Loading...
2013, 07-05 Permit SW-13001149 SewerSPOKANE COUNTY UTILITIES PERMIT Application Number: SW-13001149 Permit Issued Date: 07/05/2013 Expiration Date: 07/05/2014 Project Description: SEWER CONNECTION Project Name: WHITE BIRCH Primary Contact: GOBER'S LLC Applicant: GOBER'S LLC Phone: 509-924-5372 Address: 11215 E TRENT AVE SPOKANE, WA 99206 Phone: 509-924-5372 Email: SITE INFORMATION: Site Address: 16924 E BROADWAY AVE Owner. NICHOLS, MAXINE Parcel Number: 45134.1803 Address: 16924 E BROADWAY AVE VERADALE, WA 99037-8512 Assessor's Description: FLORA ACRES SUB VERA L3 B1 Inspection Area: : (509)-477-3675 Phone: Email: Water District: Vera Irrigation District #15 Fire District: Spokane Valley Fire Zoning: Land Area: 40055 Square Feet CONTRACTOR INFORMATION: GOBERL*899L7, Exp. 06/27/2015 GOBER'S LLC 11215 E TRENT AVE SPOKANE, WA 99206 509-924-5372 DETAILS: Class SEWER Type Quantity Unit Charge Value FEE DETAIL: Processing - Utilities Utilities Permit SEWER CONNECTION Total Fee: $26.32 $125.00 $151.32 1 $125.00 $125.00 $125.00 CONDITIONS: Inside Public Transit Benefit Area Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. CALL 1-800-424-5555 BEFORE YOU DIG —AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FORA 30-MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. Date Printed: 07/05/2013 08:08:22 Project Coordinator: Kathy Cummings SPOKANE COUNTY UTILITIES PERMIT Application Number: SW-13001149 Permit Issued Date: 07/05/2013 Expiration Date: 07/05/2014 SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY NAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 07/05/2013 08:08:22 Project Coordinator: Kathy Cummings