2013, 05-16 Permit SW-13000729 SewerSPOKANE COUNTY UTILITIES PERMIT Application Number: SW-13000729 Permit Issued Date: 05/16/2013 Expiration Date: 05/16/2014 Project Description: Project Name: Primary Contact: Phone: SEWER CONNECTION WHITE BIRCH LARRY MILLER EXCAVATING 509-218-3335 Applicant: Address: Phone: Email: LARRY MILLER EXCAVATING 7117 E RUTTER AVE SPOKANE, WA 99212 509-218-3335 SITE INFORMATION: Site Address: Parcel Number: 16806 E BROADWAY AVE 45134.0215 Owner: Address: Phone: Assessor's Description: 13-25-44: VERA PTN OF W160FT OF E1/2 OF BLK Email: 2 DAF: BEG AT NW COR TH E120.01FT TH S136.50FT TH W26.17FT TH S33.68FT TH W93.24FT TH N170.15FT TO POB EXC RD; ALSO EXC THE NLY 10 FT THEREOF. Inspection Area: : (509)-477-3675 Water District: Vera Irrigation District #15 Zoning: ANDERSON, JON M & JUDY A PO BOX 335 PRIEST RIVER, ID 83856-0335 Fire District: Spokane Valley Fire Land Area: 19537 Square Feet CONTRACTOR INFORMATION: LARRYME918DR, Exp. 03/19/2015 LARRY MILLER EXCAVATING 7117 E RUTTER AVE SPOKANE, WA 99212 509-218-3335 DETAILS: Class SEWER Type Quantity Unit Charge Value FEE DETAIL: Processing - Utilities Utilities Permit SEWER CONNECTION Total Fee: $26.32 $125.00 $151.32 1 $125.00 $125.00 $125.00 CONDITIONS: Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. Inside Public Transit Benefit Area CALL 1-800-424-5555 BEFORE YOU DIG —AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30-MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. Date Printed: 05/16/2013 11:17:22 Project Coordinator: Kathy Cummings SPOKANE COUNTY UTILITIES PERMIT Application Number: SW-13000729 Permit Issued Date: 05/16/2013 Expiration Date: 05/16/2014 INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 05/16/2013 11:17:22 Project Coordinator: Kathy Cummings