Loading...
2014, 06-12 Permit SW-14000870 SewerSPOKANE COUNTY UTILITIES PERMIT Application Number: SW-14000870 Permit Issued Date: 06/12/2014 Expiration Date: 06/12/2015 Project Description: Project Name: Primary Contact: Phone: PRIVATE SEWER EXTENSION & (4) MAIN/MANHOLE TAP/CUT INS VERADALE PH 2 RASMUSSEN, JOEL / LUCK, SHELDON 206-8383-1817 Address: Phone: Email: Applicant: RASMUSSEN, JOEL / LUCK, SHELDON 6808 S CONKLIN RD GREENACRES, WA 99016 206-8383-1817 SITE INFORMATION: Site Address: Parcel Number: Assessor's Description: Inspection Area: Zoning: 701 N PROGRESS RD 45144.0512 VERA PT OF B51 N1/2 EXC W140FT & EXC N165FT & EXC S7OFT OF N235FT OF E273.1 FT & EXC E1OFT :(509)-477-3675 Owner: Address: Phone: Email: Water District: Vera Irrigation District #15 RASMUSSEN, JOEL / LUCK, SHELDON 6808 S CONKLIN RD GREENACRES, WA 99016 206-8383-1817 Fire District: Spokane Valley Fire Land Area: 1.34 Acre(s) DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER FEE DETAIL: Processing - Utilities Utilities Permit MAIN/MANHOLE TAP/CUT-IN PRIVATE SEWER EXTENSION Total Fee: $26.64 $625.00 $651.64 4 $125.00 $500.00 1 $125.00 $125.00 $625.00 CONDITIONS: Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. Inside Public Transit Benefit Area CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30-MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 06/12/2014 12:32:36 Project Coordinator: Kathy Cummings