Loading...
2014, 07-21 9810 Duct Leakage AffidavitDuct Leakage Affidavit (New Construction) Permit #: House address or lot number: y810 C K%nox five City: 290icrw,e zip: 9G20f, Cond. Floor Area (ft2): 1 IG Source (circle one): Plans Estimated ) Measured ❑ Duct tightness testing is not required. The total leakage test is not required for ducts and air handlers located entirely within the building thermal envelope. Ducts located in crawl spaces do not qualify for this exception. Air Handler in conditioned space? ❑ yes ® no Circle Test Method: Leakage to Outside Air Handler present during test? ❑ yes E no Total Leakage'; Maximum duct leakage: Post Construction, total duct leakage: (floor area x .04) = CFM@25 Pa Post Construction, leakage to outdoors: (floor area x .04) = CFM@25 Pa Rough -In, total duct leakage with air handler installed: (floor area x .04) _ 41 CFM@25 Pa Rough -In, total duct leakage with air handler not installed: (floor area x .03) = CFM@25 Pa Test Result: 3 l CFM@25Pa Ring (circle one if applicable): Open Duct Tester Location: S" PT; jlZet-.cu Plev,uN Pressure Tap Location: Lc uy%bn, RM 3op f/Mc.S}e, RM 2z.}urti I certify that these duct leakage rates are accurate and determined using standard duct testing protocol. Company Name: Technician Signature: Date: 7 - 21-14 Phone Number: (208) 964- sofa Technician: Property Address: C12io E Vviok Awe Spi'Arh c \Wi ft O1206 Conditioned Floor Area: 18pp Date: I) 6 11,4 Builder or registered design professional: IC,I[ Soaahs� Lliuc� (ZaS�9dM'So84 Signature: r3-Ya�,Oet Ceiling: Vaulted R- �q9 Floors: Over unconditioned space R-� Attic R- I Slab on grade Floor R- Walls: .Above grade R-_Doors: R- Below, int. R- - R- Below, est. R- R- V-FacM^ sad SHGC NFRC rating lor) Windows U- 34Z SHGC- WA Default rating,App &, A W9i '.nlb Skylights U- SHGC- MA Tahle 406.2 Optfon(s) Total 406.2 Crsdi& Hearing, Coattag & Domes-dc Sol Hater System Type Efficiency Heating // l✓Q7ktYR t--,P—> aFY 515Z Cooling I3 sea DHW Duct & Building A& LeakW All ducts &: HV.AC in conditioned space I yes ' no i Insulation R- g Air handler present 1 ycs no ) Test 'target _4-%,O CFMfa251ia Test Result CFM(a,25pa Building air leakage target: ACHE„ 1 5.0 - dewed leakage. ACM.,, - t4 , 8 Onsite Regewable Energy Electric Power System System tYpe. Rated annual generation Kwh