❑ OTHER (Staff Use Only) PERMIT NUMBER: PERMIT FEE: SITE ADDRESS: f/1 /E _ p c,., ASSESSORS PARCEL NO.: ifs' tit BUILDING OWNER NAME: r: S XJ am V A, STATE: IA/ CITY: �o _ V PHONE: ('jc g3 ° FAX: NVA— NAME: ADDRESS: ty2/5— CONTACT NAME: V GAL DESCRIPTION: CELL: fs,Vol. 1,P,ioc wA- 99,000 ZIP: 99,2 / l2 svc7) 9 ? 7 - '0(.74. PHONE: FAX: CELL: CONTRACTOR NAME: her,.. -,t MAILING ADDRESS: No 11,2_1- CITY: PHONE: FAX: STATE: W ZIP:. CELL: CONTRACTOR LICENSE No.: EXPIRES: CITY BUSINESS LICENSE NO.: DESCRIBE THE SCOPEO1OF WORK IN DETAIL AND INDICATE USE & PROPOSED USE: �/// W rt s"7 rS t i l } Nroo v-•• L n. C. n 0.11-L,' ****YOU MlbST<COM.P-LET-EIHE-EOLLOWING**** �, L �MADI! wl /A TC wi, r wrir�. •r , .. . I Jc4 S Nov G7n Height to Peak: Dimensta i No. of Storie : 1 & A ,b45.241• Total Habitable Space: 3 lC. Mai, Floor SQ FT: , (r�E%U Upper Floor SQ FT: N/A- Unfinished Basement SQ FT: 2..,r 7 Finished Basement SQ FT: v / Z Oc� Garage SQ FT: Deck/Covered PatioQ� FT: 00 � . Impervious Surface 30% Slopes on Area: Dr )vow ay lr i,.,ai isI Property N/A- "".i S VD No. of Bedrooms: if Construction Type: R.¢„r, Heat Source: fi,` j (-S-ewe`'i yr Septic: TOTAL COST OF PROJECT: $ /l 5-00 .. 2 ° DISCLAIMER l� The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit Is for construction or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) ns or additional information may be required to be submitje�i..nd subsequently approved before this application can be processed. / / Signature Date: Updated 1-11-11 Page 1 of 1 http://www. spoka nevalley.org/filestorage/ 124/938/210/948/ 1496/Building_Perm it_ -_Res idential_11-11-11.doc RESIDENTIAL CHECK LIST DIRECTIONS: Place a check mark in box next to each document required for complete submittal. ❑ SITE PLAN ❑ Property lines and dimensions ❑ Direction arrow pointing North and orientation to streets ❑ Proposed/existing buildings (footprint and dimensions) ❑ Utilities, septic tank/drain field locations and distances ❑ Setbacks to property lines ❑ Distance between buildings ❑ Right of way/easement location & sizes ❑ Driveway approach size and location BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned) ❑ Elevations (Front/Rear/Sides) with roof peak and wall height including basement: ❑ Foundation Plan (crawlspace, basement or slab on grade): ❑ Footing sizes and locations ❑ Perimeter concrete foundation wall sizes ❑ Crawlspace ventilation ❑ Supporting wood cripple walls or beams ❑ Thickened concrete pads supporting beams or girder trusses ❑ Floor Plan of each level (finished or unfinished) with dimensions: ❑ Floor Joist direction, size and spacing ❑ Header, beam or concrete lintel sizes ❑ Brace wall panel locations ❑ Water heater and furnace locations ❑ Exhaust fan locations ❑ Deck or concrete patio sizes and locations ❑ Roof Plan: ❑ Engineered truss direction and spacing ❑ Rafter and over frame direction, size and spacing ❑ Wall Section Detail including: Roof ❑ Slope/ roofing material/ underlayment/ ice dam protection ❑ Sheathing size and type Ceiling ❑ Joist size and spacing Wall ❑ Height/ top plate/ stud size and spacing/ sole plate ❑ Exterior sheathing size and type Floor ❑ Joist size and spacing Foundation Wall ❑ Concrete or Masonry unit width ❑ Earth to wood separation distance Footing ❑ Size Radon ❑ Passive system with 6mi1 vapor barrier Miscellaneous Construction Details ❑ Deck: ❑ Floor plan/ side view/ dimensions ❑ Floor Joist/ decking direction, size and spacing ❑ Stairway tread rise & run and nosing ❑ Window and door location and sizes ❑ Window well locations if applicable ❑ Room usage labels ❑ Smoke detector locations ❑ Attic and crawl space access locations ❑ Fire Wall construction ❑ Ridge, eave and valley lines ❑ Beam and girder size and location ❑ Truss or rafter size, spacing & connection ❑ Attic insulation/ air space baffle/ ventilation ❑ Size of ceiling gypsum wall board ❑ Siding/ exterior house wrap/ anchor bolts ❑ Insulation, vapor barrier, gypsum wall board ❑ Sheathing or concrete floor size/ insulation ❑ Footing bottom to finished ground level depth ❑ Horizontal & vertical reinforcement if any ❑ Reinforcement if any ❑ Active system with 6 mil vapor barrier ❑ Footings/ post/ and beam size and locations ❑ Handrail / Guard height & spacing Spokane ®00Valley- Permit Center 11703 E Sprague Ave, Suite B-3 Spokane Valley, WA 99206 (509)688-0036 FAX: (509)688-0037 permitcenter(cr�sp okaneval l ey. org PERMIT NUMBER: PERMIT FEE: Community Development Plumbing Permit Application SITE ADDRESS: J 2/ 5— e- A ❑ Commercial sidential ?2f l Building Owner LI Name: % 1 J� I Phone: ) G."ze < Fax: AIx— Address: / % „2.i `-- ri e. . ad v ct.� Ave_ City: State: �. A_ Zip: V i (f Contractor _ 1 Name: Phone: Fax: Address: City: State: Zip: License No: City Business Lic: Contact/Project Manager: (lXI'S_ Name: C L-/ g Phone: T"?9 — 2 Pe' # OF UNITS PLUMBING FIXTURE ON A TRAP i TOILETS URINALS TUBS I SHOWERS (per trap) SINKS Lav/Basins, Bar, Floor, Kitchen, Laundry, Utility, Janitor, Photo, X-ray, Food, Prep/Culinary Meat 2 DISHWASHER CLOTHES WASHER GARBAGE DISPOSAL WATER SOFTNER FLOOR DRAIN ROOF DRAIN/OVERFLOW DRAINS FOUNTAIN, DRINKING WATER PIPING/DRAIN-IN WASTE WATER USING DEVICE PRIVATE SEWAGE DISPOSAL SYSTEM WATER HEATER INDUSTRIAL WASTE PRETREATEMENT INCEPTORS REPAIR OR ALTERATION ATMOSPHERIC TYPE VACUUM BREAKER BACK FLOW PROTECTIVE DEVICE MEDICAL GAS Area, Case, Coil, Trench, Condensate Installation, Alterations, Repair, Reversals Ice and/or Coffee maker, hose bib, steamer proofer, carbonator, swamp cooler If Gas, See Mechanical Including traps, vents except kitchen type grease interceptors functioning as fixture traps Water piping, drainage or vent piping Other than atmospheric type vacuum breakers INCEPTORS ❑CASH ❑ CHECK ❑ VISA ❑ MC Card# SIGNATURE: EXPIRES: VIN: CURRENT FEES AVAILABLE AT: http://www.spokanevalley.orq/ under the quick links for Forms, Master Fee Schedule. http://www.spokanevalley.org/uploads/Community_Development/Documents/Forms/Building/PlumbingPermitAppl ication040309.doc