2012, 01-30 Permit App 12000190 Residence to StorageProject Number: 12000190 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Project Information:
Permit Use: CONVERTING SFR TO STORAGE BUILDING Contact: MARSHALKINA, VERA G
Address: 10908 E OLIVE AVE
C - S - Z: SPOKANE, WA 99206-
Setbacks: Front Left: Right: Rear: Phone: (509) 216-1900
Group Name:
Site Information: Project Name:
Plat Key: Name: Range
Date: 1/30/2012 Page 1 of 2
District: Nort
Parcel Number: 45163.0194 Block:
SiteAddress: 11117 E SPRINGFIELD AVE
Location:: CSV
Zoning: R-3 SF Res District
Water District: 011 MODERN
Area: 16,704 Sq Ft Width: 0
Nbr of Bldgs: 0 Nbr of Dwellings: 0
Review Information:
Lot:
Owner: Name: MARSHALKINA, VERA G
Address: 10908 E OLIVE AVE
SPOKANE, WA 99206-
Hold: ❑
Depth: 0 Right Of Way (ft): 0
Review
Building Plan Review
Released By:
Originally Released: 1/27/2012 By: tmelbourn
Landuse/Zoning/HE Conditions
Permits:
Released By:
See conditions of approval
Originally Released: 1/27/2012 By: kkendall
Operator: JD
Printed By: JD
Print Date: 1/30/2012
Project Number: 12000190 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Building Permit
Date: 1/30/2012 Page 2 of 2
Contractor: OWNER Firm: OWNER
Phone: (000) 000-0000
This Application: Total Project:
Description Grp Type Notes Se Ft Valuation Sri Ft Valuation
OTHERBLDG U-1 VB CONVERT 0 $50.00 0 $50.00
SFR TO
STORAGE
Item Description
RESIDENTIAL PERMIT FEE
WSBCC SURCHARGE
SF PLNS RVW < 7999 SQ FT
Totals: 0 $50.00 0 $50.00
Units Unit Desc
1 SELECT
1 SELECT
1 SELECT
Permit Total Fees:
Fee Amount
$69.25
$4.50
$27.70
$101.45
Detached storage building per project # 12-000190 shall be used for residential storage only.
Existing residence being converted to storage only for Duplex to be built (project #: 12-000184). No
access proposed to storage building. If access is taken from Springfield Avenue for storage building,
paving may be required.
Payment Summary:
Permit Type
Building Permit
Fee Amount
$101.45
Invoice Amount
$101.45
Amount Paid Amount Owing,
$27.70 $73.75
$101.45 $101.45 $27.70 $73.75
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: JD Printed By: JD Print Date: 1/30/2012
Target Date sheet
�pakan�~
Valley®
For City Use Only
PLUS Project
Project Address
11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206
509.720-5240 ♦ Fax: 509.688.0037 ♦ permitcenter®spokanevalley.org
As part of our on -going commitment to customer service during the review process of your project application, we are
providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet
this date, we will contact you with a revised target date.
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is
not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
> Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be
several days before they can look at your new or revised information.
> Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise
for dealing with reviewer comments would be the best choice for the entire review process.
> Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your
target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will
save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as
indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does
not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from
substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is
complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review.
Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email,
or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the
application are received, a Permit Specialist will process the application and contact the person specified on your application for
permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at
that time.
CD-003 V-7/ 06-21-11 Page 1 of 1
Spokane
Valley
Community Development Department
Permit Center
11703 East Sprague Avenue, Suite B-3
Spokane Valley, WA 99206
Tel: (509) 688-0036
Fax: (509) 688-0037
oermitcenter@spokaneva Ilev.orq
(Staff Use Only)
PERMIT NUMBER:
PERMIT FEE:
RESIDENTIAL CONSTRUCTION PERMIT APPLICATION
❑ NEW CONSTRUCTION ig ADDITION/REMODEL 1111 ACCESSORY BUILDING
❑ DECK ❑ OTHER
SITE ADDRESS: Sip i'11;-e te? f VE 4Pa c Q/ 22- „ 4S16 3 , 2 / y
ASSESSORS PARCEL NO.: i_/S/6 3. 4/Q 4/ LEGAL DESCRIPTION:
BUILDING OWNER NAME:
NAME: Vella Mai( ,S / / 1 ? /?C a74 A/h,(..a rrtr
ADDRESS: Si /5 /y c ;t Vatt(Ci C C
CITY: S /2 O6; a k.Q I STATE: Gv ZIP: 9 92 O�
PHONE: FAX:
CONTACT NAME:
CELL: (SO
PHONE:
FAX: CELL:
CONTRACTOR NAME: OW 0Q4! .
MAILING ADDRESS:
CITY:
PHONE:
CONTRACTOR LICENSE No.:
STATE:
FAX:
CELL:
EXPIRES: CITY BUSINESS LICENSE NO.:
DESCRIBE THE SCOPE QF WORK IN DETAIL AND INDICATE USE & PROPOSED USE:
C'�i�/Il'-Lf>r7l ,¢S;d rn s
****YOU MUST COMPLETE THE FOLLOWING****
MARK N/A IF NOT APPLICABLE
Height to Peak: i
/D
Dimensions: ) /
2 '/ )< /6
No. of Stories:
Total Habitable
Space:
Main Floor SQ FT:
3217
Upper Floor SQ FT:
Unfinished Basement SQ
FT:
Finished Basement SQ
FT:
Garage SQ FT:
Deck/Covered Patio SQ
FT:
Impervious Surface
Area:
30% Slopes on
Property:
No. of Bedrooms:
Construction Type: _
Heat Source:
Sewer or Septic:
TOTAL COST OF PROJECT: $
5"a
DISCLAIMER
The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will
be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property
owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of
Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of
Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional
information may be required to be submitted and subsequently approved before this application can be processed.
Signature
Date: 0//26- 7/2-
Updated 1-11-11 Page 1 of 1
http://www.spokanevalley.org/filestorage/124/938/210/948/1496/Building_Permit-_Residential_11-11-11.doc
s';� . ne�
jUalley
Project
Transmittal
City of Spokane Valley
Community Development
Department
11703 E. Sprague Ave, Suite B3
Spokane Valley, WA 99206
Phone: 509.688.0036
New project 0
Previous pre-app meeting 0
Plan revisions
Transmittal Date:
Friday, January27, 2012
Site Address: 0 E SPRINGFIELD AVE
Parcel Number: 45163.0194
Zoning: R-3 Water District: MODERN
Fire District: FD 01
Project Number: 12000190
Applicant: MARSHALKINA, VERA G
10908 E OLIVE AVE
SPOKANE, WA 99206-
(509) 216-1900
Owner: MARSHALKINA, VERA G
10908 E OLIVE AVE
SPOKANE, WA 99206-
e-mail: e-mail:
Contact: MARSHALKINA. VERA G Occupant:
10908E OLIVE AVE e-mail:
SPOKANE. WA 99206-
(509) 216-1900
e-mail:
Contractor: OWNER
( ) - 0
Arch / Engineer:
e-mail:
Project CONVERTING SFR TO STORAGE BUILDING
Description:
Building
Landuse
Engineer
Utilities
Health
Fire Dist
Assessor
APPLICATIO
1
PLAN
Please send all plan review and project comments via e-mail to the
highlighted individuals.