Loading...
1983, 08-15 Guide for Determination of Required Fire FlowGUIDE FOR DETERMINATION OF REQUIRED FIRE FLOW NAME_ Jim w18.$E12. FIRE DISTRICT # I ADDRESS f. )32oo E�. )ND/ANA PLAN # V Pi:0Z SS%Sft WAt2f. r+ouS4. Nt;y-r To -T RGUE -4-Mar__ A, A, DETERMINE TYPE OF CONSTRUCTION - CLA CLE ONE): I- II IV FIRE -RESISTIVE NON-COMBUSTIBLE 111= V METAL SWINE: ORDINARY OOD FRAME MIXED NOTE: IF "MIXED", SEE SPECIAL INSTRU TTS FOR AREA AND BASIC FIRE FLOW, B. DETERMINE THE GROUND FLOOR AREA C. DETERMINE THE HEIGHT IN STORIES 5000. —.L D. DETERMINE REQUIRED FIRE FLOW TO THE NEAREST 250 GPM (USE TABLE /2 72,GPM F= m0.9(5000 5- E, DETERMINE THE CREDIT OR SURCHARGE, IF ANY, FOR TYPE OF OCCUPANCY, IF OW HAZARD, SUBTRACT UP TO 25% OF (D)) IF HIGH HAZARD, ADD UP TO 25% OF (D) WAp.rcHONSE /pearr spas Lhwo,AL, CREDIT (SUBTRACT) SURCHARGE (ADD) 0 TOTAL /Z7z F. G. DETERMINE CREDIT IF ANY FOR AUTOMATIC SPRINKLER PROTECTION, CREDIT (SUBTRACT) b TOTAL DETERMINE EXPOSURE ADJUSTMENT; USING THE TABLE AT LEFT AS GUIDE, ENTER THE SEPARATION AND FOR EACH OF THE "FOUR FACES' OF THE BUILDING IN THE TABLE AT SEPARATION MAX ADJUSTMENT 0-10 25% MAX 11-30 20% MAX 31-60 15% MAX 61-100 0% MAX 101-150 5% MAX 151-oR 4-HR WALL 0% MAX /Z7Z. ADJUSTMENT RIGHT: EXPOSURE SEPARATION ACT, ADJUSTMENT NORTH S/6(STQAFT) ADD D EAST 35' ADD /5 SOUTH t5'(FgeEwAY ADD 0 WEST Is' ADD 2O TOTAL % ADJUSTMF T (NOT TO EXCEED /5%): 35 )272)..35=51e!"l.z H. DETERMINE ROOF COVERING ADJUSTMENT; s-r (IF WOOD SHINGLE ROOF COVERING, ADD 500 GPM) ADJUSTMENT: (G) & (H) SURCHARGE (ADD) O jL/5.z TOTAL: i 7/72- ROUND OFF THE FINAL ANSWER TO THE NEAREST 250 GPM IF LESS THAN 2500 GPM AND TO THE NEAREST 500 GPM IF GREATER THAN 2500 GPM, TOTAL REQUIRED FIRE FLOW: I"7 50 cirMATi1Dr - 2/15183 nATF