2008, 10-02 Permit App 08003907 Add to GarageProject Number: 08003907 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Project Information:
Permit Use: 30 X 24 ADDITION TO EXISTING GARAGE
Setbacks: Front
Left: Right: Rear:
Site Information:
Plat Key: 000000 Name: Range
Date: 10/2/2008 Page 1 of 2
Contact: BORGMANN, JAMES P & BESSIE J
Address: 14806 E BROADWAY AVE
C - S - Z: SPOKANE VALLEY, WA 99216-2038
Phone: (509) 927-8309
Group Name:
Project Name:
District: East
Parcel Number: 45144.0627 Block:
SiteAddress: 14806 E BROADWAY AVE
Location:: CSV
Zoning: R-3 SF Res District
Water District: 010 VERA
Area: 13,500 Sq Ft Width: 0
Nbr of Bldgs: 1 Nbr of Dwellings: 1
Review Information: -
Lot:
Owner: Name: BORGMANN, JAMES P & BESSIE
Address: 14806 E BROADWAY AVE
SPOKANE VALLEY, WA 99216-203
Hold: ❑
Depth: 0 Right Of Way (ft): 0
Review
Building Plan Review
Released By:
Originally Released: 10/2/2008 By: tmelboum
Landuse/Zoning/HE Conditions
Permits:
Released By:
Originally Released: 10/2/2008 By: mharnois
Operator: jmm Printed By: jmm Print Date: 10/2/2008
Project Number: 08003907 Inv: I
Application
I HIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Contractor: OWNER
Description Grp Type Notes
GARAGE U-1 VB
Item Description
RESIDENTIAL PERMIT FEE
WSBC SURCHARGE
SF PLNS RVW < 7999 SQ FT
Notes: -
Building Permit
Date: 10/2/2008
Page 2 of 2
Firm: OWNER
Phone: (000) 000-0000
This Application: Total Project:
Sq Ft Valuation Sq Ft Valuation
720 $13,680.00 720 $13,680.00
Totals: 720 $13,680.00 720 $13,680.00
Units Unit Desc
1 SELECT
1 SELECT
1 SELECT
Permit Total Fees:
Fee Amount
$237.25
$4.50
$94.90
$336.65
NW comer of Progress and Sprague (parent Parcel No. 45144.2145) IS NOT ALLOWED ANY
individual freestanding or monument signs for Tract A-E of BSP-03-04. See project No. 05-001343 for
multi -business complex sign. (4-26-05) KK
Progress Elementary parcels 45144.0317 and 45144.1031 have restrictive environmental covenant
placed upon them. See building address file for copy of Environmental Covenant.
Permit Type
Building Permit
Fee Amount Invoice Amount Amount Paid Amount Owing
$336.65 $336.65 $0.00 $336.65
$336.65 $336.65 $0.00 $336.65
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator. jmm Printed By: jmm
Print Date: 10/2/2008
Permit Center
ar 11703 E Sprague Ave, suite B-3 RECEIVED BY PERWTNUMB ER C v
e Spokane Valley, WA 99206 :'TY OF SPCKANE VALLEJ pEgNgTFEE:
per. (509)688-0036 FAX: (509)688-0037
"J www.sookanevallev.ore OCT Q 2 2000
Community Development
Residential Construction
Permit Application
00-�Le�-COII "ction
R1 A)ddition/Remodel
Other:
❑ Accessory Bldg
❑ Deck
SITE ADDRESS:
DIMENSIONS:
# OF STORIES:
TOTAL HABITABLE SPACE:
ASSESSORS PARCEL NO: �_ Z
1"4J. sen 2-- :�-
LEGAL DESCRIPTION:
2 FLOOR SQ. FTG:
UNFIN BASEMENT SQ. FTG:
IMPERVIOUS SURFACE
City:
Contractor Lic No:
:Contact ,erson City Business Lic. No:
Name: r r:
Phone: k ? —
State: ' Zip:
Fax:
Exp Date:
Describe the scope of work in detail: Cost of Project: s
- Giiir i1 f �%/fes F Re-
3c� xAooeiso, i/ e,e�-sT��-s G�2.1�� h,� «��� �• r��,�i
Proposed Use:—
a
**************The following MUST be complete: (write N/A if not applicable)**********************
HEIGHT TO PEAK:
DIMENSIONS:
# OF STORIES:
TOTAL HABITABLE SPACE:
MAIN FLOOR TO SQ.
2 FLOOR SQ. FTG:
UNFIN BASEMENT SQ. FTG:
IMPERVIOUS SURFACE
FTG:
AREA: A/
I
FINISHED BASEMENT
GARAGE $0. FTG:.QaaeT
AECKJCOV. PATIO SQ. FTG:
30% SLOPES ON
SQ. FTG Al"If—
ao
�
PROPERTY: "ate
# OF BEDROOMS:
CONSTRUCTION TYPE:
HEAT SOURCE:^n`
SEWER OR SEPTIC?
I
The permitee verges, acknowledges and agrees by their signature that 1) If this permit is for construction of or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. 6) Plans or addfional information may be required to be submitted, and subsequently approved before
this application can 4 be processed.
SIGNATURE: DATE:
Method of Payment
❑ Cash ❑ Check
Bankcard #.
Authorized Signature:
REVISED M5/07
❑ Mastercard ❑ VISA
Expires: VIN#:
Sj�kiiii
For City Use Only
PLUS Project Number •
Project Address ;
11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206
509.688.0036 • Fax: 509.688.0037 • permitcenter®spokanevalley.org
As part of our on -going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
➢ Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
i Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure, you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE -APPLICANT PINK -BUILDING FILE REV 9/07
BUILDING MATERIALS
717,
, - V
G
w
.0
a
M1
PLANNING DEPT. APPROVED
The DECK of a Lifetime..'
1
E. 6206 Trent Avenue, Spokane • 509-535-4681 • FAX: 509-535-5206 • Email: spokane_sales@bmcwest.com