2014, 06-27 Permit SW-14000955 SewerSPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW-14000955
Permit Issued Date: 06/27/2014
Expiration Date: 06/27/2015
Project Description:
Project Name:
Primary Contact:
Phone:
SEWER CONNECTION
BROADWAY/BARKER - HODGES
NORM'S EXCAVATING INC
509-928-0580
Applicant: NORM'S EXCAVATING INC
Address:
Phone:
Email: tina@normsexcavating.com
PO BOX 30873
SPOKANE, WA 99223
509-928-0580
SITE INFORMATION:
Site Address:
Parcel Number:
Assessor's Description:
Inspection Area:
Zoning:
18826 E BROADWAY AVE
55173.0516
CORBIN ADD TO GREENACRES TR B OF SP93-
943 AUDITORS #9406160022 BK 11 PG 3 & 4
BEING A PTN OF LT 5 BLK 4 & PTN OF VAC
CANAL RNV
: (509)-477-3675
Owner:
Address:
Phone:
Email:
Water District: Consolidated Irrigation
District #19
PARADOX NO 1, LLC
4821 S BOWDISH
SPOKANE, WA 99206-
Fire District: Spokane Valley Fire
Land Area: 30725 Square Feet
CONTRACTOR INFORMATION:
NORMSEI972BM, Exp. 02/06/2015
NORM'S EXCAVATING INC
PO BOX 30873 SPOKANE, WA 99223
509-928-0580
tina@normsexcavating.com
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION
FEE DETAIL:
Processing - Utilities
Utilities Permit
Total Fee:
$26.64
$125.00
$151.64
1 $125.00 $125.00
$125.00
CONDITIONS:
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
Inside Public Transit Benefit Area
CALL 1-800-424-5555 BEFORE YOU DIG —AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES
DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT
ALLOWS FOR A 30-MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES.
Date Printed: 06/27/2014 07:58:01
Project Coordinator: Kathy Cummings
SPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW-14000955 Permit Issued Date: 06/27/2014
Expiration Date: 06/27/2015
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 06/27/2014 07:58:01 Project Coordinator. Kathy Cummings