Loading...
1980, 04-10 ZE-21-80 Staff Report Zone ReclassificationDATE: TO: FROM: SUBJECT: STAFF REPORT April 10, 1980 HEARING EXAMINER COMMITTEE PLANNING DEPARTMENT STAFF ZONE RECLASSIFICATION NUMBER: ZE-21-80 I. GENERAL INFORMATION APPLICANT: Phillip and William Vigue STATUS OF APPLICANT: Owners REQUESTED ZONING: Restricted Industrial EXISTING ZONING: Agricultural (established 1948 PROPOSED USE: No proposed development, possible storage of building materials. PROJECT LOCATION: The site is generally located on the south side of Nora Avenue, west of Park Road. II. SITE PLAN INFORMATION SITE SIZE: SITE CHARACTERISTICS: Approximately 4.2 Acres. The site is flat, has little vegetation and contains no permanent buildings. NEIGHBORHOOD CHARACTER: The area appears to be a mix of residential, industrial and public uses, with industry the predominant use. LAND USE: Site Undeveloped/Storage yard for trusses North Residential/Trusses Corporation East Singe family/Undeveloped West Storage area South Seth Woodard Elementary School/East Spokane Grange Hall ZONING: North Restricted Industrial, established 1964 Agricultural, established 1948 Residential Office, established 1962 East Agricultural, established 1948 Agricultural Suburban, established 1954 West Restricted Industrial, established 1954 Agricultural, established 1948 South Agricultural, established 1948 COMPREHENSIVE PLAN DESIGNATION: Industrial (contd.) ZONE RECLASSIFICATION NO. ZE-21-80 II. SITE PLAN INFORMATION (contd.) NUMBER OF BUILDINGS EXISTING: 0 NUMBER OF BUILDINGS PROPOSED: 0 III. BACKGROUND/ANALYSIS a) The applicant has indicated building materials will be temporarily stored on this site; however, no structural development of the site is proposed at this time. Therefore, the applicant will be required to apply for a change of conditions when the site is to be developed. The Committee may consider requiring the applicant to landscape and sprinkler areas outside of the required 6-foot sight -obscuring fence. b) The Spokane County Health District finds that: 1. This project lies over the Spokane Aquifer, within Critical Water Supply Service Area No. 3, and within the water service area of the Washington Water Power Company. It is within the Primary Sanitary Sewer Area recommended in the "208" study. Topography and soils in this area are generally suitable for use of on -site sewage systems. IV. AGENCIES RECOMMENDED CONDITIONS a) COUNTY FIRE MARSHAL 1. The site is located in Fire District #1. 2. Adequate water for fire protection and distribution of such water is required. A water plan is required to be submitted for approval prior to any land development. 3. Plans for emergency access will require approval prior to issuance of building permits. b) COUNTY ENGINEER 1. An appropriate off -site drainage disposal system and access plans shall be approved by the Spokane County Engineer's Office prior to the issuance of.building permits for the project. 2. A detailed combined on -site sewage system and surface water disposal plan for the entire project shall be approved by the County Engineer and the Spokane County Health District prior to the issuance of any building permit. 3. The design, location and arrangement of parking stalls shall be in accordance with standard traffic engineering practices. Any portion of the project which is to be occupied or traveled by vehicles shall be maintained in hard surface paving. 2 (contd.) ZONE RECLASSIFICATION NO. ZE-21-80 IV. AGENCIES RECOMMENDED CONDITIONS c) WATER PURVEYOR 1. Purveyor is Washington Water Power Company, and they will supply the site with adequate water for domestic uses; however, they are unable to determine adequate fire flow needed until the Fire Marshal has reviewed a development plan. d) COUNTY HEALTH DISTRICT 1. Water service shall be only from the Washington Water Power Company. 2. The use of on -site sewage systems may be authorized until service from a central sewerage system is available. 3. The owner, his heirs, and successers shall agree to not protest legal assessments and utility local improvement districts to provide central sewerage service to this lot. 4. A combined surface water and sewage disposal detailed plan shall be approved by the County Engineer and the Health Officer prior to the issuance of any building permit for this lot. e) SEPA 1. That the provisions of SEPA`s Notice of Action pursuant to 43.21C.080 RCW be accomplished by the applicant within thirty (30) days of formal action by the Zoning Hearing Examiner Committee as instructed by the Planning Department staff. 2. The request has proven to be environmentally non -significant. Therefore, a final declaration of non -significance shall be signed by the Chairman of the Hearing Examiner Committee. f) ZONING 1. Approval by the Zoning Administrator of a specific lighting and signing plan for the described property prior to the release of any building permits. 2. A specific landscape plan, planting schedule and provisions for maintenance acceptable to the Spokane County Zoning Administrator shall be submitted. with a performance bond for the project prior to release of building permits. 3. The applicant shall develop subject property generally in accordance within the concept presented to the Hearing Examiner Committee. Minor variations when approved by the Zoning Administrator will be permitted, including, but not limited to the following changes: Building location, landscape plans, and general allowable uses of the permitted zone. All variations must conform to regulations set forth in the Spokane County Zoning Ordinance. The original intent of the development plans shall be maintained. 4. Direct light from any exterior area lighting fixture shall not extend over the property boundary. 3 (contd.) ZONE RECLASSIFICATION NO. ZE-21-80 IV. AGENCIES RECOMMENDED CONDITIONS (contd.) • f) ZONING (contd.) 5. The specific development plan will be submitted for Hearing Examiner Committee review and approval prior to issuance of building permits.