Loading...
1987, 09-23 Fire Flow DeterminationGUIDE FOR DETERMINATION OF REQUIRED FIRE FLOW C. IV III V-t4 FIRE -RESISTIVE NON-COMBUSTIBLE ORDINARY WOOD FRAME MIXED NOTE: IF "MIXED", SEE SPECIAL INSTRUCTIONS FOR AREA AND BASIC FIRE FLOW. B. DETERMINE THE GROUND FLOOR AREA dl2o itimwoua_ unrz DETERMINE THE HEIGHT IN STORIES D. DETERMINE REQUIRED FIRE FLOW TO THE NEAREST 250 GPM (USE TABLE 9035-9 GPM E. DETERMINE THE CREDIT OR SURCHARGE, IF ANY, FOR TYPE OF OCCUPANCY. IF LOW HAZARD, SUBTRACT UP TO 25% OF (D); IF HIGH HAZARD, ADD UP TO 25% OF (D) CREDIT (SUBTRACT) 2s % SURCHARGE (ADD) 2.2.5 90 903.59 x.25= 2z5,90 TOTAL 677.4.y DETERMINE CREDIT IF ANY FOR AUTOMATIC SPRINKLER PROTECTION. CREDIT (SUBTRACT) o TOTAL 677.69 DETERMINE EXPOSURE ADJUSTMENT;'` USING THE TABLE AT LEFT AS GUIDE, ENTER THE SEPARATION AND ADJUSTMENT FOR EACH OF THE "FOUR FACES' OF THE BUILDING IN THE TABLE AT RIGHT: SEPARATION MAX ADJUSTMENT 0-10 25% MAX 11-30 20% MAX 51-60 15% MAX 61-100 1qq% MAX 101-150 S% MAX 1S1-OR 4-HR WALL 0% MAX EXPOSURE SEPARATION ACT. ADJUSTMENT NORTH id' ADD 26- EAST uNrr ADD zs % SOUTH VS' ADD 1S WEST. 4417" ADD 24' % TOTAL % ADJUSTM IT (NOT TO EXCEED /5%): 4tr r % DETERMINE ROOF COVERING ADJUSTMENT; (IF WOOD SHINGLE ROOF COVERING, ADD 500 GPM) ADJUSTMENT: cot»posmoN (G) & (H) SURCHARGE (ADD) sos.z7 TOTAL: __l[ "6 Zr J OFF THE FINAL ANSWER TO THE NEAREST 250 GPM IF LESS THAN 2500 GPM AND TO NEAREST 500 GPM IF GREATER THAN 2500 GPM. TOTAL REQUIRED FIRE FLOW: Izso,s rh "FIRE Raul Fop. sw• tas.. su►wit4 Is 35uo btm fdirateml, repozrrn 9iagk 677.69 x . 76= So8.27 FIRE DISTRICT ff i ADDRESS it 303 uNPIE0.Srry PLAN # A. DETERMINE TYPE OFCONSTRUCTION- CLASS (CIRCLE ONE): I - I F� G.