2012, 01-30 Permit App 12000191 Add to GarageProject Number: 12000191 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Project Information:
Permit Use: 7 x 24 GARAGE ADDITION
Setbacks: Front
Left: Right: Rear:
Site Information:
Plat Key: 001880 Name: OWENS SUB
Parcel Number: 45152.0303 Block:
SiteAddress: 12808 E MISSION AVE
Location:: CSV
Zoning: R-3 SF Res District
Water District: 011 MODERN
Area: 10,360 Sq Ft
Nbr of Bldgs: 0 Nbr of Dwellings: 0
Review Information:
Review
Building Plan Review
Width: 0
Fmg
Contact: MAIN, JACK & MARIE
Address: 12808 E MISSION AVE
C - S - Z: SPOKANE, WA 99216
Phone: (509) 928-5478
Group Name:
Project Name:
District: Nort
Lot:
Owner: Name: MAIN, JACK & MARIE
Address: 12808 E MISSION AVE
SPOKANE, WA 99216
Hold: ❑
Depth: 0 Right Of Way (ft): 0
Date: 1/30/2012 Page 1 of 2
Released By:
Originally Released: 1/27/2012 By: tmelbourn
Landuse/Zoning/HE Conditions
Permits:
Released By:
Originally Released: 1/27/2012 By: mpalaniuk
Operator: JD Printed By: JD
Print Date: 1/30/2012
Project Number: 12000191 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Contractor: OWNER
Description Grp Tvpe Notes
GAR WOOD U-1 VB
Item Description
RESIDENTIAL PERMIT FEE
ACCESSORY PLANS REVIEW
WSBCC SURCHARGE
Building Permit _—
Firm: OWNER
Phone: (000)
This Application:
Sq Ft Valuation
168 $3,192.00
Totals: 168 $3,192.00
Units Unit Desc
1
1
1
SELECT
SELECT
SELECT
Permit Total Fees:
Date: 1/30/2012
000-0000
Total Project:
Su Ft Valuation
168 $3,192.00
168 $3,192.00
Fee Amount
$97.25
$24.31
$4.50
$126.06
Notes:
Homeowner was in today w/her son. Told me her husband was out of town until next Thursday and
would be in on 1-27-12 to apply permit
Payment Summary:
Permit Type
Building Permit
Fee Amount
$126.06
$126.06
Invoice Amount
$126.06
Amount Paid Amount Owing
$24.31 $101.75
$126.06
$24.31 $101.75
Page 2 of 2
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: JD Printed By: JD Print Date: 1/30/2012
Sp6kane
.0Valley
Community Development Department
Permit Center
11703 East Sprague Avenue, Suite B-3
Spokane Valley, WA 99206
Tel: (509) 688-0036
Fax: (509) 688-0037
permitcenterPsookanevailev.orq
(btart use unly)
PERMIT NUMBER: / Z � / J I
PERMIT FEE:
RESIDENTIAL CONSTRUCTION PERMIT APPLICATION
LI NEW CONSTRUCTION
ER
I ADDITION/REMODEL 0 ACCESSORY BUILDING
0
SITE ADDRESS: j s' C . 1"?,3 3 i a
ASSESSORS PARCEL NO.: LEGAL DESCRIPTION: A C1c 0 ,
BUILDING OWNER NAME: - k FM,,,,
NAME:
�G. C �i21 Y1
ADDRESS: r,a s' e,' a, vi,\''. S , o v
CITY:
PHONE:
STATE: LAD A. ZIP:
FAX: CELL:
CONTACT NAME: Tr, r, pvt ; „1
PHONE: 5 �4— Z3Cm s,
CONTRACTOR NAME: /?)
MAILING ADDRESS:
CITY:
i1L/! 'L
FAX: CELL:
STATE: ZIP: ••.
PHONE:
FAX:
CELL:
CONTRACTOR LICENSE No.:
EXPIRES: CITY BUSINESS LICENSE NO.:
DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE & PROPOSED USE:
****YOU MUST COMPLETE THE FOLLOWING****
A IF NOT APPLICABLE
Height to Peak:
Dimensions:
No. of Stories:
Total Habitable
Space:
Main Floor SQ FT:
Upper Floor SQ FT:
Unfinished Basement SQ
FT:
Finished Basement SQ
FT:
Garage SQ FT:
7 / x I{ J % ,"
/ O
Deck/Covered Patio SQ
FT:
Impervious Surface
Area:
30% Slopes on
Property:
.2
No. of Bedrooms:
Construction Type:
Heat Source:
CSreTtie7or Septic:
TOTAL COST OF PROJECT: $ 4_5"-ac-22
DISCLAIMER
The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will
be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property
owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of
Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of
Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional
information may be required to be submitted and subsequently approved before this application can be processed.
Signature
Date: c;,.,
2171 ,for i
Updated 1-11-11 Page 1 of 1
http://www.spoka neva I ley.org/filestorage/124/938/210/948/1496/Building_Permit_-_Residential_11-11-11.doc
Target Date sheet
SO:Wane~.*Valley®
For City Use Only
PLUS Project
Project Address
11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206
509.720-5240 ♦ Fax: 509.688.0037 ♦ permitcenter®spokanevalley.org
As part of our on -going commitment to customer service during the review process of your project application, we are
providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet
this date, we will contact you with a revised target date.
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is
not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
➢ Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be
several days before they can look at your new or revised information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise
for dealing with reviewer comments would be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven 't heard from us by your
target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will
save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as
indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does
not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from
substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is
complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review.
Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email,
or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the
application are received, a Permit Specialist will process the application and contact the person specified on your application for
permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at
that time.
CD-003 V-7/ 06-21-11 Page 1 of 1
p2_1vc: u1/4-y
1-Luc s e_
PLANNING DEPT. APPROVED
BY:
DATE: / /27 %lz