2012, 10-11 Permit SW-12002376 SewerSPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Application Number: SW-12002376
Permit Issued Date:
10/11/2012
Expiration Date:
Project Description:
Project Name:
Permit Type:
SEWER CONNECTION
GREEN HAVEN
SEWER
Primary Contac
Applicant:
Address:
Phone:
Email:
TILTON EXCAVATION, LLC
TILTON EXCAVATION, LLC
PO BOX 429
OTIS ORCHARDS, WA 99027
509-226-1269
SITE INFORMATION:
Site Address:
Parcel Number:
Subdivision:
Assessor's Description:
Inspection Area:
Zoning:
18316 E BROADWAY AVE
55184.1602
SP-795-92
TR B, SP92-795, AUD 9305210380; BEING A PTN
OF LTS 1 & 2 BLK 10 CORBIN ADD TO
GREENACRES
Water District:
Consolidated Irrigation
District #19
Owner:
Address:
Phone:
Email:
CARTER, TRACY L
18316 E BROADWAY AVE
GREENACRES, WA 99016
Fire District: Spokane Valley Fire
Land Area: 11890 Square Feet
CONTRACTOR INFORMATION:
General Contractor
TILTOEL937BT
TILTON EXCAVATION, LLC
PO BOX 429
OTIS ORCHARDS, WA 99027
509-226-1269
DETAILS:
Class
Type
Quantity Unit Charge
Value
SEWER SEWER CONNECTION
FEE DETAIL:
Processing - Utilities
Utilities Permit
1 $125.00
$125.00
Total Fee:
$125.00
$25.94
$125.00
$150.94
CONDITIONS:
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
Inside Public Transit Benefit Area
Date Printed: 10/11/2012 12:09:03
Printed by: IIS APPPOOLWSP.NET v4.0
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW-12002376 10/11/2012
Expiration Date:
CALL 1-800-424-5555 BEFORE YOU DIG —AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30-MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 10/11/2012 12:09:03
Printed by: IIS APPPOOL\ASP.NET v4.0