Loading...
2005, 12-21 Permit 05004721 ResidenceSpokane ,,;,o0valley BUILDING DIVISION 11707 E. Sprague Avenue, Suite 106 Spokane Valley, WA 99206 Site Information Project Information I Site Address: 3721 S PINEROCK IN Parcel Number: 45345.9146 Subdivision: Block 3 Lot: 5 Zoning: UR-3 Urban Residential 3.5 Owner. CLIFF SCHMITZ CONSTRUCTION Address: 16520 E SECRETARIAT SPOKANE VALLEY, WA 99037 Building Inspector. MARK HILLABRANDT Water Dist: Project Number: 05004721 Inv: I Issue Date: 12/21/2005 Permit Use: NEW RESIDENCE W/ATTACHED GARAGE -GAS Applicant: CLIFF SCHMITZ CONSTRUCTION 16520 E. SECRETARIAT VERADALE, WA 99037 Phone: (509) 922-4297 Contact: CLIFF SCHMITZ CONSTRUCTION 16520 E. SECRETARIAT VERADALE, WA 99037 Phone: (509) 922-4297 Setbacks - Front: 26 Left: 20 Right: 10 Rear: 55 Group Name: ProjectName: Permits Buildin,-Permit Contractor: CLIFF SCHMITZ CONSTRUCTION License #. CLIFFSC104RF 2ND FLOOR R-3 VB 770 RESIDENTIAL PERMIT FEE $1,228.95 BASEMENT U R-3 VB 444 STATE SURCHARGE S4.50 GARAGE U-1 VB 440 RESIDENTIAL PLAN REVIEW $491.58 RESIDENCE R-3 VB 928 Total Permit Fee: $1,725.03 Total Value: $141,826.64 FOR BUILDING INSPECTIONS CALL (509) 688-0054. Mechanical Permit Contractor: STURM HEATING License #: STURM*210QF GAS WATER HEATER 1 $10.00 GAS APPLIANCE=100,000BT 1 $12.00 GAS PIPING 2 $2.00 VENTILATING FANS 4 S40.00 HOOD -TYPE II 1 $10.00 Total Permit Fee: $74.00 FOR MECHANICAL INSPECTIONS CALL (509) 688-0054. PlumbinyPermit Contractor: JIMMY'S PLUMBING License#: MAMP*988KP TOILETS/BIDETS 3 $18.00 SINKS 4 $24.00 TUBS 2 $12.00 DISH WASHERS 1 $6.00 GARBAGE DISPOSAL 1 $6.00 CLOTHES WASHER 1 $6.00 FLOOR DRAINS 1 $6.00 WATER USING DEVICES 3 $18.00 Total Permit Fee: $96.00 FOR PLUMBING INSPECTIONS CALL (509) 688-0054. Processed By: JANSSEN, CHRISTINA PERMIT Printed By: Main, Jodi L Page 1 of 2 NOTICE The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the applicant/permittee that the use described on the front of this permit complies with applicable codes and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the applicant's/permittee's or property owner's expense. At a minimum, the following inspections ARE REQUIRED by City Code: FOOTING — when forms and reinforcement are in place and prior to placement of concrete -all structures, including manufactured homes. NOTE: This inspection includes review of the structure's setback from property lines. Minimum setbacks are established by City of Spokane Valley Ordinance. Curb lines and fence lines are not necessarily indicative of property lines. The responsibility to comply with applicable setback provisions lies solely with the permittee-neither the City of Spokane Valley nor its authorized representatives assume any responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the owner's/permittee's expense. FOUNDATION — when forms and reinforcement are in place and prior to placement of concrete. PLUMBING — after rough -in, before covering, and final MECHANICAL — rough -in of piping, before covering, metal chimneys before concealment, and final. FRAMING — after all framing, bracing and blocking is in place, rough electrical, plumbing and mechanical systems are complete, and prior to concealing. FINAL — when complete and prior to occupancy and/or use. All permits require final inspection. NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this permit Items such as the installation of fire hydrants. fire department access. on -site drainage ('208' swales), road improvements, parking and landscaping are common requirements of a permit/site plan which must be completed prior to final approval of a building or issuance of a Certificate of Occupancy. MANUFACTURED HOMES — Final inspection required when complete, stairs, handrails, skirting, etc. installed, and prior to occupancy; completed inspection record card must be available on site. PLUMBING REVERSALS FOR SEWER CONNECTIONS — prior to cover. RIGHT-OF-WAYIAPPROACH — prior to placement of concrete/asphalt or, if gravel approach, after completion. In addition to the above. any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc. must be inspected prior to cover. Check with the Building department for "special inspections" in conjunction with commercial projects. FOR INSPECTIONS Please give one working day/24 hour notice. Different parts of your project may require permits and inspections from more than one agency. Building, plumbing (includes interior reversals for sewer) and mechanical, City of Spokane Valley Building Division 688-0054 Pemtits and inspections for electrical wiring. State Department of Labor And Industries 324-2640 Pemuts and inspections for on -site septic system, Spokane Regional Health Distnct 324-15M Road cuts for utilities or driveways, City of Spokane Valley Public Works 688-0195 or State Dept of Transportation 324-6000 Permits and inspections for Sewer Connection. Spokane County Utilities Division 41r-3604 Fire sprinkler and ataon system and private access road inspections. Spokane Valley Fire Department 8924122 State law RCW 19.122 requires that poor to any excavation the'CALL BEFORE YOU DIG -center must be notified. Call before you dig at least working days in advance, 456�8000. PERMIT EXPIRATION AND REFUNDS All permits shall expire by limitation and be declared void if a) work is not started within 180 days of obtaining a permit, or b) work is abandoned for 180 days or more after beginning work, or c) after two years from the date of permit issuance, regardless of whether the. work is finished. If a permit is expired for time, a new permit may be obtained for half the permit fee based on the value of the remainder of the work to finish the original permit. All refund requests must be made in writing by the original permittee to the Building Official no later than 180 days after the date of fee payment. 100% refunds will be granted for any fee erroneously paid or collected. Refunds of not more than 80% of a permit fee maybe authorized when no work has been done under the permit issued. Refunds of not more than 80% of a plan review fee paid may be authorized when an application is withdrawn or cancelled prior to the plan review being completed. Owner / Agent Date Staff Approval Date Spokane ,,;01I*Valley BUILDING DIVISION 11707 E. Sprague Avenue, Suite 106 Spokane Valley, WA 99206 Site Information Proiect Information Site Address: 3721 S PINEROCK LN SPOKANE VALLEY. WA 99016 Parcel Number: 45345.9146 Project Number: 05004721 Inv: 1 Issue Date: 12/21/2005 Permit Use: NEW RESIDENCE W/ATTACHED GARAGE -GAS Permits Payment Summary Total Fees AmountPaid AmountOwine Tran Date Receipt # Pavment Amt $1,895.03 $1,895.03 $0.00 12/21/2005 3848 $1,895.03 Processed By: JANSSEN, CHRISTINA PERMIT Printed By: Main, Jodi L Page 2 of 2 NOTICE The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the applicant/permittee that the use described on the front of this permit complies with applicable codes and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the applicant's/perrnittee's or property owner's expense. At a minimum, the following inspections ARE REQUIRED by City Code: FOOTING — when forms and reinforcement are in place and prior to placement of concrete -all structures, including manufactured homes. NOTE: This inspection includes review of the structure's setback from property lines. Minimum setbacks are established by City of Spokane Valley Ordinance. Curb lines and fence lines are not necessarily indicative of property lines. The responsibility to comply with applicable setback provisions lies solely with the pernittee-neither the City of Spokane Valley nor its authorized representatives assume any responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the owner's/permittee's expense. FOUNDATION — when forms and reinforcement are in place and prior to placement of concrete. PLUMBING — after rough -in, before covering, and final. MECHANICAL — rough -in of piping, before covering, metal chimneys before concealment, and final. FRAMING — after all framing, bracing and blocking is in place, rough electrical, plumbing and mechanical systems are complete, and prior to concealing. FINAL— when complete and prior to occupancy and/or use. All permits require final inspection. NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this permit Items such as the installation of fire hydrants, fire department access, on -site drainage ('208' swales), road improvements, parking and landscaping are common requirements of a permit/site plan which must be completed prior to final approval of a building or issuance of a Certificate of Occupancy. MANUFACTURED HOMES — Final inspection required when complete, stairs, handrails, skirting, etc. installed, and prior to occupancy', completed inspection record card must be available on site. PLUMBING REVERSALS FOR SEWER CONNECTIONS — prior to cover. RIGHT-OF-WAY/APPROACH — prior to placement of concretelasphalt or, if gravel approach, after completion. In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc, must be inspected prior to cover. Check with the Building department for "special inspections" in conjunction with commercial projects. FOR INSPECTIONS Please give one working day/24 hour notice. Different parts of your project may require permits and inspections from more than one agency. Building, plumbing (includes interior reversals for sewer) and mechanical, City of Spokane Valley Building Division 688-0054 Permits and Inspections for electrical wiring, State Depatnent of Labor And Industries 324-2640 Permits and Inspections for on -site septic system. Spokane Regional Health Dstrict 324-ISSD Road cuts for utilities or driveways, City of Spokane Valley Public Works 688-0195 or State Dept of Transportation 324-6000 Perrils and inspections for Sewer Connection. Spokane County Utilities DMsion 477-3604 Fire sprinkler and alarm systems and private access road inspections. Spokane Valley Fire Department $924122 State law RCW 19.122 requires that prior to any excavation the -CALL BEFORE YOU DIG- center must be notified. Call before you dig at least 2 working days in advance. 45"000. PERMIT EXPIRATION AND REFUNDS All permits shall expire by limitation and be declared void if a) work is not started within 180 days of obtaining a permit, or b) work is abandoned for 180 days or more after beginning work, or c) after two years from the date of permit issuance, regardless of whether the work is finished. If a permit is expired for time, a new permit may be obtained for half the permit fee based on the value of the remainder of the work to finish the original permit All refund requests must be made in writing by the original permittee to the Building Official no later than 180 days after the date of fee payment. 100% refunds will be granted for any feeeeeeeerroneously paid or collected. Refunds of not more than 80% of a permit fee may be authorized when no work has been done under the issped. Refunds of not more than 80% of a plan review fee paid maybe authorized when an application is withdrawn or cancalJed/'prio to the pl review being completed. Owner / Agent Date 12- / o5- Staff Approval U // I Date