Loading...
1980, 04-10 ZE-21-80 Hearing Examiner FindingsFile No. ZE-21-80 SPOKANE COUNTY HEARING EXAMINER COMMITTEE FINDINGS AND ORDER A. INTRODUCTION This matter having come before the Hearing Examiner Committee on April 10 Chairman, B. PROPOSAL , 1980, and the members of the Committee present being Kenneth Kennedy and The sponsor, Phillip and 'William Vigue ¢attQzkzaRs/zone reclassification,.File No. Ted McCoury John Culler is requesting approval of a olxarrae<xtxg ZE-21-80 , Agricultural to Restricted Industrial , £nxxthexbslxam5axxvfxxte lxs544%P (no proposed development at this time). C. FINDINGS OF FACT 1. That the existing land use in the area is residential, school, grange, commercial and undeveloped. 2. That the Comprehensive Plan designates this area as appropriate for industrial development. 3. That the existing zoning of the property described in the application is Agricultural 4. That the provisions of RCW 43.21C (The State Environmental Policy Act) have been complied with: 5. That the proper legal requirements for advertisement of the Agenda item have been fulfilled. 6. That the land in this area is suitable/u0o06t& tla for the proposed use, or uses within the proposed Zone Classification. 7. That the applicant has/,tZaxsx,n*xdemonstrated that conditions have substantially changed since the original zoning of this area and accordingly, the proposed rezone ish6sx>006(justified. File No. ZE-21-80 8. That the proposed use is compatible/xixKxxtecwith existing uses in the area. 9. That the owners of adjacent lands expressed oeikircyxfaopro^.as/disapproval/ basA of the proposed use. 10. The Hearing Examiner Committee finds/x2escnot(x5dxxi<the proposed use to be in harmony with the general purpose and will not be otherwise detrimental to the public health, safety, and welfare. 11. The following are additional findings of fact considered by the Hearing Examiner Committee: The Hearing Examiner Committee personally visited the site. D. CONDITIONS OR CONTINGENCIES APPLIED TO THIS APPROVAL (List here all conditions noted in Staff Analysis) All Conditions listed in Staff Report. 1. Applicant shall Dave 40 feet on Nora Avenue, and also, the applicant shall construct cement rnnrrptp curb along Nora Avenue. E. ORDER The Hearing Examiner Committee, pursuant to the aforementioned, finds that the application of Phillip and William Vigue for a 016mtexmixxbardx:txAmizone reclassification as described in the application should be approved/56°1xiM( -2- File No. ZE-21-80 Motion by: Kennedy Vote: 3 - 0 Approved ATTEST: JAMES L. MANSON Acting Planning Director By: /ill fr/y7,/,- ,.//; ♦-'r 3 -/I -So Seconded by: McCoury HEARING EXAMINER COMMITTEE ei c✓ l f4 )1 ( - Z-v, 3 File No. ZE-21-80 SPOKANE COUNTY HEARING EXAMINER COMMITTEE FINDINGS AND ORDER A. INTRODUCTION This matter having come before the Examiner Committee on April 9, 1981, and the members of the Committee present being Jane Myers, Chairperson, Ron McVicker and John Culler. B. PROPOSAL The sponsor, Don Krebs, is requesting approval of a Change of Conditions, File No. ZE-21-80 for the purpose of developing an equipment storage yard and building in the Restricted Industrial Zone. C. FINDINGS OF FACT 1. That the existing land use in the area is school, industrial, storage yard and undeveloped. 2. That the Comprehensive Plan designates this area as appropriate for urban development. 3. That the existing zoning of the property described in the application is Restricted Industrial. 4. That the provisions of RCW 43.21C (The State Environmental Policy Act) have been complied with, and the Committee concurs with the Declaration of Non -Significance. 5. That the proper legal requirements for advertisement of the Agenda Item have been fulfilled. 6. That the land in this area is suitable for the proposed use, or uses within the proposed Zone Classification. 7. That the applicant has demonstrated that conditions have substantially changed since the original zoning of this area and accordingly, the pro- posed rezone is justified. 8. That the proposed use is compatible with existing uses in the area. 9. That the owners of adjacent lands expressed approval of the proposed use. 10. The Hearing Examiner Committee finds the proposed use to be in harmony with the general purpose and will not be otherwise detrimental to the public health, safety, and welfare. 1 File No. ZE-21-80 D. CONDITIONS OR CONTINGENCIES APPLIED TO THIS APPROVAL a) COUNTY PLANNING DEPARTMENT 1. The Zoning Administrator shall approve a specific exterior lighting plan for the approved area prior to installation of such lighting. (Such plan shall attempt to confine illumination to the area with full considera- tion to adjacent properties). 2. A specific landscape plan, planting schedule and provisions for mainten- ance acceptable to the Spokane County Zoning Administrator shall be submitted with a performance bond for the project prior to release of building permits. 3. The applicant shall develop subject property generally in accordance within the concept presented to the Hearing Examiner Committee. Minor variations when approved by the Zoning Administrator will be permitted, including, but not limited to the following changes: Building location, landscape plans, and general allowable uses of the permitted zone. All variations must conform to regulations set forth in the Spokane County Zoning Ordinance. The original intent of the development plans shall be maintained. 4. Direct light from any exterior area lighting fixture shall not extend over the property boundary. 5. That the existing chainlink fence shall remain; however, if the school building becomes active again in the future, a 6-foot sight -obscuring barrier will be required. 6. Applicant shall comply with '208' recommendations concerning storm - water runoff and provide necessary landscaping for runoff. 7. Applicant shall comply with all agency's regulations as amended prior to issuance of building permits. 8. That the provisions of SEPA's NOTICE OF ACTION pursuant to Chapter 43.21C.080 RCW and the Board of Spokane County Commissioners Resolution #77-1392 be initiated by the project applicant within thirty (30) days of final disposition of this application, and prior to any on -site improvements. 9. Pursuant to the provisions of Chapter 43.21C RCW, the SEPA Guidelines (WAC 197-10) and the Spokane County Environmental Ordinance (SCEO), a proposed declaration of non -significance has been issued at least fifteen (15) days prior to this date; the official file, written comments and/or public testimony contain information regarding assessment of the proposal's adverse impacts to the physical environment; a finding is hereby made that no potentially significant adverse impacts upon the physical environment are anticipated as a result of the project; and a final declaration of non -significance is hereby to be issued. 10. All current standards of the Restricted Industrial Zone, as amended, shall be complied with in the development of this site. 2 File No. ZE-21-80 b) COUNTY ENGINEERING DEPARTMENT 1. Applicant shall pave 20 feet on Nora Avenue. 2. Applicant shall construct cement concrete curb and sidewalk adjacent to the property on Nora Avenue. 3. Applicant shall submit for approval by the Spokane County Engineer road, drainage, and access plans prior to the issuance of a building permit on the property. 4. The applicant shall submit for approval by the Spokane County Engineer and the Spokane County Health District a detailed combined on -site sewage system plan and surface water disposal plan for the entire project prior to the issuance of any building permit on the property. 5. A parking plan and traffic circulation plan shall be submitted and approved by the Spokane County Engineer prior to the issuance of a building permit on the property. The design, location, and arrange- ment of parking stalls shall be in accordance with standard traffic engineering practices. Paving or surfacing as approved by the County Engineer, will be required for any portion of the project which is to be occupied or traveled by vehicles. 6. The word "applicant" shall include the owner or owners of the property, his heirs, assigns, and successors. 7. To construct the road improvements stated herein, the applicant may, with the approval of the County Engineer, join in and be a willing participant in any petition or resolution which purpose is the formation of a Road Improvement District (RID) for said improvement pursuant to RCW 36.88, as amended. Spokane County will not participate in the cost of these improvements. 8. The construction of the road improvements stated herein shall be accomplished as approved by the Spokane County Engineer. 9. AM required improvements shall conform to the current State of Washing- ton Standard Specifications for Road and Bridge Construction, and other applicable county standards in effect at the date of construction, unless otherwise approved by the County Engineer. c) COUNTY UTILITIES DEPARTMENT 1. Pursuant to Board of County Commissioners Resolution No. 80-0418, the use of on -site sewer disposal systems is hereby authorized. This authorization is conditioned on compliance with all rules and regulations of the Spokane County Health District and is further conditioned and subject to specific application approval and issuance of permits by the Health District. 3 File No. ZE-21-80 2. The owner, his heirs or successors shall join and participate in any petition or resolution which purpose is the formation of a utility local improvement district (ULID) pursuant to RCW, Chapter 36.94, as amended. The owner, his heirs and successors shall further agree not to oppose or protest any legal assessments for any utility local improve- ment district (ULID) established pursuant to RCW Chapter 36.94, as amended. 3. Any water service for this project shall be provided in accordance with the Coordinated Water System Plan for Spokane County. 4. Each unit shall be double plumbed for connection to future areawide collection system. d) COUNTY HEALTH DISTRICT 1. Recommendations: a) Water service must be coordinated through the Director of Utilities, Spokane County. b) Water service shall be by an existing public water supply when approved by the Regional Engineer (Spokane), State Department of Social and Health Services. c) The use of individual wells is not authorized. d) Sewage disposal method shall be as authorized by the Director of Utilities, Spokane County. e) Subject to specific application approval and issuance of permits by the Health Officer, the use of individual on -site sewage disposal systems may be authorized. e) COUNTY BUILDING AND SAFETY DEPARTMENT 1. The site is located in Fire District #1. 2. Mains and hydrants to be installed, in accordance with the Spokane County Department of Building and Safety. f) WATER PURVEYOR 1. Purveyor is Washington Water Power #1, and they will supply the site with adequate water for domestic, fire and irrigation uses. E. ORDER The Hearing Examiner Committee, pursuant to the aforementioned, finds that the application of Don Krebs, for a Change of Conditions as described in the appli- cation should be approved. 4 File No. ZE-21-80 Motion by: McVicker Seconded by: Culler Vote: Uninamous to Approve (3-0) ATTEST: WALLIS D. HUBBARD Planning Director By: i/../ ; _/, i. i .r,: Date: HEARING EXAMINER COMMITTEE .',, 5 a f f f AV E • >- 0 CC 0 0 cc .allioLla salirsole CC 6.% try. /4 -J Ft RE LiJ TAT ION RU51- f Pal ANA AVE -NORA • SA.D...••• ma RP r, 5 la AR P 4C El AY 1410-RE U. et 4 POSTF - 0 0 cc a AGENDA, APRIL 10, 1980 SPOKANE COUNTY ZONING HEARING EXAMINER COMMITTEE Place: Broadway Centre Building, Second Floor North 721 Jefferson Street, Spokane JACK FiNAIEY TELEPHONE NO.: 456 - 2205 REC I V ED $rOtANP mon, thElak€t; APR 0 41980 9:00 A.M. A. ZONE RECLASSIFICATIONS 1. ZE- 30-80 TRANSIENT LIVING TO COMMERCIAL (Generally located on the north side of Sprague/Appleway Avenue, 290 feet northeast of Corbin Road. Section 18-25-45) Proposed Use: No proposal at this time. Applicant: REDLIN 2. ZE -25-80 AGRICULTURAL TO RESTRICTED INDUSTRIAL (Generally located at the northwest corner of Mallon Avenue and Howe Street. Section 14-25-43) Proposed Use: Warehouse. Applicant: CURRAN/DELAY 3. ZE- 24-80 4. ZN-247-79 5. ZS- 12-80 (.54 Acres) (.3 Acres) TWO-FAMILY RESIDENTIAL TO MULTIPLE FAMILY SUBURBAN (Generally located on the west side of Locust Road, 130 feet south of Main Avenue. Section 17-25-44) Proposed Use: 15-unit apartment complex to be developed in conjunction with property to the south; total of 30 units in development. Applicant: CARROLL AGRICULTURAL TO COMMERCIAL (Generally located on the east side of Short Road, south of the abandoned Inland Empire Highway. Section 11-28-42) Proposed Use: Bank Applicant: WASHINGTON TRUST BANK AGRICULTURAL TO COMMERCIAL (Generally located on the northeast side of the Palouse Highway, 910 feet northwest of Freya Street. Section 3-24-43) Proposed Use: Equipment Rental Facility Applicant: LEWIS/WICKHAM/BRUMMETT ZE- 21-80 AGRICULTURAL TO RESTRICTED INDUSTRIAL (Generally located on the south side of Nora Avenue, west of Park Road. Section 12-25-43) Proposed Use: No proposed development. Applicant: VIGUE 12:00 NOON LUNCH (Place to be announced at the Hearing) (.43 Acres) (.98 Acres) (2.2 Acres) 1:30 P.M. RECONVENE