2010, 04-07 Permit App10000908 GarageProject Number: 10000908 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Project Information:
Permit Use: 576 SQFT DET GARAGE
Setbacks: Front
Left: Right: Rear:
Site Information:
Plat Key: 002757 Name: VERA
Contact:
Address:
C -S -Z:
Phone:
Group Name:
Project Name:
Date: 4/7/2010 Page 1 of 2
CIOLLI, SEAN
14408 E BROADWAY AVE
SPOKANE, WA 99216-2030
(509) 891-2701
District: East
Parcel Number: 45143.0408
Block:
SiteAddress: 14408 E BROADWAY AVE
Location:: CSV
Zoning: R-3
Water District: 010
Area: 42,445 Sq
Nbr of Bldgs: 1
Review Information:
SF Res District
VERA
Ft Width: 130
Nbr of Dwellings: 1
Lot:
Owner: Name: CIOLLI, SEAN
Address: 14408 E BROADWAY AVE
SPOKANE, WA 99216-2030
Hold: ❑
Depth: 320 Right Of Way (ft): 50
Review
Building Plan Review
Released By:
Originally Released:
Landuse/Zoning/HE Conditions
Permits:
4/7/2010 By: tmelbourn
Released By:
Originally Released:
4/6/2010 By: tschmidt
Operator: JD
Printed By: jnun
Print Date: 4/7/2010
Project Number: 10000908 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for conunencing work without a permit
Building Permit
Date: 4/7/2010 Page 2 of 2
Contractor: OWNER Firm: OWNER
Phone: (000) 000-0000
This Application: Total Project:
Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation
GAR WOOD U-1 VB 576 $10,944.00 576 $10,944.00
Item Description
RESIDENTIAL PERMIT FEE
ACCESSORY PLANS REVIEW
WSBCC SURCHARGE
Notes:
Payment Summary: ---
Permit Type
Building Permit
Totals: 576 $10,944.00 576 $10,944.00
Units Unit Desc Fee Amount
1 SELECT $195.25
1 SELECT $48.81
1 SELECT $4.50
Permit Total Fees: $248.56
Fee Amount Invoice Amount Amount Paid Amount Owing
$248.56 $248.56 $48.81 $199.75
$248.56 $248.56 $48.81 $199.75
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: JD Printed By: jmm
Print Date: 4/7/2010
*lane
Valley.
Community Development
Residential Construction
Permit Application
Permit Center
11703 E Sprague Ave, Suite B-3
Spokane Valley, WA 99206
(509)688-0036 FAX: (509)688-0037
www.spokanevalley.org
PERMIT NUMBER:
PERMIT FEE:
New Construction
❑ Addition/Remodel
n Other:
Accessory Bldg
Deck
SITE ADDRESS: 91-a b ,/
ASSESSORS PARCEL NO: LEGAL DESCRIPTION:
Building Owner:
Name: jowl G r, 11 I
Address: i q 1../0 lb C .
,�,..o{ w-•L.
f
City:
State: •
Zi
Phoney, g6 vi -3 6 50
Fax
Contact Person
Name:Sea, -j 2; 1I ►•
Phone: IS�) �,'(,� -3 5 O
Describe the scope of work in detail:
Contractor:
Ir
Name: „.1Gro(rj
Address: iW 1107- 6.. 13
yi w -^^
City: U�
State: �
Zip:�� Z/ fo
Phone: f 47.) s.,64 _ 3 bso
Fax:
Contractor Lic No:
Exp Date:
City Business Lic. No:
Cost of Project: $ l2_r a52,�
Proposed Use: Ives fcc41 -t-;
**************The following MUST be : (write N/A if not applicable)**********************
complete
HEIGHT TO PEAK:
DIMENSIONSi �2�
# OF STORIES:
TOTAL HAB,ITTABLE SPACE:
MAIN FLOOR TO SQ.
FTG: N
2Nu FLOOR SQ. FTG:
UNFIN BASEMENT SQ. FTG:
/f
IMPERVIOUS SURFACE
AREA:
FINISHED BASEENT
�l
SQ. FTG: N/A
GARAGE SQ. FTG:
C76, — 4 -
DECK/COV. PA�TIO SQ. FTG:
/V(A
30% SLOPES ON
P TY:
# OF BEDROOMS:
"VA
CONSTRUCTION TYPE:
4:-ti c(‹. P-'a 0(2
HEAT SOURCE:
Alf
WER R SEPTIC?
The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is foi
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Perrr
signatory is the property owner or has permission to represent the property owner in this trans
in full compliance with the City of Spokane Valley Development Code. Referenced codes are
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or appn
local laws, codes or ordinances. 6) Plans or additional information may be required to be sub
this application can be processed.
SIGNATURE:
Method of Payment:
❑ Cash
Bankcard #:
Authorized Signature:
REVISED 2/15/07
❑ Check
❑ Mastercard
Expires:
DATE:
❑ VISA
VIN#:
u a o,tV VJ
IptFJueb
he
ione
or
before
CSV PERMIT CENTER
Project
Name
Submittal #_"
RESIDENTIAL CHECK LIST DIRECTIONS:
Place a check mark in box next to each document required for complete submittal.
o SITE PLAN
o Property lines and dimensions
o Direction arrow pointing North and orientation to streets
o Proposed/existing buildings (footprint and dimensions)
o Utilities, septic tank/drain field locations and distances
o Setbacks to property lines
❑ Distance between buildings
❑ Right of way/easement location & sizes
o Driveway approach size and location
BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned)
❑ Elevations (Front/Rear/Sides) with roof peak and wall height including basement:
❑ Foundation Plan (crawlspace, basement or slab on grade):
o Footing sizes and locations
o Perimeter concrete foundation wall sizes
o Crawlspace ventilation
o Supporting wood cripple walls or beams
o Thickened concrete pads supporting
beams or girder trusses
❑ Floor Plan of each level (finished or unfinished) with dimensions:
o Floor Joist direction size and spacing ❑ Window and door location and sizes
o Header, beam or concrete lintel sizes o Window well locations if applicable
o Brace wall panel locations
o Water heater and fumace locations
o Exhaust fan locations
o Deck or concrete patio sizes and locations
❑ Roof Plan:
o Engineered truss direction and spacing
❑ Rafter and over frame direction, size and spacing
❑ Wall Section Detail including:
Roof
❑ Slope/ roofing material/ underlayment/ ice dam protection
o Sheathing size and type
Ceiling
o Joist size and spacing
Wall
❑ Height/ top plate/ stud size and spacing/ sole plate
o Exterior sheathing size and type
Floor
o Joist size and spacing
Foundation Wall
o Concrete or Masonry unit width
o Earth to wood separation distance
Footing
o Size
Radon
❑ Passive system with 6mi1 vapor barrier
Miscellaneous Construction Details
❑•Deck:
o Floor -plan/ side view/ dimensions
o Floor Joist/ decking direction, size and spacing
O Stairway tread rise & run and nosing
o Room usage labels
o Smoke detector locations
o Attic and crawl space access locations
o Fire Wall construction
o Ridge, eave and valley lines
o Beam and girder size and location
o Truss or rafter size, spacing & connection
o Attic insulation/ air space baffle/ ventilation
❑ Size of ceiling gypsum wall board
o Siding/ exterior house wrap/ anchor bolts
❑ Insulation, vapor barrier, gypsum wall board
o Sheathing or concrete floor size/ insulation
o Footing bottom to finished ground level depth
o Horizontal & vertical reinforcement if any
o Reinforcement if any
o Active system with 6 mil vapor barrier
o Footings/ post/ and beam size and locations
O Handrail / Guard height & spacing
Spokane
Valley®
For City Use Only _
PLUS Project Number
Project Address
11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206
509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org
As part of our on -going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
y Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date. please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure. you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE -APPLICANT PINK - BUILDING FILE REV 9/07
g ;ZaAD �?.✓A.�l AN E.
PLANNING DEPT. APPROVED
BY�
DATE: yA/ro
4L'
1
E KISTI wG
RCS t DEepICE
t44o8 f= . ZROAbv# -I ttU
4
es'
_ f 741
PwI) 3sc...m
Gl�i'�A GE
R
574
ZAL
133
36'
EAST i KtC,
1,1zs`E+R/1\--1
27'
9'
7
ex\ s l LG
SA G 25'
fi
48'
ta�
f
11'
130'