2011, 06-21 Permit App 11001775 ShopProject Number: 11001775 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Project Information:
Permit Use: 25 X 30 PERSONAL STORAGE SHOP Contact: BLACK BEAR STORAGE TRUST
Address: 14913 E BROADWAY AVE
C - S - Z: SPOKANE, WA 99216
Setbacks: Front Phone: (509) 535-4520
Group Name:
Project Name:
Date: 6/21/2011 Page 1 of 2
Left: Right: Rear:
Site Information:
Plat Key: 999999 Name: Range
District: East
Parcel Number: 45141.9010 Block:
SiteAddress: 15005 E BROADWAY AVE
Location:: CSV
Zoning: R-3 SF Res District
Water District: 010 VERA
Lot:
Owner: Name: BLACK BEAR STORAGE TRUST
Address: 14913 E BROADWAY AVE
SPOKANE, WA 99216
Hold: E
Area: .63 Acres Width: 98 Depth: 320 Right Of Way (ft): 60
Nbr of Bldgs: 1 Nbr of Dwellings: 1
Review Information:
Review
Building Plan Review
Released By:
Originally Released: 6/21/2011 By: tmelbourn
Landuse/Zoning/HE Conditions
rReleasedBy:
Originally Released: 6/21/2011 By: tschmidt
Operator: JD Printed By: JD Print Date: 6/21/2011
Project Number: 11001775 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Contractor: OWNER
Description Grp Type Notes
GAR WOOD U-1 VB
Item Description
RESIDENTIAL PERMIT FEE
ACCESSORY PLANS REVIEW
WSBCC SURCHARGE
Building Permit
Firm: OWNER
Phone: (000)
This Application:
Sq Ft Valuation
750 $14,250.00
Totals: 750 $14,250.00
Units Unit Desc
1 SELECT
1 SELECT
1 SELECT
Permit Total Fees:
Date: 6/21/2011
Page 2 of 2
000-0000
Total Project:
Sci Ft Valuation
750 $14,250.00
750 $14,250.00
Fee Amount
$251.25
$62.81
$4.50
$318.56
Notes: --
PURSUANT TO SVMC 19.40.020(B) "ALL RESIDENTIAL DRIVEWAYS AND OFF-STREET
PARKING AREAS SHALL BE PAVED WITH ASPHALT, PORTLAND CEMENT, GRASSCRETE,
PAVE BLOCKS OR OTHER EQUIVALENT HARD SURFACE MATERIAL."
BUILDING IS TO BE USED FOR PERSONAL STORAGE. NOT APPROVED FOR
COMMERCIAL BUSINESS.
Payment Summary:
Permit Type
Building Permit
Fee Amount Invoice Amount Amount Paid Amount Owing
$318.56 $318.56
$318.56 $318.56
$62.81 $255.75
$62.81 8255.75
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: JD Printed By: JD
Print Date: 6/21/2011
Sc`okane
Valley
Community Development Department
Permit Center
11703 East Sprague Avenue, Suite B-3
Spokane Valley, WA 99206
Tel: (509) 688-0036
Fax: (509) 688-0037
perm itcenter(a>spoka neva I ley. orci
(Staff Use Only)
PERMIT NUMBER:
PERMIT FEE:
RESIDENTIAL CONSTRUCTION PERMIT APPLICATION
❑ NEW CONSTRUCTION
❑ DECK
ADDITION/REMODEL ❑ ACCESSORY BUILDING
❑ OTHER
SITE ADDRESS: /S'0d..r �_. �j AtlipAy'
ASSESSORS PARCEL NO.: LEGAL DESCRIPTION:
BUILDING OWNER NAME:
NAME: P -Acit Pc_ f N.S- / 1�E8Js
ADDRESS: 1 5ao5 L. Ek Ci',F` �`� tl�rlf / r• �' V x 73 G' V' t AD L ,
1/ v / Y I /! 1 /- �1
CITY: V {J$ �—!C� STATE: J J S I(� ZIP: (1 d 7
PHONE:
CONTACT NAME:
PHONE:
CONTRACTOR NAME: ri AV/
MAILING ADDRESS:
CITY:
PHONE:
FAX: CELL:
Fax:
STATE:
RECE7.77
CELL: - --MI F CENTER
JUN 1CCM:,:•
fProject # I I S
1 1famc
jSubmittal #. ZI
FAX: CELL:
CONTRACTOR LICENSE No.:
EXPIRES: CITY BUSINESS LICENSE NO.:
DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE & PROPOSED USE:
['Ggs'ip N" i t_ fp_Qs eNa l_ USv
****YOU MUST COMPLETE THE FOLLOWING****
MARK N/A IF NOT APPLICABLE
Height to Peak: /
Dimensions,/ /
aU X30
No. of Stories:
Total Habitable
Space:
Main Floor SQFT:
75 ® 5 FT
Upper Flogr SQ FT:
%ii
Unfinished B ement SQ
FT: Ai/Pi
FinishepAement SQ
FT:
30% Slopes on
Property:
Garage SQ FT: ti
o (L
Deck/Covered Patio SQ
FT: f, //,�
I1� r'1'
Impervious Surface
Area:
No. of Bedrooms: N/
Construction Type:
Heat Source: C2 (Sew or Septic:
TOTAL COST OF PROJECT: $ ,j 'cm')
DISCLAIMER
The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will
be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property
owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of
Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of
Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional
information may be required to be submitted and subsequently approved before this application can be processed.
Updated 1-11-11 Page 1 of 1
http://www.spokaneva lley.org/fi lestorage/124/938/210/948/1496/Bu i ld i ng_Permit_-_Residentia l_11-11-11.doc
RESIDENTIAL CHECK LIST DIRECTIONS:
Place a check mark in box next to each document required for complete submittal.
o SITE PLAN
o Property lines and dimensions
o Direction arrow pointing North and orientation to streets
o Proposed/existing buildings (footprint and dimensions)
o Utilities, septic tank/drain field locations and distances
o Setbacks to property lines
o Distance between buildings
❑ Right of way/easement location & sizes
o Driveway approach size and location
BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned)
❑ Elevations (Front/Rear/Sides) with roof peak and wall height including basement:
❑ Foundation Plan (crawlspace, basement or slab on grade).
o Footing sizes and locations
o Perimeter concrete foundation wall sizes
o Craw!space ventilation
o Supporting wood cripple walls or beams
o Thickened concrete pads supporting
beams or girder trusses
❑ Floor Plan of each level (finished or unfinished) with dimensions:
o Floor Joist direction, size and spacing
o Header, beam or concrete lintel sizes
o Brace wall panel locations
o Water heater and furnace locations
o Exhaust fan locations
o Deck or concrete patio sizes and locations
❑ Roof Plan:
o Engineered truss direction and spacing
o Rafter and over frame direction, size and spacing
❑ Wall Section Detail including:
Roof
o Slope/ roofing material/ underlayment/ ice dam protection
o Sheathing size and type
Ceiling
o Joist size and spacing
Wall
❑ Height/ top plate/ stud size and spacing/ sole plate
o Exterior sheathing size and type
Floor
o Joist size and spacing
Foundation Wall
❑ Concrete or Masonry unit width
❑ Earth to wood separation distance
Footing
o Size
Radon
o Passive system with 6mil vapor barrier
Miscellaneous Construction Details
❑ Deck:
o Floor plan/ side view/ dimensions
o Floor Joist/ decking direction, size and spacing
❑ Stairway tread rise & run and nosing
o Window and door location and sizes
o Window well locations if applicable
o Room usage labels
o Smoke detector locations
o Attic and crawl space access locations
o Fire Wall construction
o Ridge, eave and valley lines
o Beam and girder size and location
o Truss or rafter size, spacing & connection
o Attic insulation/ air space baffle/ ventilation
o Size of ceiling gypsum wall board
o Siding/ exterior house wrap/ anchor bolts
o Insulation, vapor barrier, gypsum wall board
o Sheathing or concrete floor size/ insulation
❑ Footing bottom to finished ground level depth
o Horizontal & vertical reinforcement if any
o Reinforcement if any
o Active system with 6 mil vapor barrier
o Footings/ post/ and beam size and locations
O Handrail / Guard height & spacing
Spokane
`� Ualley
For City Us Only
PLUS Project Number
Project Address
11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206
509-688.0036 • Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org
As part of our on -going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
- Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure, you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE -APPLICANT PINK - BUILDING FILE
REV 9/07
PLANNING DEPT. APPROVED
_=TE: (-0I3(1/11
Pursuant to SVMC 19.40.020(B)"AII residential
driveways and off-street parking areas shall be
paved with asphalt. Portland cement. grasscrete
paver blocks or other equivalent hard surface
material.
J2.0 Fro Lo,et- y
5g'
Project #_
Name
Submittal #
RECEIVED
CSV PERMIT CENTER
JUN 16 2011
4'