Loading...
2013, 01-04 Permit SW-13000002 SewerSPOKANE COUNTY BUILDING AND PLANNING PERMIT Application Number: SW-13000002 Permit Issued Date: 01/04/2013 Expiration Date: 01/05/2013 Project Description: Project Name: Permit Type: SEWER CONNECTION WHITE BIRCH SEWER Primary Contact Applicant: Address: Phone: Email: STOLZ INCORPORATED STOLZ INCORPORATED 3808 S CHAPMAN RD GREENACRES, WA 99016 509-928-8621 SITE INFORMATION: Site Address: Parcel Number: 45131.0227 16823 E BROADWAY AVE Subdivision: Assessors Description: VERA E230FT OF TRACT 131 EXC S180FT OF W100FT THEREOF & EXC BROADWAY AVE Inspection Area: Water District: Vera Irrigation District#15 Zoning: Owner: Address: Phone: Email: ANDERSON, AMBER LYNN 4810 E 37TH AVE SPOKANE, WA 99223-5066 Fire District: Spokane Valley Fire Land Area: 52000 Square Feet CONTRACTOR INFORMATION: General Contractor STOLZI*053N8 STOLZ INCORPORATED 3808 S CHAPMAN RD GREENACRES, WA 99016 509-928-8621 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION FEE DETAIL' Processing - Utilities Utilities Permit 1 $125.00 $125.00 Total Fee: $125.00 $26.32 $125.00 $151.32 CONDITIONS: Inside Public Transit Benefit Area Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. CALL 1-800-424-5555 BEFORE YOU DIG —AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. Date Printed: 01/04/2013 09:12:52 Printed by: IIS APPPOOL\SmartGovProdApp SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW-13000002 01/04/2013 Expiration Date: 01/05/2013 FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30-MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 01/04/2013 09:12:52 Printed by: IIS APPPOOL\SmartGovProdApp