Loading...
2017, 01-06 Permit ROW-2017-0010 New ConversionSpokane �, jValley® City of Spokane Valley Community & Economic Development 11707 E. Sprague Ave., Suite 108 Spokane Valley, WA 99206 (509) 720-5240 permitcenter@spokanevallev.orq ROW-2017-0010 DE -ROW PROJECT NAME: JOB# 1001465556, LOCATE# 17003264 ISSUED: 01/06/2017 SITE ADDRESS: 11508 E MONTGOMERY DR SPOKANE VALLEY EXPIRES: PROJECT DESCRIPTION: NEW CONVERSION PARCEL: 45094.0514 APPLICANT: AVISTA CORP P 0 BOX 3727 SPOKANE, WA 99220 PRIMARY Botello, Bethany CONTACT: 5094958837 OWNER ACTING AS BUILDER: AVISTA CORP P 0 BOX 3727 SPOKANE, WA 99220 OWNER: BRODMONT, LLC 9006 E MARINGO DR SPOKANE, WA 99212 License: OWNER Expires: FEES: Right of Way Totals : Paid Due $110.00 $110.00 CONDITIONS * * The traffic control plan submitted has been approved for concept only. The Contractor is responsible for determining specific signage and layout as required by the Manual on Uniform Traffic Control Devices (MUTCD), WSDOT specifications and Washington State modifications to the MUTCD. All devices shall conform to the MUTCD and WSDOT specifications. * For all permits that include road obstruction the Contractor shall notify the Spokane Valley Public Information Officer (PIO) at 509.720.5411 within 24 hours of receiving this approval. For any changes to the schedule of the road obstruction the Contractor shall notify the PIO of the change with a minimum of 48 hour notice prior to the road obstruction. The Contractor shall provide the location of the work, expected start and end times and dates of the road obstruction. The PIO will notify the newspaper, school districts, Spokane Valley Police Department, or fire dispatch as necessary. * The City of Spokane Valley may request changes as warranted by traffic conditions and motorist behavior. * If the construction zone is open to traffic before completion of final paving the Contractor shall provide warning signs, as required by the MUTCD and WSDOT specifications. * WSDOT Work Zone Traffic Control Guidelines are available at www.wsdot.wa.gov. For future submittals, please use the "Work Zone Traffic Control Plans (TC-1 — TC-18) if applicable to your project. * Prior to performing excavation work in the Right -of -Way, permittee shall field locate existing stormwater and irrigation infrastructure through visual inspection of existing finish grade facilities. Permittee may also contact City of Spokane Valley Stormwater Utility division at (509) 720-5005 (Aaron Clary) to request maps and other available documents to clarify and assist in locating these utilities. * Prior to excavation, it is the Contractor responsibility to contact the purveyor of any transmission pipeline that is within 100 feet of permitted work, as per RCW 19.122.033. Printed by : Greg Stauffer on: 01/06/2017 09:30 AM Page 1 of 2 Spokane ,,,►.Valley® City of Spokane Valley Community & Economic Development 11707 E. Sprague Ave., Suite 108 Spokane Valley, WA 99206 (509) 720-5240 permitcenter(a�spokanevalley.orq DE -ROW ROW-2017-0010 The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the applicant / permittee that the use described on the front of this permit complies with applicable codes and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are required and may necessitate removal of certain parts of the construction are the applicant's / permittee's or property owner's expense. Owner/Agent Date: Staff Approval Date: Printed by : Greg Stauffer on: 01/06/2017 09:30 AM Page 2 of 2