Loading...
2014, 09-22 Permit App ROW-2014-0514 Poles# 1/ 2 '■: 09-22-14;01:05PM; ■ ■■ ■ Spokane Valley - Community Development Department Permit Center 11703 East Sprague Avenue, Suite B-3 Spokane Vahiey, WA 99206 Tel: (509) 688-0036 Fax: (509) 688-0037 Qermitcenter(aspoka nevallev.orq (Staff Use Only) PERMIT NUMBER: PERMIT FEE; RIGHT OF WAY (ROW) PERMIT APPLICATION 0 APPROACH 0 CURB & GUTTER PAVEMENT CUT (SEE BELOW) WORK THROUGH MANHOLE 0 SIDEWALK D OTHER ROAD OBSTRUCTION 0 NO K(YES (if yes, complete the following) ' • % of street or # lanes that will be obstructed: ( LA.) • Length of time street will be obstructed: 1 I-1ook5 1=> If work closes more than 50% of a Ioca1 ac ss street, or closes any portion of an arterial street, then a TRAFFIC PLAN IS REQUIRED Pre -Approved TCP Proposed: "7 P , PROJECT ADDRESS: 109 5 APPLICANT'S JOB #: START DATE: 1/2,.,/l/cal PROJECT DESCRIPTI N: I sT1 L(ruC. Ac.ccs' PARCEL NUMBER: LOCATE TICKET # ANTICIPATED COMPLETION DATE: /o z%' %jcl -rd`E5 A -b co / rr ¥RbG Project #-1_ RECEIVED PROPERTY OR BUILDING OWNER INFORMATION (IF APPLICABLE)`£P 2 2 2014 NAME: MAILING ADDRESS: CITY: PHONE: FAX: CENTER STATE: ZIP. R CELL: Fr' CONTRACTOR INFORMATION NAME: VERA WATER & POWER MAILING ADDRESS: PO Box 630 PHONE: (509)924-3800 CONTRACTOR LICENSE NO.: CITY: SPOKANE VALL FAX: (509)922-3929 EXPIRES: CITY BUSINESS LICENSE NO.: STATE: WA zip: 99037 CELL: BOND/INSURANCE CERTIFICATE # (per SVMC Title 10, Article 2); CONTACT NAME: TODD HARMON PHONE: (509)924-3800 Modified April 14, 2014 C:\Usecgrharmon.VERAWP\Documents\Spokane Valley ROWPA.doC Page 1 of 2 Received Time Sep. 22. 2014 12:50PM No.0975 09-22-14;01:05PM; **** IF PAVEMENT CUT, COMPLETE THE FOLLOWING **** # 2/ 2 NATURE OF WORK: (circle one) Gas anr Water CAN Communication Sewer Other TYPE OF CUT/REPAIR: (circle one) Caapja Gravel Concrete Other SIZE OF CUT (width) x (length) 7 k 2_5 STAFF TO COMPLETE: ROAD TIER: PAVEMENT CUT POLICY APPLIES? DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) If this permit Is for construction or on a dwelling, the dwelling Is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit Inures to the property owner. 3) The signatory Is the property owner or has permission to represent the property owner In this transaction. 4) All construction Is to be done In full compliance with the city of Spokane Wiley Development code. Referenced codes are available for review at the Clry of Spokane Wiley Permit Center. 5) The City of Spokane Valley permit Is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional Information may be required to be submitted and subsequently approved before this application can be processed. ,EXPIRATION Right-of-way permits Issued between April 10 and September 30th are valid for 30 days after the date of Issuance, with a one-time 30-day extension available. Right-of-way permits issued between October Y` and March 31st are valid until the following April 30`". Applicant Signattn'e:— --- ce`/ v _� Date: Method of payment: ❑ Cash ❑ Check ❑ Visa** ❑ Mastercard** **If paying with credit card, the City will call for credit card information when the permit is ready to be issued. PLEASE FAX TO CITY OF SPOKANE VALLEY (509) 688-0037 UPON COMPLETION Modified April 14, 2014 Page 2 of 2 C:\Users\tharmon.VERAWP\Documents\Spokane Valley ROWPA.doc Received Time Sep. 22. 2014 12:50PM No.0975