2012, 08-13 Permit SW-12001966 SewerSPOKANE COUNTY,BUIL's)ING AND PLANNING
PERMIT
Application Number: SW-12001966
Permit Issued Date:
08/13/2012
Expiration Date: 08/14/2012
Project Description: SEWER CONNECTION
Project Name: GREEN HAVEN
Permit Type: SEWER
Primary Contact: POUL CONSTRUCTION
Applicant: POUL CONSTRUCTION
Address: 18902 E 2ND AVE
SPOKANE VALLEY, WA 99027
Phone: 509-979-5872
Email:
SITE INFORMATION:
Site Address: 17216 E BROADWAY AVE
Parcel Number: 55183.1101
Subdivision: CORBIN ADDITION
Assessor's Description: PT OF B16 CORBIN ADD TO GREENACRES ALKI
SUBDIVISION L1 B 1
Inspection Area:
Water District:
Consolidated Irrigation
District #19
Zoning: Land Area: 23540 Square Feet
Owner: EDGERLY, DANIEL F
Address: PO BOX 163
GREENACRES, WA 99016-0163
Phone:
Email:
Fire District: Spokane Valley Fire
CONTRACTOR INFORMATION:
General Contractor
POULCC*932BQ
POUL CONSTRUCTION
18902 E 2ND AVE
SPOKANE VALLEY, WA 99027
509-979-5872
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION 1 $125.00 $125.00
FEE DETAIL:
Processing - Utilities
Utilities Permit
Total Fee:
$125.00
$25.94
$125.00
$150.94
CONDITIONS:
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
Inside Public Transit Benefit Area
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
Date Printed: 08/13/2012 14:47:54
Printed by: IIS APPPOOL\ASP.NET v4.0
SPOKANE COUNT`rBU4DING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW-12001966 08/13/2012
Expiration Date: 08/14/2012
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30-MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.