Loading...
2011, 07-28 Permit App 11002250 2 Story GarageCITY OF Spokane ''Ualleyx RESIDENTIAL CONSTRUCTION PERMIT APPLICATION (Staff Use Only) PERMIT NUMBER: PERMIT FEE: Community Development Department Permit Center 11703 East Sprague Avenue, Suite B-3 Spokane valley, WA 99206 Tel: (509) 688-0036 Fax: (509) 688-0037 0ermitcenter@sookanevallev.orq a NEW CONSTRUCTION El ADDITION/REMODEL ❑ ACCESSORY BUILDING El DECK ❑ OTHER SITE ADDRESS: / 9_� j J ASSESSORS PARCEL NO.: LEGAL DESCRIPTION: BUILDING OWNER NAME: NAME: / Le, / % l 11/'�4 ADDRESS: (J'v STATE: (34)/47 /�j PHONE:(. 7) y') � 02 [� - %d J FAX: CONTACT NAME: PHONE:(4.--e? ) -��6 �j ``� FAX: CONTRACTOR NAME: (?j\\(y.)Y1O. �� q -6**,1-- MAILING ADDRESS: ,e % D 7� CITY: (/z (jj PHONE:(,5— ..-f%df CONTRACTOR LICENSE No.: STATE: FAX: EXPIRES: ZIP: 929.k) 7 CELL: cEL.6.5--vq) 9a ' .9/( 7 zIP: •: 99 e /7 CELL: �5-D 2) c2 yd ' 7` /' / �J CITY BUSINESS LICENSE NO.:' CRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE & PROPOSED USE: Height to Peak: .- {e7 Main Floor FT: ****YOU MUST COMPLETE THE FOLLOWING**** MARK N/A IF NOT APPLICABLE Garage SQ FT: 92 4 Dimens Upper Floor SQ,FT No. of Stories: Unfinished Basement SQ FT: Total Habitable Space: Finished Basement SQ FT: Deck/Covered Patio SQ FT: Impervious Surface Area: 30% Slopes on Property: No. of Bedrooms: Construction Type:,; TOTAL COST OF PROJECT: $ Heat Source:,, r, Sewer or Septic: DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted and subsequently approved before this application can be processed. Signature %� / 9 ���� Date: 7 - 77 // Updated 1-11-11 Page 1 of 1 http://www.spokanevalley.org/filestorage/124/938/210/948/1496/Building_Permit= _Residential_11-11-11.doc RESIDENTIAL CHECK LIST DIRECTIONS: Place a check mark in box next to each document required for complete submittal. o SITE PLAN o Property lines and dimensions o Direction arrow pointing North and orientation to streets o Proposed/existing buildings (footprint and dimensions) o Utilities, septic tank/drain field locations and distances o Setbacks to property lines o Distance between buildings o Right of way/easement location & sizes o Driveway approach size and location BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned) O Elevations (Front/Rear/Sides) with roof peak and wall height including basement: ❑ Foundation Plan (crawlspace, basement or slab on grade): o Footing sizes and locations o Perimeter concrete foundation wall sizes o Crawlspace ventilation o Supporting wood cripple walls or beams o Thickened concrete pads supporting beams or girder trusses O Floor Plan of each level (finished or unfinished) with dimensions: o Floor Joist direction, size and spacing o Header, beam or concrete lintel sizes o Brace wall panel locations o Water heater and furnace locations o Exhaust fan locations o Deck or concrete patio sizes and locations ❑ Roof Plan: o Engineered truss direction and spacing o Rafter and over frame direction, size and spacing ❑ Wall Section Detail including: Roof o Slope/ roofing material/ underlayment/ ice dam protection o Sheathing size and type Ceiling o Joist size and spacing Wall o Height/ top plate/ stud size and spacing/ sole plate o Exterior sheathing size and type Floor o Joist size and spacing Foundation Wall o Concrete or Masonry unit width o Earth to wood separation distance Footing o Size Radon o Passive system with 6mil vapor barrier Miscellaneous Construction Details ❑ Deck: o Floor plan/ side view/ dimensions o Floor Joist/ decking direction, size and spacing 0 Stairway tread rise & run and nosing o Window and door location and sizes o Window well locations if applicable o Room usage labels o Smoke detector locations o Attic and crawl space access locations o Fire Wall construction o Ridge, eave and valley lines o Beam and girder size and location o Truss or rafter size, spacing & connection o Attic insulation/ air space baffle/ ventilation o Size of ceiling gypsum wall board o Siding/ exterior house wrap/ anchor bolts o Insulation, vapor barrier, gypsum wall board o Sheathing or concrete floor size/ insulation o Footing bottom to finished ground level depth o Horizontal & vertical reinforcement if any o Reinforcement if any o Active system with 6 mil vapor barrier ❑ Footings/ post/ and beam size and locations O Handrail / Guard height & spacing Spokane Valley. Permit Center 11703 E Sprague Ave, Suite B-3 Spokane Valley, WA 99206 (509)688-0036 FAX: (509)688-0037 permitcenterr spokaneval lev. ore Community Development Plumbing Permit Application PERMIT NUMBER: PERMIT FEE: n Commercial 7 Residential SITE ADDRESS: 11�--�=� Building Owners/- Name: ✓7-Pax: Phone: J �C. /� /J /�J /� �q r-� Address: /C/. �_)b��T� Cityi �/,2%L"/�^ ,r�r%o State} i4. Zip:YC%CJr % Contractor �C(/,, /; ,.,{- Al cad - Name: / - Phone: Fax: Address: City: State: Zip: License No: City Business Lie: Contact/Project Manager. Ii _t /1 1 Name: Phone: ,-7y4 "J2a6-Sit'?- # OF UNITS PLUMBING FIXTURE ON ATRAP TOILETS URINALS TUBS SHOWERS (per trap) SINKS Lav/Basins, Bar, Floor, Kitchen, Laundry, Utility, Janitor, Photo, X-ray, Food, Prep/Culinary Meat / DISHWASHER CLOTHES WASHER GARBAGE DISPOSAL WATER SOFTNER FLOOR DRAIN Area, Case, Coil, Trench, Condensate ROOF DRAIN/OVERFLOW DRAINS FOUNTAIN, DRINKING WATER PIPING/DRAIN-IN WASTE Installation, Alterations, Repair, Reversals WATER USING DEVICE Ice and/or Coffee maker, hose bib, steamer proofer, carbonator, swamp cooler PRIVATE SEWAGE DISPOSAL SYSTEM WATER HEATER If Gas, See Mechanical INDUSTRIAL WASTE PRETREATEMENT INCEPTORS Including traps, vents except kitchen type grease interceptors functioning as fixture traps REPAIR OR ALTERATION Water piping, drainage or vent piping ATMOSPHERIC TYPE VACUUM BREAKER BACK FLOW PROTECTIVE DEVICE Other than atmospheric type vacuum breakers MEDICAL GAS INCEPTORS ❑CASH ❑ CHECK ❑ VISA ❑ MC Card# SIGNATURE;, i EXPIRES: VIN: P:\Community Development\02 Administration\03 Forms - Official Versions\Permit Center\ Plumbing Permit Application 04-03-09 dg.doc Permit Center *Wane 0.001\11703 E Sprague Ave, Suite B-3 Spokane Valley, WA 99206 .60001.Valler (509)688-0036 FAX: (509)688-0037 Community Development permitcenter@spokanevalley.org Mechanical Permit Application PERNIIT NUMBER: PERMIT FEE: Commercial ,,Residential SITE ADDRESS: . " : (F, /;„A Building Owner, C' �iSI�LL, - m` i Name: 2 „ Address: C/ /,j Contractor Name: Phone: cit — G -(, 44 Phone. ax: State: Fax: Zip: 97'/1 }1� Address: City: State: Zip: License No: Contact/Project Manager: Name: City Business Lic: Phon #UNITS FURNACES & SUSPENDED HEATERS -INSTALLATION OR RELOCATION Up to & including 100,000 BTU i FURNACES & SUSPENDED HEATERS -INSTALLATION OR RELOCATION Over 100,000 BTU DUCT WORK SYSTEM HEAT PUMP/AIR CONDITIONER 0-3 TON AIR CONDITIONER Over 3-15 TON AIR CONDITIONER Over 15-30 TON AIR CONDITIONER Over 30-50 TON AIR CONDITIONER Over 50 TON GAS WATER HEATER ' GAS PIPING SYSTEM (each outlet) GAS LOG, FIREPLACE, & GAS INSERT APPLIANCE VENTS INSTALLATION, RELOCATION, REPLACEMENT REPAIRS OR ADDITIONS BOILER, COMPRESSORS, ABSORPTIONS SYSTEM 0 to 3 hp-100,000 BTU or less BOILER, COMPRESSORS, ABSORPTIONS SYSTEM Over 3 -15 hp —100,001 to 500,000 BTU BOILER, COMPRESSORS, ABSORPTIONS SYSTEM Over 15 — 30 hp - 500,001 to 1,000,000 BTU BOILER, COMPRESSORS, ABSORPTIONS SYSTEM Over 30 hp — 1,000,001 to 1,750,000 BTU Over 50 hp — over 1,750,000 BTU BOILER, COMPRESSORS, ABSORPTIONS SYSTEM AIR HANDLER (DOES NOT include ducting) Each unit up to 10,000 cfm, including ducts AIR HANDLER (DOES NOT include ducting) Each unit over 10,000 cfm EVAPORATIVE COOLERS(other than portables) VENTILATION AND EXHAUST Each fan connected to a singe duct VENTILATION AND EXHAUST Each ventilation system VENTILATION AND EXHAUST Each hood served by mechanical exhaust INCINERATORS Installation or relocation of residential INCINERATORS Installation or relocation of commercial APPLIANCES Range, Clothes Washer UNLISTED APPLIANCES Under 400,000 BTU UNLISTED APPLIANCES Over 400,000 BTU HOOD Type I HOOD Type II L P STORAGE TANK WOOD OR PELLET STOVE INSERT WOOD STOVE SYSTEM — FREE STANDING EXPIRES: ❑CASH ❑ CHECK ❑ VISA ❑ MC CARD #: VIN: hitp://www.spokanevalley.org/uploads/Community—Development/Documents/Forms/Building/MechanicalPermitApplication040309.doc Project Number: 11002250 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: Permit Use: 2 STORY STORAGE GARAGE Setbacks: Front Left: Right: Rear: Site Information: Plat Key: 000000 Name: Range Parcel Number: 55082.0145 Block: SiteAddress: 19312 E BUCKEYE AVE Location:: CSV Date: 7/28/2011 Page 1 of 3 Contact: STALLMAN, VERLA-CHAPPELL, SHAR Address: PO BOX 604 C - S - Z: OTIS ORCHARDS WA 99027 Phone: (509) 226-3788 Group Name: Project Name: District: East Lot: Owner: Name: STALLMAN, VERLA-CHAPPELL, Address: PO BOX 604 OTIS ORCHARDS WA 99027 Zoning: R-4 SF Res Urban District Water District: 134 CONSOLIDATED ID #19 Hold: ❑ Area: 1.58 Acres Width: 0 Nbr of Bldgs: 0 Review Information: Nbr of Dwellings: 0 Depth: 0 Right Of Way (ft): 0 Review Building Plan Review Septic Sys Review Released By: Originally Released: 7/28/2011 By: tmelbourn Released By: Originally Released: 7/28/2011 By: LHALSEY Landuse/Zoning/HE Conditions SEE CONDITION Permits: Released By: Originally Released: 7/28/2011 By: mharnois Operator: JD Printed By: JD Print Date: 7/28/2011 Project Number: 11002250 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 7/28/2011 Page 2 of 3 Building Permit Contractor: HOLLEN CONSTRUCTION INC Firm: HOLLEN CONSTRUCTION INC Address: Po Box 13596 Phone: (509) 922-1596 SPOKANE WA 99213 This Application: Total Project: Description Grp Type Notes So Ft Valuation Sq Ft Valuation GAR WOOD U-1 VB 1,736 $32,984.00 1,736 $32,984.00 Item Description RESIDENTIAL PERMIT FEE ACCESSORY PLANS REVIEW WSBCC SURCHARGE Totals: 1,736 $32,984.00 1,736 $32,984.00 Units Unit Desc Fee Amount 1 SELECT $472.05 1 SELECT $ 118.01 1 SELECT $4.50 Permit Total Fees: Mechanical Permit $594.56 Contractor: HOLLEN CONSTRUCTION INC Firm: HOLLEN CONSTRUCTION INC Address: Po Box 13596 Phone: (509) 922-1596 SPOKANE WA 99213 Item Description GAS WATER HEATER GAS APPLIANCE<=100,000BTU VENTILATING FANS 1 DUCT Units Unit Desc 1 NUMBER OF 1 NUMBER OF 1 NUMBER OF Fee Amount $ 11.00 $13.00 $11.00 Permit Total Fees: $35.00 Plumbing Permit Contractor: HOLLEN CONSTRUCTION INC Firm: HOLLEN CONSTRUCTION INC Address: Po Box 13596 Phone: (509) 922-1596 SPOKANE WA 99213 Item Description TOILETS/BIDETS SINKS Units Unit Desc 1 NUMBER OF 1 NUMBER OF Fee Amount $6.00 $6.00 Permit Total Fees: $12.00 Operator: JD Printed By: JD Print Date: 7/28/2011 Project Number: 11002250 Inv: / Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 7/28/2011 Page 3 of 3 Notes: DRIVEWAY MUST BE PAVED TO GARAGE-MH APPROACH PERMIT MUST BE SUBMITTED AND APPROVED BEFORE RELEASE OF BUILDING PERMIT 11 -1905. OWNERS KNOW OF THIS CONDITION - Payment Summary: Permit Type Building Permit Mechanical Permit Plumbing Permit Fee Amount Invoice Amount $594.56 $35.00 $12.00 $641.56 $594.56 $35.00 $12.00 Amount Paid $130.64 $0.00 $0.00 $641.56 $130.64 Amount Owing $463.92 $35.00 $12.00 $510.92 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: JD Print Date: 7/28/2011 Spokane #Valley® For City Use Only PLUS Project Number Project Address 11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org As part of our on -going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven 't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE -APPLICANT PINK - BUILDING FILE REV 9/07 Project Transmittal City of Spokane Palley Community Development Department 11703 E. Sprague Ave, Suite B3 Spokane Valley, WA 99206 Phone: 509.688.0036 Newprojee ❑ Previous pre-app meeting El Plan revisions Transmittal Date: Thursday, July28, 2011 Site Address: 19312 E BUCKEYE AVE Parcel Number: 55082.0145 Zoning: R-4 Fire District: FD 01 Project Number: 11002250 Water District: CONSOLIDATED ID #19 Applicant: e-mail: Contact: e-mail: Contractor: STALLMAN, VERLA-CHAPPELL, SH PO BOX 604 OTIS ORCHARDS WA 99027 (509) 226-3788 STALLMAN, VERLA-CHAPPELL, SH PO BOX 604 OTIS ORCHARDS WA 99027 (509) 226-3788 HOLLEN CONSTRUCTION INC Po Box 13596 SPOKANE WA 99213 (509) 922-1596 Owner: STALLMAN, VERLA-CHAPPELL, S PO BOX 604 OTIS ORCHARDS WA 99027 e-mail: Occupant: e-mail: Arch / Engineer: e-mail: Project 2 STORY STORAGE GARAGE Description: Building Landuse Engineer Utilities Health Fire Dist Assessor APPLICATION SITE PLAN PLANS Please send all plan review and project comments via e-mail to the highlighted individuals. Target Date sheet sii�i;s*mmmi Valley® For City Use Only PLUS Project Project Address 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.720-5240 ♦ Fax: 509.688.0037 ♦ permitcenter®spokanevalley.org As part of our on -going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven 't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. CD-003 V-7/ 06-21-11 Page 1 of 1 MAKK PtK ItUW BU.DC.UJU k1b) Wfl[7C1 UUL W vVJVUL, Uy LIM aIynu,y vB u uvuv i, u 1 — RID by the resolution method pursuant to Chapte SET REBAR W/YPC MRKD. 'ADAMS ES 731resolution includes the owner(s) property.lf a RID is the petition or resolution method, as provided for ® — FOUND PT. RCW, the owner(s) or successor(s) further agree: (? ments or construction contemplated within the prc ble, (2) that the benefits to be derived from the f, I I TRACT 39 FD. 1/2' I.P. I I ---------- --BUCKEYE---AVENUE - _j L j� N89'53'43"E 61 .70® - — L — — 15.0 ' —39.20'a,— 15.00' N f FD. 3/4" I.P. —124.1 4`—120.00'— 120.00' — — — — ——250.20' — — ® � 10' U11UTY 1 I 25` S.B. N - SET ff4 RB 1 EASEMENT I I o W/YPC MKD. I �, PARCEL "A" PARCEL "B" PARCEL o � YP )S 7317 i � a rrl 1.58 Acres 1.45 Acres 1.27 Acres n I C � N ® ADDRESS: ADDRESS: ADDRESS:II ct ® PARCEL 1 D" I I E. 19312 f E.19324 No E. 19410 I I C 2.08 Acres Cn 9 11:� oo ADDRESS: 0 1 N 4 cn z I I I y r 1 E. 19422 v 1 C Os 00 o f I m m 1Tt Pn o I l m 401 f a z �+ rr+ J 1 I-� 1 m IE� 1 �. I S74'37'54"E VENUE 0) L 37.97' 1 _ 1 Cn 1 � N G�Si � � ��R���p 96 G1 5 I < N CA P b) I 60• I on v? (C '� N NE i !LP 51 a ? r,P 1 �Q�PG� o / P / 113 g� NO' P?G. �°� � � S87004%1 4 V i NE. Mc! °SA GRAPHIC soo o ao goo 5° / ✓ � � IN FEET / 1 Inch = 100 / NOTE- ORDINARY HIGH WATER MARK (OHWM) AS DETERMINED BY RCW 90.58.030( OraiitinsialUE IMAIIIN __... Mr1191111 wii NM MIMI .1 EINEM , hill u�,II IOW 1111111 1111 II.III,iI ■■■■■■■ ■®■■■ ■■■■■� ■...„ 4 r■■■i■ ■ Iii!!!IIII;'riel_l ::::I:PI ,I . 1V ■■■ 1- III I "i!E/I \-'-, , \PIM I 1 , ■■•■al " inn MIN MEM ULU= MI ■■■■■■■■ ■■■�11■�■t ENEINIMI mimmoramix ■■■■i7■■■■■■ ..... i► .■■■■.�'.."____ 1 ..■..® sii■i■■■■■■11111■■■i>i !■■!RI ■��U1�■e IN• 1; I.....ruiuiiu•wui ®�1 NM 11E1•■�e® WM 111111101111.Elli IH!IIEI IIIHR I L undiamomsommumum insimmamin ■■ice■ ®® :A■■Ir�l g II II MEM MEV mit.Nuallas ' =111 ■ Mink gimp 'TEEL EMIR 1111111111111111111 1111IRO aminniffillim Egg • pmme. EMU. Mang ORELM111111 11111111.1rati Armor wilanramorc ,4 1111 MEM FERIIIIIPmmilli ELI 3