2010, 03-08 Permit App 10000595 Garage AdditionProject Number: 10000595 Inv: 1
Application
PHIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Project Information:
Permit Use: 346 SQFT GARAGE ADDITION
Setbacks: Front
Left: Right: Rear:
Site Information:
Plat Key: 002958 Name: WOODLO HEIGHTS ADD
Contact: FLINT, DANIEL P & JEANNE M
Address: 9702 E NORA AVE
C - S - Z: SPOKANE, WA 99206-4168
Phone: (509) 000-0000
Group Name:
Project Name:
District: Nort
Parcel Number: 45083.0415 Block: 2
SiteAddress: 9702 E NORA AVE
Location:: CSV
Zoning: UR-3.5
Water District:
Urban Residential 3.5
Area: 5,665.00 Acres Width: 0
Nbr of Bldgs: 0 Nbr of Dwellings: 0
Review Information:
Lot: 5
Owner: Name: FLINT, DANIEL P & JEANNE M
Address: 9702 E NORA AVE
SPOKANE, WA 99206-4168
Hold: ❑
Depth: 0 Right Of Way (ft): 0
Date: 3/8/2010 Page 1 of 2
Review
Building Plan Review
Released By:
Originally Released:
Landuse/Zoning/HE Conditions
Permits:
3/5/2010 By: tmelbourn
Released By:
Originally Released: 3/5/2010 By: mpalaniuk
Operator: JD Printed By: jmm Print Date: 3/8/2010
Project Number: 10000595 Inv: I
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Contractor. OWNER
Description
GAR WOOD
Gr IY2
U-1 VB
Item Description
RESIDENTIAL PERMIT FEE
ACCESSORY PLANS REVIEW
WSBCC SURCHARGE
Notes: rrt --
Building Permit
Date: 3/8/2010
Page 2 of 2
Firm: OWNER
Phone: (000) 000-0000
This Application:
Notes Sq Ft
GARAGE 346
Valuation
$6,574.00
Totals: 346
Units Unit Desc
1
1
1
SELECT
SELECT
SELECT
$6,574.00
Permit Total Fees:
Payment Summary:
Permit Type
Building Permit
Fee Amount
$178.56
Invoice Amount
$178.56
Total Project:
Sq Ft Valuation
346 $6,574.00
346 $6,574.00
Fee Amount
$139.25
$34.81
$4.50
Amount Paid
$38.31
$178.56
Amount Owing
$140.25
$178.56 $178.56 $38.31
$140.25
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator. JD Printed By: jmm
Print Date: 3/8/2010
A Permit Center
S okane 11707 E Sprague Ave, Suite 106
.0,00Vallev Spokane Valley, WA 99206
(509)688-0036 FAX: (509)588-0037
Community Development www.spokanevatlev.orq
Residential Construction
Permit Application
PERMIT NUMBER: j = C1')
PERMIT FEE:
❑ New Construction ❑ Accessory Bldg
gAddition/Remodel ❑ Deck
❑ Other:
SITE ADDRESS 7 !6 E- /ver ily o ( 04. 0,7C
ASSESSORS PARCEL NO:
LEGAL DESCRIPTION:
Building Owner:
Name:4,�'!i e( ,/-'/ 1)4 /
Address: q 7L71 £ /V r/
City: ��f/ttri e State: (��
Zip: ����
Phone: 7_ Q ?) Fax:
f
Contact Person
Name: 7 /'/'G' ( /2�14 h,-?E
Phone: j,27- ?572—
Describe the scope of work in detail:
Contractor:
Name: � ,-)2.
DGr�'/ i e// f'G/
Address: f 7�� i- /V )/4
City: spz '97( State: A7)
Zip:1'f24
Phone: may/ g ) Fax:
Contractor Lic No: Exp Date:
City Business Lic. No:
Cost of Project: $ EVOO•
eX*- z/k g6o /I n
**************The following ST be complete: (write N/A if not applicable)
*********************
HEIGHT TO PEAK:
DIMENSIONS:
# OF STORIES:
TOTAL HABITABLE SPACE:
MAIN FLOOR TO SQ.
FTG:
2Nu FLOOR SQ. FTG:
,/
UNFIN BASEMENT SQ. FTG:
IMPERVIOUS SURFACE
AREA:
FINISHED BASEMENT
SQ. FTG:
GARAGE SQ. FTG: `"*-
3'./ It F•
DECK/COV. PATIO SQ. FTG:
30% SLOPES ON
P TY:
# OF BEDROOMS:
CONSTRUCTION TYPE:
HEAT SOURCE:. ,/SEWER
OR SEPTIC?
'
The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. 6) Plane additional information may be required to be submitted, and subsequently approved before
this application n be processed.
Signature
Method of Payment:
❑ Cash
Bankcard #:
Authorized Signature:
REVISED 8/25/2005
❑ Check
Date od--eg 1/2i
0 Mastercard 0 JISA RECEIVED
Expires: VIIV PERMIT CENTER
I MAR 0 4 2010
Project #,
Name
}Submittal #,1_
Spokane
Valley®
For City Use Only
PLUS Project Number
Project Address
11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206
509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org
As part of our on -going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
r- Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven 't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure, you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE -APPLICANT PINK - BUILDING FILE
REV 9/07
IgSl
Pmo 1 Houst
�wemr5
Y&bk-
0
e4ce
E XI 'TIAI E
RESIDEPlCE
U 60�
PLANNING DEPT. APPROVED
BY;
T
?- FX? 57� R
r
Prop DSed
n<cESS�°�
23' _
iRss 0
DATE: 3 /sew/o
/NOR A 3T
VAR 0
IV3TA.
Q�,v�wFY