2012, 09-04 Permit SW-12002121 SewerSPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Application Number: SW-12002121
Permit Issued Date:
09/04/2012
Expiration Date:
Project Description:
Project Name:
Permit Type:
SEWER CONNECTION
GREEN HAVEN PH 3
SEWER
Primary Contac
Applicant:
Address:
Phone:
Email:
TILTON EXCAVATION, LLC
TILTON EXCAVATION, LLC
PO BOX 429
OTIS ORCHARDS, WA 99027
509-226-1269
SITE INFORMATION:
Site Address:
Parcel Number:
Subdivision:
Assessor's Description:
Inspection Area:
Zoning:
18421 E BROADWAY AVE
55181.3352
CORBIN ADDITION
PLAT A OF GREENACRES IRR DIST; PTN TR 57
LYG SWLY OF COUNTY RD SURVEY OF SR 90
RJW EXC VALLEY VIEW ADD AND EXC RD
Water District:
Consolidated Irrigation
District #19
Owner:
Address:
Phone:
Email:
RIVER VALLEY INVESTMENTS, LLC
PO BOX 332
OTIS ORCHARDS, WA 99027
Fire District: Spokane Valley Fire
Land Area: 11250 Square Feet
CONTRACTOR INFORMATION:
General Contractor
TILTOEL937BT
TILTON EXCAVATION LLC
20000 E BUCKEYE LANE
OTIS ORCHARDS, WA 99027
509-990-5130
DETAILS:
Class
Type
Quantity Unit Charge
Value
SEWER SEWER CONNECTION
FEE DETAIL:
Processing - Utilities
Utilities Permit
1 $125.00
$125.00
Total Fee:
$125.00
$25.94
$125.00
$150.94
CONDITIONS:
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
Inside Public Transit Benefit Area
Date Printed: 09/04/2012 09:43:52
Printed by: IIS APPPOOLASP.NET v4.0
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW-12002121 09/04/2012
Expiration Date:
CALL 1-800-424-5555 BEFORE YOU DIG —AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30-MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 09/04/2012 09:43:52
Printed by: IIS APPPOOL ASP.NET v4.0