2014, 07-21 9810 Duct Leakage AffidavitDuct Leakage Affidavit (New Construction)
Permit #:
House address or lot number: y810 C K%nox five
City: 290icrw,e zip: 9G20f,
Cond. Floor Area (ft2): 1 IG Source (circle one): Plans Estimated ) Measured
❑ Duct tightness testing is not required. The total leakage test is not required for ducts and air handlers located
entirely within the building thermal envelope. Ducts located in crawl spaces do not qualify for this exception.
Air Handler in conditioned space? ❑ yes ® no
Circle Test Method: Leakage to Outside
Air Handler present during test? ❑ yes E no
Total Leakage';
Maximum duct leakage:
Post Construction, total duct leakage: (floor area x .04) = CFM@25 Pa
Post Construction, leakage to outdoors: (floor area x .04) = CFM@25 Pa
Rough -In, total duct leakage with air handler installed: (floor area x .04) _ 41 CFM@25 Pa
Rough -In, total duct leakage with air handler not installed: (floor area x .03) = CFM@25 Pa
Test Result: 3 l CFM@25Pa
Ring (circle one if applicable): Open
Duct Tester Location: S" PT; jlZet-.cu Plev,uN Pressure Tap Location: Lc uy%bn, RM 3op f/Mc.S}e, RM
2z.}urti
I certify that these duct leakage rates are accurate and determined using standard duct testing protocol.
Company Name:
Technician Signature:
Date: 7 - 21-14
Phone Number: (208) 964- sofa
Technician:
Property Address: C12io E Vviok Awe Spi'Arh c \Wi ft O1206
Conditioned Floor Area: 18pp Date: I) 6 11,4
Builder or registered design professional:
IC,I[ Soaahs� Lliuc� (ZaS�9dM'So84
Signature:
r3-Ya�,Oet
Ceiling: Vaulted R- �q9 Floors: Over unconditioned space R-�
Attic R- I Slab on grade Floor R-
Walls: .Above grade R-_Doors: R-
Below, int. R- - R-
Below, est. R- R-
V-FacM^ sad SHGC
NFRC rating lor) Windows U- 34Z SHGC- WA
Default rating,App &, A W9i '.nlb Skylights U- SHGC- MA
Tahle 406.2 Optfon(s) Total 406.2 Crsdi&
Hearing, Coattag & Domes-dc Sol Hater
System
Type
Efficiency
Heating
//
l✓Q7ktYR t--,P—> aFY
515Z
Cooling
I3 sea
DHW
Duct & Building A& LeakW
All ducts &: HV.AC in conditioned space I yes ' no i Insulation R- g
Air handler present 1 ycs no )
Test 'target _4-%,O CFMfa251ia Test Result CFM(a,25pa
Building air leakage target: ACHE„ 1 5.0 - dewed leakage. ACM.,, - t4 , 8
Onsite Regewable Energy Electric Power System
System tYpe. Rated annual generation Kwh