2012, 09-14 Permit SW-12002212 SewerSPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Application Number: SW-12002212
Permit Issued Date:
09/14/2012
Expiration Date:
Project Description: SEWER CONNECTION
Project Name: GREEN HAVEN PH 3
Permit Type: SEWER
Primary Contact: BOUCHER CONSTRUCTION LLC
Applicant: BOUCHER CONSTRUCTION LLC
Address: 10 N HARMONY RD
GREENACRES, WA 99016
Phone: 509-953-3274
Email:
SITE INFORMATION:
Site Address: 17405 E BROADWAY AVE
Parcel Number: 55182.4801
Subdivision: SP-221-83
Assessor's Description: TR A OF SP 83-221, AUD #9204100127 BEING A
PTN OF BACONS ADD TO GREENACRES
LOCATED IN THE NW1/4
Inspection Area:
Water District:
Consolidated Irrigation
District #19
Zoning: Land Area: 0.36 Acre(s)
Owner: GERLACH, KERRY D
Address: 17405 E BROADWAY AVE
GREENACRES, WA 99016-9380
Phone:
Email:
Fire District: Spokane Valley Fire
CONTRACTOR INFORMATION:
General Contractor
BOUCHC*954P5
BOUCHER CONSTRUCTION LLC
10 N HARMONY RD
GREENACRES, WA 99016
509-953-3274
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION 1 $125.00 $125.00
FEE DETAIL'
Processing - Utilities
Utilities Permit
Total Fee:
$125.00
$25.94
$125.00
$150.94
CONDITIONS:
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
Inside Public Transit Benefit Area
Date Printed: 09/14/2012 10:53:14
Printed by: IIS APPPOOLIASP.NET v4,0
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW-12002212 09/14/2012
Expiration Date:
CALL 1-800-424-5555 BEFORE YOU DIG —AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30-MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 09/14/2012 10:53:14
Printed by: IIS APPPOOLWSP.NET v4.0