2013, 02-15 Permit SW-13000083 SewerSPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Application Number: SW-13000083
Permit Issued Date:
02/15/2013
Expiration Date:
Project Description:
Project Name:
Permit Type:
SEWER CONNECTION
GREEN HAVEN PH 3
SEWER
Primary Contact: POOL CONSTRUCTION
Applicant POUL CONSTRUCTION
Address:
Phone:
Email:
18902 E 2ND AVE
SPOKANE VALLEY, WA 99027
509-979-5872
SITE INFORMATION:
Site Address:
Parcel Number:
Subdivision:
Assessor's Description:
Inspection Area:
Zoning:
17810 E BROADWAY AVE
55183.1011
CORBIN ADDITION
GREENHAVEN SUB L11 B1
Water District:
Consolidated Irrigation
District #19
Owner:
Address: 17810 E BROADWAY AVE
GREENACRES, WA 99016-9382
Phone:
Email:
LARSON, NANCY C
Fire District: Spokane Valley Fire
Land Area: 24000 Square Feet
CONTRACTOR INFORMATION:
General Contractor
POULCC*932BQ
POUL CONSTRUCTION
18902 E 2ND AVE
SPOKANE VALLEY, WA 99027
509-979-5872
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION
FEE DETAIL;
Processing - Utilities
Utilities Permit
1 $125.00 $125.00
$125.00
$26.32
$125.00
Total Fee: $151.32
CONDITIONS:
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
Inside Public Transit Benefit Area
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
Date Printed: 02/15/2013 09:28:59
Printed by: IIS APPPOOL\SmartGovProdApp
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW-13000083 02/15/2013
Exoiration Date:
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30-MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 02/15/2013 09:28:59 Printed by: IIS APPPOOL\SmartGovProdApp